{"features":[{"type":"Feature","id":"1008170","properties":{"last_update":1775765056,"route":"US-93","event_id":"1008170","enhanced_report":"<b>US-93  from MP 37.6 to 39.1</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 2/2/2026 7:00 AM<br>End Date: &nbsp;&nbsp;5/13/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR CHANGING ROAD CONDITIONS</p><p><a href=\"http://mdt.mt.gov/pubinvolve/us93npostcreekhill/\" target=\"_blank\"><i>Website</i></a></p>","headline":"Road Work","url":"http://mdt.mt.gov/pubinvolve/us93npostcreekhill/","label":"US-93<br />from MP 37.6 to 39.1","mrm":38.35,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 14 ft until 5:00 PM Wednesday, May 13, 2026.<br />WATCH FOR CHANGING ROAD CONDITIONS","location_description":"US-93 from MP 37.6 to 39.1","dir":"B"},"geometry":{"coordinates":["-114.09683857824","47.4028570162698"],"type":"Point"}},{"geometry":{"coordinates":["-112.665967256596","45.5924838216279"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />Temporary lane and shoulder closures will be in place throughout the duration of the project. Watch for construction equipment on the shoulder of the interstate.","location_description":"I-15 from MP 85.2 to 95.7","dir":"B","category":"cnstr","headline":"Road Work","label":"I-15<br />from MP 85.2 to 95.7","mrm":90.45,"event_id":"1025516","enhanced_report":"<b>I-15  from MP 85.2 to 95.7</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 2/17/2026 7:00 AM<br><p><b>Additional Information:</b><br>Temporary lane and shoulder closures will be in place throughout the duration of the project.  Watch for construction equipment on the shoulder of the interstate.</p>","last_update":1771282541,"route":"I-15"},"type":"Feature","id":"1025516"},{"properties":{"last_update":1774273457,"route":"MT-21","event_id":"1037070","enhanced_report":"<b>MT-21  from MP 0.7 to 20.9</b><br>Detour<br>ROAD CLOSED<br>Speed Limit 35 mph<br>Start Date: 3/2/2026 8:00 AM<br>End Date: &nbsp;&nbsp;9/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Road closure for MT-21 to begin March 02, through mid June 2026.  Replacing a timber bridge.  Travelers must take US-287 or MT-200.  \nPHASE 2/SECOND CLOSURE. CLOSURE BETWEEN RP 0.1 TO RP 0.2. ELK CREEK AND ELK CREEK OVERFLOW. BEGINNING MARCH 21, 2026.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt21bridges\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-21<br />from MP 0.7 to 20.9","url":"https://www.mdt.mt.gov/pubinvolve/mt21bridges","headline":"Road Work","mrm":10.78,"category":"cnstr","report":"The following road construction project is in progress: road closed with speed limit 35 mph and detour until 6:00 PM Tuesday, September 15, 2026.<br />Road closure for MT-21 to begin March 02, through mid June 2026. Replacing a timber bridge. Travelers must take US-287 or MT-200. \nPHASE 2/SECOND CLOSURE. CLOSURE BETWEEN RP 0.1 TO RP 0.2. ELK CREEK AND ELK CREEK OVERFLOW. BEGINNING MARCH 21, 2026.","location_description":"MT-21 from MP 0.7 to 20.9","dir":"B"},"type":"Feature","id":"1037070","geometry":{"coordinates":["-112.146482939071","47.5002016754214"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-111.266388058554","45.6825342748208"]},"type":"Feature","id":"1050646","properties":{"label":"S-288<br />from MP 14.7 to 15.4","headline":"Road Work","mrm":15.05,"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, flaggers, lane closures, speed limit 35 mph, and width limit 12 ft until 4:00 PM Friday, October 30, 2026.<br />Road Re-construction taking place, single lane closure with flaggers controlling traffic.","location_description":"S-288 from MP 14.7 to 15.4","dir":"B","category":"cnstr","last_update":1775914207,"route":"S-288","event_id":"1050646","enhanced_report":"<b>S-288  from MP 14.7 to 15.4</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/6/2026 7:00 AM<br>End Date: &nbsp;&nbsp;10/30/2026 4:00 PM<br><p><b>Additional Information:</b><br>Road Re-construction taking place, single lane closure with flaggers controlling traffic.</p>"}},{"geometry":{"coordinates":["-115.378419591451","47.6046314825812"],"type":"Point"},"properties":{"event_id":"1058893","enhanced_report":"<b>MT-200  from MP 49.2 to 49.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 25-35 mph<br>Width Limit  10 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK. </p>","last_update":1773332149,"route":"MT-200","location_description":"MT-200 from MP 49.2 to 49.4","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 25 to 35 mph, and width limit 10 ft until 7:00 PM Monday, November 16, 2026.<br />ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK.","dir":"B","category":"cnstr","label":"MT-200<br />from MP 49.2 to 49.4","headline":"Road Work","mrm":49.3},"type":"Feature","id":"1058893"},{"geometry":{"type":"Point","coordinates":["-112.141252755761","47.7663722839213"]},"properties":{"mrm":37.45,"url":"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx","label":"US-89<br />from MP 34.3 to 40.6","headline":"Road Work","dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 to 55 mph until further notice.<br />M.A DeAtley will continue to excavate embankment from within the Right-of-Way to build the subgrade for the new road alignment. Pulverization of the existing roadway will take place moving traffic onto a gravel surface. One Lane traffic with alternating signal lights will be in place over night from approx. MP35.5. Detour Bridge construction is also set to begin 4/20. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.","location_description":"US-89 from MP 34.3 to 40.6","category":"cnstr","route":"US-89","last_update":1776860353,"enhanced_report":"<b>US-89  from MP 34.3 to 40.6</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35-55 mph<br>Start Date: 3/19/2026 2:14 PM<br><p><b>Additional Information:</b><br>M.A DeAtley will continue to excavate embankment from within the Right-of-Way to build the subgrade for the new road alignment. Pulverization of the existing roadway will take place moving traffic onto a gravel surface. One Lane traffic with alternating signal lights will be in place over night from approx. MP35.5. Detour Bridge construction is also set to begin 4/20.  Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1072371"},"type":"Feature","id":"1072371"},{"geometry":{"coordinates":["-113.88390997677","47.958308153158"],"type":"Point"},"id":"1073251","type":"Feature","properties":{"label":"MT-83<br />from MP 70.5 to 78.5","url":"https://www.mdt.mt.gov/pubinvolve/mt83bridges/","headline":"Road Work","mrm":74.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, October 30, 2026.<br />The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. anticipate beginning the week of March 23, 2026, along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek, weather and other factors permitting. Work includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas.","location_description":"MT-83 from MP 70.5 to 78.5","dir":"B","last_update":1774030374,"route":"MT-83","event_id":"1073251","enhanced_report":"<b>MT-83  from MP 70.5 to 78.5</b><br>Travel Delay 15 mins<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;10/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. anticipate beginning the week of March 23, 2026, along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek, weather and other factors permitting. Work includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas. \n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt83bridges/\" target=\"_blank\"><i>Website</i></a></p>"}},{"geometry":{"type":"Point","coordinates":["-111.076207762342","45.72259346834"]},"type":"Feature","id":"1078555","properties":{"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, lane closures, and speed limit 35 to 55 mph until 5:00 PM Tuesday, September 1, 2026.<br />Bridge deck work at MP 303.6. Milling, paving, guardrail, and signing to begin April 19. Work shift 7pm to 7am.","location_description":"I-90 from MP 301.3 to 307.4","mrm":304.35,"headline":"Road Work","label":"I-90<br />from MP 301.3 to 307.4","enhanced_report":"<b>I-90  from MP 301.3 to 307.4</b><br>Motorcycles consider alternate route<br>Lane closures<br>Speed Limit 35-55 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge deck work at MP 303.6.  Milling, paving, guardrail, and signing to begin April 19. Work shift 7pm to 7am.  \n</p>","event_id":"1078555","route":"I-90","last_update":1776909980}},{"properties":{"headline":"Road Work","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","label":"US-89<br />at MP 0.0","mrm":0,"report":"The following road construction project is in progress: road closed with speed limit 35 mph and detour until 5:00 PM Friday, July 31, 2026.<br />Bridge work on Exit 340 overpass structure. The bridge is closed to all traffic. Southbound US-89 traffic must enter I-90 westbound and turn around at Exit 337 to access eastbound I-90. Eastbound I-90 traffic must pass Exit 340 and turn around at Exit 343 to access northbound US-89. Mission Field is accessible from the eastbound I-90 on and off ramps.","location_description":"US-89 at MP 0.0","dir":"B","category":"cnstr","last_update":1775483169,"route":"US-89","event_id":"1079159","enhanced_report":"<b>US-89  at MP 0.0</b><br>Detour<br>ROAD CLOSED<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:30 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Exit 340 overpass structure.  The bridge is closed to all traffic. Southbound US-89 traffic must enter I-90 westbound and turn around at Exit 337 to access eastbound I-90.  Eastbound I-90 traffic must pass Exit 340 and turn around at Exit 343 to access northbound US-89.  Mission Field is accessible from the eastbound I-90 on and off ramps.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>"},"id":"1079159","type":"Feature","geometry":{"type":"Point","coordinates":["-110.455067411368","45.7065811633097"]}},{"properties":{"route":"I-90B","last_update":1776729944,"enhanced_report":"<b>I-90B  at MP 58.0</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 7:00 PM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Exit 337 overpass structure.  Single lane traffic and  width restriction.  Expect short delays.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1079160","mrm":57.97,"label":"I-90B<br />at MP 58.0","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","headline":"Road Work","dir":"B","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work on Exit 337 overpass structure. Single lane traffic and width restriction. Expect short delays.","location_description":"I-90B at MP 58.0","category":"cnstr"},"type":"Feature","id":"1079160","geometry":{"coordinates":["-110.500274302856","45.6881050838335"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.376472583129","45.9151275204233"]},"type":"Feature","id":"1079783","properties":{"label":"I-90<br />at MP 235.0","headline":"Road Work","mrm":235,"category":"cnstr","report":"The following road construction project is in progress: road construction until further notice.<br />I-90 EB & WB REST AREAS/PARKING AREAS WILL BE CLOSED STARTING 03/30 FOR MAINTENANCE","location_description":"I-90 at MP 235.0","dir":"B","last_update":1774640511,"route":"I-90","event_id":"1079783","enhanced_report":"<b>I-90  at MP 235.0</b><br>Start Date: 3/30/2026 8:00 AM<br><p><b>Additional Information:</b><br>I-90 EB & WB REST AREAS/PARKING AREAS WILL BE CLOSED STARTING 03/30 FOR MAINTENANCE</p>"}},{"properties":{"route":"MT-16","last_update":1774643965,"enhanced_report":"<b>MT-16 NB from MP 28.9 to 37.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 3/30/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAVEL</p>","event_id":"1080144","mrm":33.2,"label":"MT-16<br />from MP 28.9 to 37.5","headline":"Road Work","category":"cnstr","dir":"N","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Sunday, November 15, 2026.<br />ALTERNATING SINGLE LANE TRAVEL","location_description":"MT-16 from MP 28.9 to 37.5"},"type":"Feature","id":"1080144","geometry":{"coordinates":["-104.343020312928","47.4714193988865"],"type":"Point"}},{"properties":{"mrm":256.85,"headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/why200jordan/","label":"MT-200<br />from MP 253.5 to 260.2","dir":"B","location_description":"MT-200 from MP 253.5 to 260.2","report":"The following road construction project is in progress: road construction with speed limit 35 mph and travel delay 15 mins until further notice.<br />Expect work zones with reduced speeds. Construction equipment will be working near the shoulders and south side of the existing roadway.","category":"cnstr","route":"MT-200","last_update":1775077630,"enhanced_report":"<b>MT-200  from MP 253.5 to 260.2</b><br>Travel Delay 15 mins<br>Speed Limit 35 mph<br>Start Date: 4/1/2026 3:04 PM<br><p><b>Additional Information:</b><br>Expect work zones with reduced speeds. Construction equipment will be working near the shoulders and south side of the existing roadway.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/why200jordan/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1084419"},"type":"Feature","id":"1084419","geometry":{"type":"Point","coordinates":["-105.995986426994","47.3213564526461"]}},{"geometry":{"coordinates":["-107.142506718359","46.4634120172561"],"type":"Point"},"properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, detour, flaggers, lane closures, speed limit 25 mph, and width limit 14 ft until 5:00 PM Friday, December 11, 2026.<br />The road will contain loose gravel. 14' Width Restriction.","location_description":"US-12 from MP 228.0 to 260.0","dir":"B","headline":"Road Work","url":"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx ","label":"US-12<br />from MP 228.0 to 260.0","mrm":244,"event_id":"1085227","enhanced_report":"<b>US-12  from MP 228.0 to 260.0</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Detour<br>Flaggers<br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/2/2026 7:48 AM<br>End Date: &nbsp;&nbsp;12/11/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road will contain loose gravel.  14' Width Restriction.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx \" target=\"_blank\"><i>Website</i></a></p>","last_update":1775516032,"route":"US-12"},"type":"Feature","id":"1085227"},{"geometry":{"type":"Point","coordinates":["-113.829747901698","47.835557733804"]},"id":"1087909","type":"Feature","properties":{"enhanced_report":"<b>MT-83  from MP 45.0 to 84.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/6/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 12:00 AM<br><p><b>Additional Information:</b><br>The project is scheduled to be completed by the end of August, weather and other factors permitting. Crews will be working from 6 a.m. to 6 p.m. The purpose of this construction project is to extend the service life of the roadway.\nFollow all posted signage and watch for workers and equipment.\n</p>","event_id":"1087909","route":"MT-83","last_update":1776452682,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 12:00 AM Friday, August 28, 2026.<br />The project is scheduled to be completed by the end of August, weather and other factors permitting. Crews will be working from 6 a.m. to 6 p.m. The purpose of this construction project is to extend the service life of the roadway.\nFollow all posted signage and watch for workers and equipment.","location_description":"MT-83 from MP 45.0 to 84.0","mrm":64.5,"headline":"Road Work","label":"MT-83<br />from MP 45.0 to 84.0"}},{"properties":{"enhanced_report":"<b>I-15  from MP 217.5 to 221.7</b><br>Lane closures<br>Speed Limit 45-55 mph<br>Length Limit  95 feet<br>Width Limit  12 feet<br>Start Date: 4/13/2026 5:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB and SB single lane closures with reduced speed. A 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/i15sieben/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1088646","route":"I-15","last_update":1776270407,"category":"cnstr","dir":"B","location_description":"I-15 from MP 217.5 to 221.7","report":"The following road construction project is in progress: road construction with lane closures, length limit 95 ft, speed limit 45 to 55 mph, and width limit 12 ft until 7:00 PM Tuesday, September 1, 2026.<br />NB and SB single lane closures with reduced speed. A 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday.","mrm":219.6,"url":"https://mdt.mt.gov/pubinvolve/i15sieben/","label":"I-15<br />from MP 217.5 to 221.7","headline":"Road Work"},"type":"Feature","id":"1088646","geometry":{"type":"Point","coordinates":["-112.123169171667","46.9250655070607"]}},{"geometry":{"coordinates":["-110.93348339271","45.6466655212862"],"type":"Point"},"properties":{"last_update":1775512454,"route":"I-90","event_id":"1089262","enhanced_report":"<b>I-90  from MP 309.0 to 319.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>Intermittent single lane closures for signing installation.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90bearcanyon/\" target=\"_blank\"><i>Website</i></a></p>","label":"I-90<br />from MP 309.0 to 319.0","url":"https://www.mdt.mt.gov/pubinvolve/i90bearcanyon/","headline":"Road Work","mrm":314,"location_description":"I-90 from MP 309.0 to 319.0","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Wednesday, July 15, 2026.<br />Intermittent single lane closures for signing installation.","dir":"B","category":"cnstr"},"type":"Feature","id":"1089262"},{"geometry":{"coordinates":["-114.659148050516","47.0192496448387"],"type":"Point"},"id":"1089372","type":"Feature","properties":{"event_id":"1089372","enhanced_report":"<b>I-90  from MP 66.1 to 66.4</b><br>Start Date: 4/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90alberton/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1775576768,"route":"I-90","report":"The following road construction project is in progress: road construction until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.","location_description":"I-90 from MP 66.1 to 66.4","dir":"B","category":"cnstr","url":"https://www.mdt.mt.gov/pubinvolve/i90alberton/","headline":"Road Work","label":"I-90<br />from MP 66.1 to 66.4","mrm":66.25}},{"geometry":{"coordinates":["-107.341390692695","45.0711171025439"],"type":"Point"},"type":"Feature","id":"1089376","properties":{"last_update":1775600852,"route":"I-90","event_id":"1089376","enhanced_report":"<b>I-90  from MP 543.5 to 554.4</b><br>Detour<br>Lane closures<br>Speed Limit 45 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Wyola Interchange will be closed beginning 4/13/26. Use alternate route.</p>","headline":"Road Work","label":"I-90<br />from MP 543.5 to 554.4","mrm":548.95,"report":"The following road construction project is in progress: road construction with detour, lane closures, and speed limit 45 mph until 5:00 PM Friday, July 31, 2026.<br />Wyola Interchange will be closed beginning 4/13/26. Use alternate route.","location_description":"I-90 from MP 543.5 to 554.4","dir":"B","category":"cnstr"}},{"geometry":{"type":"Point","coordinates":["-109.72685049899","48.6058738254819"]},"id":"1089377","type":"Feature","properties":{"location_description":"S-232 from MP 0.8 to 10.0","report":"The following road construction project is in progress: road construction with speed limit 35 to 70 mph until 6:00 PM Sunday, July 12, 2026.<br />Workers conditioning seeding areas and installing signs along the route with reduced speeds where workers are present. Travelers can expect little to no delays, but slow down for workers and equipment along the highway. All driving surfaces are paved. Work will be performed during daylight hours Monday through Friday. For questions about the project, call (406) 384-9823","dir":"B","category":"cnstr","headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/havrenw/","label":"S-232<br />from MP 0.8 to 10.0","mrm":5.4,"event_id":"1089377","enhanced_report":"<b>S-232  from MP 0.8 to 10.0</b><br>Speed Limit 35-70 mph<br>Start Date: 4/7/2026 10:04 AM<br>End Date: &nbsp;&nbsp;7/12/2026 6:00 PM<br><p><b>Additional Information:</b><br>Workers conditioning seeding areas and installing signs along the route with reduced speeds where workers are present. Travelers can expect little to no delays, but slow down for workers and equipment along the highway. All driving surfaces are paved. Work will be performed during daylight hours Monday through Friday. For questions about the project, call (406) 384-9823</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/havrenw/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1775578259,"route":"S-232"}},{"geometry":{"coordinates":["-105.067999357911","46.8808194421691"],"type":"Point"},"type":"Feature","id":"1089484","properties":{"last_update":1775595666,"route":"I-94","event_id":"1089484","enhanced_report":"<b>I-94  from MP 187.1 to 192.6</b><br>Median crossover detours<br>Speed Limit 36-65 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WEST BOUND TRAFFIC MERGES TO EAST BOUND PASSING LANE WITH MEDIAN DETOURS</p>","headline":"Road Work","label":"I-94<br />from MP 187.1 to 192.6","mrm":189.85,"category":"cnstr","report":"The following road construction project is in progress: road construction with median crossover detours, speed limit 36 to 65 mph, and width limit 16 ft until 5:00 PM Sunday, November 15, 2026.<br />WEST BOUND TRAFFIC MERGES TO EAST BOUND PASSING LANE WITH MEDIAN DETOURS","location_description":"I-94 from MP 187.1 to 192.6","dir":"B"}},{"properties":{"dir":"B","location_description":"I-15 from MP 0.0 to 57.0","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE /\nINTERMITTANT SINGLE LANE TRAFFIC ON THE BRIDGES BETWEEN MM 0-57 --","category":"cnstr","mrm":28.5,"headline":"Road Work","label":"I-15<br />from MP 0.0 to 57.0","enhanced_report":"<b>I-15  from MP 0.0 to 57.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/10/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE /\nINTERMITTANT SINGLE LANE TRAFFIC ON THE BRIDGES BETWEEN MM 0-57 --  \n</p>","event_id":"1089780","route":"I-15","last_update":1775913305},"type":"Feature","id":"1089780","geometry":{"type":"Point","coordinates":["-112.757534315669","44.7822686847715"]}},{"geometry":{"coordinates":["-104.275406161318","46.3682326709782"],"type":"Point"},"id":"1089800","type":"Feature","properties":{"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with detour, lane closures, speed limit 35 mph, and width limit 24 ft until 5:00 PM Tuesday, September 29, 2026.<br />Traffic traveling on Paved detour","location_description":"MT-7 from MP 35.0 to 36.0","mrm":35.5,"label":"MT-7<br />from MP 35.0 to 36.0","headline":"Road Work","enhanced_report":"<b>MT-7  from MP 35.0 to 36.0</b><br>Detour<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  24 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Traffic traveling on Paved detour \n\n</p>","event_id":"1089800","route":"MT-7","last_update":1775662991}},{"properties":{"event_id":"1089837","enhanced_report":"<b>I-90  from MP 0.0 to 5.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Median crossover detours<br>Speed Limit 35-55 mph<br>Width Limit  18 feet<br>Start Date: 4/8/2026 10:28 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n18 ft. width restrictions.\nStaging areas for oversize loads will be Westbound at the Deborgia, MT weigh station, and Eastbound at Mullan, Idaho.\nOversize load contact: Poteet Construction Inc., 406-360-3107\n</p>","last_update":1776180089,"route":"I-90","category":"cnstr","location_description":"I-90 from MP 0.0 to 5.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, median crossover detours, speed limit 35 to 55 mph, and width limit 18 ft until 7:00 PM Monday, November 16, 2026.<br />East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n18 ft. width restrictions.\nStaging areas for oversize loads will be Westbound at the Deborgia, MT weigh station, and Eastbound at Mullan, Idaho.\nOversize load contact: Poteet Construction Inc., 406-360-3107","dir":"B","label":"I-90<br />from MP 0.0 to 5.0","headline":"Road Work","mrm":2.5},"id":"1089837","type":"Feature","geometry":{"type":"Point","coordinates":["-115.661019640764","47.4353615400145"]}},{"properties":{"mrm":0.11,"label":"CENTENNIAL AVE","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","headline":"Road Work","report":"The following road construction project is in progress: road construction with lane closures and detour until 5:00 PM Saturday, August 1, 2026.<br />Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd. Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection. Closure begins Monday, April 13 and is expected to continue through July.","location_description":"CENTENNIAL AVE","category":"cnstr","route":"CENTENNIAL AVE","last_update":1775763756,"enhanced_report":"<b>CENTENNIAL AVE</b><br>Detour<br>Lane closures<br>Start Date: 4/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd.  Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection.  Closure begins Monday, April 13 and is expected to continue through July.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1090108"},"type":"Feature","id":"1090108","geometry":{"coordinates":["-112.560568877555","45.9987575811237"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.47707174804","45.9763958002525"]},"properties":{"url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","headline":"Road Work","label":"I-90<br />from MP 227.0 to 228.0","mrm":227.5,"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, detour, flaggers, median crossover detours, speed limit 45 mph, and width limit 16 ft until 5:00 PM Saturday, August 1, 2026.<br />I-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road. The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection.","location_description":"I-90 from MP 227.0 to 228.0","dir":"B","category":"cnstr","last_update":1775766114,"route":"I-90","event_id":"1090121","enhanced_report":"<b>I-90  from MP 227.0 to 228.0</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Median crossover detours<br>Speed Limit 45 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>I-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road.  The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>"},"id":"1090121","type":"Feature"},{"id":"1090140","type":"Feature","properties":{"route":"S-222","last_update":1775846865,"enhanced_report":"<b>S-222  from MP 2.3 to 2.7</b><br>Motorcycles consider alternate route<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;5/31/2026 6:00 PM<br><p><b>Additional Information:</b><br>REALIGNING THE CURVE, WIDENING SHOULDERS, FLATTENING SLOPES</p>","event_id":"1090140","mrm":2.53,"label":"S-222<br />from MP 2.3 to 2.7","headline":"Road Work","dir":"B","location_description":"S-222 from MP 2.3 to 2.7","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, lane closures, pilot car, and speed limit 35 mph until 6:00 PM Sunday, May 31, 2026.<br />REALIGNING THE CURVE, WIDENING SHOULDERS, FLATTENING SLOPES","category":"cnstr"},"geometry":{"coordinates":["-112.673518543984","45.1818410282557"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.10240445227","45.8779612788648"]},"properties":{"mrm":249,"label":"I-90<br />from MP 248.0 to 250.0","headline":"Road Work","category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />Lane closures will be in place for construction of median crossover.","location_description":"I-90 from MP 248.0 to 250.0","route":"I-90","last_update":1775836561,"enhanced_report":"<b>I-90  from MP 248.0 to 250.0</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 4/13/2026 7:00 AM<br><p><b>Additional Information:</b><br>Lane closures will be in place for construction of median crossover.</p>","event_id":"1090183"},"id":"1090183","type":"Feature"},{"id":"1090189","type":"Feature","properties":{"enhanced_report":"<b>US-93  from MP 129.7 to 133.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/27/2026 5:00 PM<br><p><b>Additional Information:</b><br>Hours are Monday thru Sunday from 6 a.m. to 8 p.m., dependent on weather and other unforeseen circumstances. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays.</p>","event_id":"1090189","route":"US-93","last_update":1775842288,"dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, November 27, 2026.<br />Hours are Monday thru Sunday from 6 a.m. to 8 p.m., dependent on weather and other unforeseen circumstances. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays.","location_description":"US-93 from MP 129.7 to 133.0","category":"cnstr","mrm":131.35,"label":"US-93<br />from MP 129.7 to 133.0","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-114.405796224872","48.40363902689"]}},{"geometry":{"coordinates":["-115.918591257437","48.4966916288793"],"type":"Point"},"type":"Feature","id":"1090190","properties":{"enhanced_report":"<b>US-2  from MP 11.0 to 12.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Lane closure with flaggers. Speed limit posted to 35MPH. 12FT Width restrictions.</p>","event_id":"1090190","route":"US-2","last_update":1776081756,"dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, signal lights, speed limit 35 mph, and width limit 12 ft until 5:00 PM Friday, July 31, 2026.<br />Lane closure with flaggers. Speed limit posted to 35MPH. 12FT Width restrictions.","location_description":"US-2 from MP 11.0 to 12.0","category":"cnstr","mrm":11.5,"label":"US-2<br />from MP 11.0 to 12.0","headline":"Road Work"}},{"geometry":{"coordinates":["-115.322693378601","48.3655987456692"],"type":"Point"},"properties":{"last_update":1775846641,"route":"MT-37","event_id":"1090191","enhanced_report":"<b>MT-37  from MP 13.8 to 13.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />from MP 13.8 to 13.9","headline":"Road Work","mrm":13.85,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 from MP 13.8 to 13.9","dir":"B","category":"cnstr"},"type":"Feature","id":"1090191"},{"properties":{"event_id":"1090192","enhanced_report":"<b>I-90  from MP 253.0 to 284.0</b><br>Lane closures<br>Speed Limit 55 mph<br>Width Limit  14 feet<br>Start Date: 4/13/2026 7:00 AM<br><p><b>Additional Information:</b><br>A 14 FT. width restriction will be in place on I-90 from MM 253 to 284.  An alternate route will need to be used.\n\nLane closures and reduced speeds will be in place for bridge work from MM 263 to 265.\n</p>","last_update":1776723155,"route":"I-90","location_description":"I-90 from MP 253.0 to 284.0","report":"The following road construction project is in progress: road construction with lane closures, speed limit 55 mph, and width limit 14 ft until further notice.<br />A 14 FT. width restriction will be in place on I-90 from MM 253 to 284. An alternate route will need to be used.\n\nLane closures and reduced speeds will be in place for bridge work from MM 263 to 265.","dir":"B","category":"cnstr","headline":"Road Work","label":"I-90<br />from MP 253.0 to 284.0","mrm":268.5},"type":"Feature","id":"1090192","geometry":{"coordinates":["-111.725896112961","45.9149892969352"],"type":"Point"}},{"properties":{"last_update":1775845108,"route":"MT-37","event_id":"1090193","enhanced_report":"<b>MT-37  at MP 23.3</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 23.3","headline":"Road Work","mrm":23.3,"category":"cnstr","location_description":"MT-37 at MP 23.3","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","dir":"B"},"type":"Feature","id":"1090193","geometry":{"coordinates":["-115.255883243005","48.4761950786896"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-115.210054176294","48.535877185965"]},"type":"Feature","id":"1090194","properties":{"event_id":"1090194","enhanced_report":"<b>MT-37  at MP 29.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775845352,"route":"MT-37","category":"cnstr","location_description":"MT-37 at MP 29.4","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","dir":"B","headline":"Road Work","label":"MT-37<br />at MP 29.4","mrm":29.4}},{"geometry":{"coordinates":["-115.206537723938","48.5954033368767"],"type":"Point"},"properties":{"enhanced_report":"<b>MT-37  at MP 34.1</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","event_id":"1090196","route":"MT-37","last_update":1775845545,"category":"cnstr","dir":"B","location_description":"MT-37 at MP 34.1","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","mrm":34.1,"headline":"Road Work","label":"MT-37<br />at MP 34.1"},"type":"Feature","id":"1090196"},{"geometry":{"coordinates":["-115.26574521557","48.6277169631435"],"type":"Point"},"properties":{"last_update":1775845715,"route":"MT-37","event_id":"1090197","enhanced_report":"<b>MT-37  at MP 37.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 37.9","headline":"Road Work","mrm":37.9,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 37.9","dir":"B","category":"cnstr"},"type":"Feature","id":"1090197"},{"geometry":{"type":"Point","coordinates":["-115.285431578056","48.7598371624946"]},"type":"Feature","id":"1090198","properties":{"last_update":1775845901,"route":"MT-37","event_id":"1090198","enhanced_report":"<b>MT-37  at MP 48.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","headline":"Road Work","label":"MT-37<br />at MP 48.5","mrm":48.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 48.5","dir":"B"}},{"properties":{"event_id":"1090199","enhanced_report":"<b>MT-37  at MP 63.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775846016,"route":"MT-37","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 63.9","dir":"B","category":"cnstr","headline":"Road Work","label":"MT-37<br />at MP 63.9","mrm":63.9},"id":"1090199","type":"Feature","geometry":{"coordinates":["-115.117262468785","48.8947606118414"],"type":"Point"}},{"geometry":{"coordinates":["-110.454207310453","45.7069261946315"],"type":"Point"},"properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Friday, May 8, 2026.<br />I-90 Eastbound and Westbound will see single lane closures for bridge work","location_description":"I-90 from MP 340.0 to 341.0","dir":"B","label":"I-90<br />from MP 340.0 to 341.0","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","headline":"Road Work","mrm":340.5,"event_id":"1090382","enhanced_report":"<b>I-90  from MP 340.0 to 341.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;5/8/2026 5:00 PM<br><p><b>Additional Information:</b><br>I-90 Eastbound and Westbound will see single lane closures for bridge work</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1776725860,"route":"I-90"},"type":"Feature","id":"1090382"},{"properties":{"last_update":1776343228,"route":"Peerless Lustre Road","event_id":"1090483","enhanced_report":"<b>Peerless Lustre Road</b><br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Start Date: 4/14/2026 8:57 AM<br><p><b>Additional Information:</b><br>CONTRACTOR OVERLAY ON PEERLESS LUSTRE RD MM 0-2</p>","headline":"Road Work","label":"Peerless Lustre Road","mrm":0,"category":"cnstr","location_description":"Peerless Lustre Road","report":"The following road construction project is in progress: road construction with flaggers, lane closures, pilot car, and speed limit 35 mph until further notice.<br />CONTRACTOR OVERLAY ON PEERLESS LUSTRE RD MM 0-2"},"id":"1090483","type":"Feature","geometry":{"coordinates":["-105.824828314238","48.7951476883389"],"type":"Point"}},{"id":"1090601","type":"Feature","properties":{"dir":"E","location_description":"US-2 from MP 383.2 to 383.4","report":"The following road construction project is in progress: road construction with lane closures eastbound until further notice.<br />EAST bound single lane closure due to city of Havre water main repair. Watch for equipment and workers.","category":"cnstr","mrm":383.29,"label":"US-2<br />from MP 383.2 to 383.4","headline":"Road Work","enhanced_report":"<b>US-2 EB from MP 383.2 to 383.4</b><br>Lane closures<br>Start Date: 4/15/2026 2:11 PM<br><p><b>Additional Information:</b><br>EAST bound single lane closure due to city of Havre water main repair. Watch for equipment and workers.</p>","event_id":"1090601","route":"US-2","last_update":1776283971},"geometry":{"type":"Point","coordinates":["-109.661986332018","48.5520656328456"]}},{"geometry":{"type":"Point","coordinates":["-106.915392427053","47.3608255342406"]},"type":"Feature","id":"1091062","properties":{"last_update":1776351618,"route":"S-543","event_id":"1091062","enhanced_report":"<b>S-543</b><br>Detour<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/20/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 7:00 PM<br><p><b>Additional Information:</b><br>Bridge Replacement 2Km North of Jordan at Vail creek. This is a 35 mph gravel road.</p>","label":"S-543","headline":"Road Work","mrm":0,"category":"cnstr","report":"The following road construction project is in progress: road construction with detour, speed limit 25 mph, and width limit 14 ft until 7:00 PM Friday, August 28, 2026.<br />Bridge Replacement 2Km North of Jordan at Vail creek. This is a 35 mph gravel road.","location_description":"S-543"}},{"properties":{"enhanced_report":"<b>I-15  from MP 98.0 to 111.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 5/4/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 6:00 PM<br><p><b>Additional Information:</b><br>Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15</p>","event_id":"1091143","route":"I-15","last_update":1776358480,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: from 6:00 AM Monday, May 4, 2026 road construction with lane closures, speed limit 35 mph, and width limit 16 ft until 6:00 PM Friday, August 28, 2026.<br />Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15","location_description":"I-15 from MP 98.0 to 111.0","mrm":104.5,"label":"I-15<br />from MP 98.0 to 111.0","headline":"Road Work"},"id":"1091143","type":"Feature","geometry":{"type":"Point","coordinates":["-112.721258898252","45.7820830259122"]}},{"type":"Feature","id":"1091201","properties":{"location_description":"N HIGHWAY 91","report":"The following road construction project is in progress: road construction with travel delay 5 mins, flaggers, lane closures, signal lights, and speed limit 30 mph until further notice.<br />Temporary lane closures are in place for road construction. Flaggers and traffic lights are controlling traffic on both ends of the work zone.","category":"cnstr","mrm":1,"headline":"Road Work","label":"N HIGHWAY 91","enhanced_report":"<b>N HIGHWAY 91</b><br>Travel Delay 5 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 30 mph<br>Start Date: 4/16/2026 12:28 PM<br><p><b>Additional Information:</b><br>Temporary lane closures are in place for road construction.  Flaggers and traffic lights are controlling traffic on both ends of the work zone.</p>","event_id":"1091201","route":"N HIGHWAY 91","last_update":1776364240},"geometry":{"type":"Point","coordinates":["-112.632712739239","45.239533400493"]}},{"geometry":{"coordinates":["-111.424980155673","45.8811268484029"],"type":"Point"},"id":"1091963","type":"Feature","properties":{"event_id":"1091963","enhanced_report":"<b>I-90  from MP 282.0 to 286.0</b><br>Lane closures<br>Speed Limit 35-55 mph<br>Width Limit  14 feet<br>Start Date: 4/22/2026 7:25 AM<br><p><b>Additional Information:</b><br>EB AND WB PASSING LANES ARE CLOSED - SPEED LIMIT VARIES FROM 35 MPH TO 55 MPH - A 14Ã¢ÂÂ WIDTH RESTRICTION WILL BE IN PLACE ON I-90 EB AND WB FROM MM 253 TO MM 284, AND ALTERNATE ROUTES WILL NEED TO BE USED.\nLANE CLOSURES AND REDUCED SPEEDS IN PLACE FOR CROSSOVER CONSTRUCTION.\n\n</p>","last_update":1776872376,"route":"I-90","category":"cnstr","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 to 55 mph, and width limit 14 ft until further notice.<br />EB AND WB PASSING LANES ARE CLOSED - SPEED LIMIT VARIES FROM 35 MPH TO 55 MPH - A 14Ã¢ÂÂ WIDTH RESTRICTION WILL BE IN PLACE ON I-90 EB AND WB FROM MM 253 TO MM 284, AND ALTERNATE ROUTES WILL NEED TO BE USED.\nLANE CLOSURES AND REDUCED SPEEDS IN PLACE FOR CROSSOVER CONSTRUCTION.","location_description":"I-90 from MP 282.0 to 286.0","dir":"B","label":"I-90<br />from MP 282.0 to 286.0","headline":"Road Work","mrm":284}},{"geometry":{"coordinates":["-111.990454274355","45.8753018790319"],"type":"Point"},"type":"Feature","id":"1091980","properties":{"enhanced_report":"<b>I-90  from MP 252.0 to 257.0</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 4/22/2026 9:17 AM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","event_id":"1091980","route":"I-90","last_update":1776871223,"dir":"B","report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />WATCH FOR WORKERS","location_description":"I-90 from MP 252.0 to 257.0","category":"cnstr","mrm":254.5,"label":"I-90<br />from MP 252.0 to 257.0","headline":"Road Work"}},{"geometry":{"coordinates":["-105.998819532184","45.5645991046656"],"type":"Point"},"properties":{"event_id":"1092027","enhanced_report":"<b>US-212  from MP 74.8 to 77.8</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/28/2026 9:00 AM<br>End Date: &nbsp;&nbsp;4/28/2026 4:00 PM<br><p><b>Additional Information:</b><br>Installing traffic sensor in the EB Lane on 04/28 from 9:00 am - 4:00 pm</p>","last_update":1776889064,"route":"US-212","report":"The following road construction project is in progress: from 9:00 AM Tuesday, April 28, 2026 road construction with flaggers, lane closures, speed limit 35 mph, and width limit 12 ft until 4:00 PM Tuesday, April 28, 2026.<br />Installing traffic sensor in the EB Lane on 04/28 from 9:00 am - 4:00 pm","location_description":"US-212 from MP 74.8 to 77.8","dir":"B","category":"cnstr","headline":"Road Work","label":"US-212<br />from MP 74.8 to 77.8","mrm":76.3},"id":"1092027","type":"Feature"},{"properties":{"enhanced_report":"<b>I-90  from MP 122.0 to 124.0</b><br>Left lane CLOSED<br>Speed Limit 55 mph<br>Start Date: 4/23/2026 7:00 AM<br>End Date: &nbsp;&nbsp;4/24/2026 5:00 PM<br><p><b>Additional Information:</b><br>Road work on I-90 EB and WB from mile post 122 to 124. Expect left lane closures and reduced speeds while work is in progress. Median cable rail installation operations will take place Thursday through Friday.</p><p><a href=\" https://www.mdt.mt.gov/pubinvolve/mtmcr/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1092091","route":"I-90","last_update":1776908823,"dir":"B","report":"The following road construction project is in progress: road construction with speed limit 55 mph and left lane closed until 5:00 PM Friday, April 24, 2026.<br />Road work on I-90 EB and WB from mile post 122 to 124. Expect left lane closures and reduced speeds while work is in progress. Median cable rail installation operations will take place Thursday through Friday.","location_description":"I-90 from MP 122.0 to 124.0","category":"cnstr","mrm":123,"url":" https://www.mdt.mt.gov/pubinvolve/mtmcr/","label":"I-90<br />from MP 122.0 to 124.0","headline":"Road Work"},"type":"Feature","id":"1092091","geometry":{"coordinates":["-113.706931521602","46.7520545092413"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.783541114324","46.1816766267562"]},"type":"Feature","id":"1092797","properties":{"last_update":1776977220,"route":"I-90","event_id":"1092797","enhanced_report":"<b>I-90  at MP 201.6</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/27/2026 7:00 AM<br>End Date: &nbsp;&nbsp;5/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge repair work in progress.  Single lane traffic being controlled by signal lights.  Work starting 4/27, weather permitting.  Traffic will only be impacted for a few days.</p>","label":"I-90<br />at MP 201.6","headline":"Road Work","mrm":201.55,"location_description":"I-90 at MP 201.6","report":"The following road construction project is in progress: from 7:00 AM Monday, April 27, 2026 road construction with lane closures, signal lights, and speed limit 35 mph until 5:00 PM Friday, May 1, 2026.<br />Bridge repair work in progress. Single lane traffic being controlled by signal lights. Work starting 4/27, weather permitting. Traffic will only be impacted for a few days.","dir":"B","category":"cnstr"}},{"type":"Feature","id":"674876","properties":{"dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until further notice.<br />Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.","location_description":"S-548 from MP 0.0 to 1.3","category":"cnstr","mrm":0.67,"url":"https://mdt.mt.gov/pubinvolve/reservedrive/","headline":"Road Work","label":"S-548<br />from MP 0.0 to 1.3","enhanced_report":"<b>S-548  from MP 0.0 to 1.3</b><br>Travel Delay 15 mins<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2026 6:00 AM<br><p><b>Additional Information:</b><br>Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.\n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"674876","route":"S-548","last_update":1776789447},"geometry":{"coordinates":["-114.316351281891","48.2402973712819"],"type":"Point"}},{"properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, speed limit 35 mph, and width limit 12 ft until further notice.<br />Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends.","location_description":"MT-86 from MP 24.1 to 28.1","dir":"B","label":"MT-86<br />from MP 24.1 to 28.1","headline":"Road Work","mrm":26.1,"event_id":"882549","enhanced_report":"<b>MT-86  from MP 24.1 to 28.1</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/5/2025 7:00 AM<br><p><b>Additional Information:</b><br>Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends. </p>","last_update":1751314119,"route":"MT-86"},"type":"Feature","id":"882549","geometry":{"type":"Point","coordinates":["-110.853240715469","45.9529996350098"]}},{"id":"885957","type":"Feature","properties":{"enhanced_report":"<b>MT-82  from MP 4.5 to 6.9</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 25 mph<br>Start Date: 8/4/2025 8:00 AM<br>End Date: &nbsp;&nbsp;10/30/2027 5:00 PM<br><p><b>Additional Information:</b><br>Sportsmans Bridge reduced to one lane Tuesday, April 28 through Wednesday, April 29, causing traffic delays. Concrete placement for the new Sportsmans Bridge foundation planned between hours of 9 a.m. to 4 p.m. Bridge Traffic will be reduced to a single lane controlled by temporary traffic signals and flaggers.   \nFlathead River Bridge (Sportsman Bridge) Project Crews will be on site Monday through Friday, from 7 am to 5:30 pm. Preparation for the Bridge & Road Construction continue to progress. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering and exiting the project area. \n\n** River Traffic:  Once barges are in place and bridge construction begins, the east side of the river will remain open to boat traffic. Boaters are advised to use caution, particularly when work is in progress.  \nPlease visit the project website, for more information.\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","event_id":"885957","route":"MT-82","last_update":1777053816,"dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, signal lights, and speed limit 25 mph until 5:00 PM Saturday, October 30, 2027.<br />Sportsmans Bridge reduced to one lane Tuesday, April 28 through Wednesday, April 29, causing traffic delays. Concrete placement for the new Sportsmans Bridge foundation planned between hours of 9 a.m. to 4 p.m. Bridge Traffic will be reduced to a single lane controlled by temporary traffic signals and flaggers. \nFlathead River Bridge (Sportsman Bridge) Project Crews will be on site Monday through Friday, from 7 am to 5:30 pm. Preparation for the Bridge & Road Construction continue to progress. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering and exiting the project area. \n\n** River Traffic: Once barges are in place and bridge construction begins, the east side of the river will remain open to boat traffic. Boaters are advised to use caution, particularly when work is in progress. \nPlease visit the project website, for more information.","location_description":"MT-82 from MP 4.5 to 6.9","category":"cnstr","mrm":5.7,"label":"MT-82<br />from MP 4.5 to 6.9","url":"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-114.117517413352","48.0920991659472"]}},{"geometry":{"coordinates":["-112.703557323067","45.5258384721225"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road closed until further notice.<br />MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.","location_description":"N HIGHWAY 91","category":"cnstr","label":"N HIGHWAY 91","headline":"Road Work","mrm":22.45,"event_id":"886173","enhanced_report":"<b>N HIGHWAY 91</b><br>ROAD CLOSED<br>Start Date: 10/22/2024 2:40 PM<br><p><b>Additional Information:</b><br>MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.</p>","last_update":1754947373,"route":"N HIGHWAY 91"},"id":"886173","type":"Feature"},{"type":"Feature","id":"886509","properties":{"last_update":1776345080,"route":"S-421","event_id":"886509","enhanced_report":"<b>S-421  from MP 4.8 to 6.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/6/2026 10:54 AM<br>End Date: &nbsp;&nbsp;8/31/2026 7:00 PM<br><p><b>Additional Information:</b><br>Gravel install and preparation for Paving operations</p>","headline":"Road Work","label":"S-421<br />from MP 4.8 to 6.9","mrm":5.85,"category":"cnstr","location_description":"S-421 from MP 4.8 to 6.9","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 7:00 PM Monday, August 31, 2026.<br />Gravel install and preparation for Paving operations","dir":"B"},"geometry":{"coordinates":["-109.176373549517","45.5782111010791"],"type":"Point"}},{"geometry":{"coordinates":["-114.308729957856","48.2591177007456"],"type":"Point"},"id":"887347","type":"Feature","properties":{"last_update":1775737054,"route":"S-292","event_id":"887347","enhanced_report":"<b>S-292  from MP 0.0 to 2.6</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2025 7:00 AM<br><p><b>Additional Information:</b><br> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","label":"S-292<br />from MP 0.0 to 2.6","url":"https://mdt.mt.gov/pubinvolve/reservedrive/","headline":"Road Work","mrm":1.28,"category":"cnstr","location_description":"S-292 from MP 0.0 to 2.6","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until further notice.<br /> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time.","dir":"B"}},{"geometry":{"coordinates":["-108.720135612659","47.5870909299542"],"type":"Point"},"properties":{"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with speed limit 35 mph until 5:00 PM Friday, May 1, 2026.<br />Construction will resume in the area beginning Monday (4/13). Approximately 0.5 miles of roadway between RP 84 and 85 is gravel. Be advised, there may be loose gravel and soft spots. Reduce speed as appropriate for the conditions. Use caution.","location_description":"US-191 from MP 84.0 to 85.0","mrm":84.5,"headline":"Road Work","url":"https://mdt.mt.gov/pubinvolve/mobridge/","label":"US-191<br />from MP 84.0 to 85.0","enhanced_report":"<b>US-191  from MP 84.0 to 85.0</b><br>Speed Limit 35 mph<br>Start Date: 4/16/2026 7:00 AM<br>End Date: &nbsp;&nbsp;5/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction will resume in the area beginning Monday (4/13). Approximately 0.5 miles of roadway between RP 84 and 85 is gravel. Be advised, there may be loose gravel and soft spots. Reduce speed as appropriate for the conditions. Use caution. </p><p><a href=\"https://mdt.mt.gov/pubinvolve/mobridge/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"904400","route":"US-191","last_update":1776355429},"id":"904400","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-104.592468238838","47.7030562308994"]},"type":"Feature","id":"912666","properties":{"report":"The following road construction project is in progress: road construction with travel delay 10 mins, detour, signal lights, and speed limit 35 to 55 mph until further notice.<br />Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations resume in Spring 2026.","location_description":"MT-200 from MP 51.0 to 52.0","dir":"B","category":"cnstr","label":"MT-200<br />from MP 51.0 to 52.0","headline":"Road Work","mrm":51.5,"event_id":"912666","enhanced_report":"<b>MT-200  from MP 51.0 to 52.0</b><br>Travel Delay 10 mins<br>Detour<br>Signal lights<br>Speed Limit 35-55 mph<br>Start Date: 11/21/2025 3:13 PM<br><p><b>Additional Information:</b><br>Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations resume in Spring 2026.</p>","last_update":1766018957,"route":"MT-200"}},{"geometry":{"type":"Point","coordinates":["-106.138792009437","47.3255728190287"]},"id":"954771","type":"Feature","properties":{"category":"cnstr","dir":"B","location_description":"MT-200 from MP 246.8 to 253.5","report":"The following road construction project is in progress: road construction with width limit 14 ft and speed limit 35 mph until further notice.<br />CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH","mrm":250.15,"headline":"Road Work","label":"MT-200<br />from MP 246.8 to 253.5","enhanced_report":"<b>MT-200  from MP 246.8 to 253.5</b><br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 12/17/2025 8:46 PM<br><p><b>Additional Information:</b><br>CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH </p>","event_id":"954771","route":"MT-200","last_update":1766029889}}],"type":"FeatureCollection"}