{"type":"FeatureCollection","features":[{"properties":{"headline":"Road Work","location_description":"MT-200 from MP 49.2 to 49.4","label":"MT-200<br />from MP 49.2 to 49.4","enhanced_report":"<b>MT-200  from MP 49.2 to 49.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 25-35 mph<br>Width Limit  10 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK. </p>","mrm":49.3,"event_id":"1058893","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 25 to 35 mph, and width limit 10 ft until 7:00 PM Monday, November 16, 2026.<br />ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK.","route":"MT-200","last_update":1785369035,"category":"cnstr","dir":"B"},"geometry":{"coordinates":["-115.378419591451","47.6046314825812"],"type":"Point"},"type":"Feature","id":"1058893"},{"id":"1072371","type":"Feature","properties":{"event_id":"1072371","enhanced_report":"<b>US-89  from MP 34.3 to 40.6</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 3/19/2026 2:14 PM<br><p><b>Additional Information:</b><br>M.A. DeAtley is finishing up culvert installations/removals and continuing on CAC. First lift of CAC has been placed on about 90% of the project, and second lift will be placed throughout about 70% by the end of this week. (9/11)\nOur paving subcontractor LHC is currently moving in their hot plant in preparation for paving that is planned to start next week. (9/18)\nSletten and Grizzly Steel are also getting the rebar set on the bridge in hopes to be ready to pour the concrete bridge deck by next Thursday (9/17). \nTraffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 6:30 AM to 5:30 PM Monday - Friday.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","label":"US-89<br />from MP 34.3 to 40.6","mrm":37.45,"location_description":"US-89 from MP 34.3 to 40.6","headline":"Road Work","dir":"B","category":"cnstr","last_update":1788959462,"route":"US-89","url":"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 11 ft until further notice.<br />M.A. DeAtley is finishing up culvert installations/removals and continuing on CAC. First lift of CAC has been placed on about 90% of the project, and second lift will be placed throughout about 70% by the end of this week. (9/11)\nOur paving subcontractor LHC is currently moving in their hot plant in preparation for paving that is planned to start next week. (9/18)\nSletten and Grizzly Steel are also getting the rebar set on the bridge in hopes to be ready to pour the concrete bridge deck by next Thursday (9/17). \nTraffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 6:30 AM to 5:30 PM Monday - Friday."},"geometry":{"coordinates":["-112.141252755761","47.7663722839213"],"type":"Point"}},{"type":"Feature","id":"1073251","properties":{"last_update":1789594092,"dir":"B","category":"cnstr","url":"https://www.mdt.mt.gov/pubinvolve/mt83bridges/","route":"MT-83","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, pilot car, signal lights, speed limit 25 mph, and width limit 16 ft until 5:00 PM Friday, November 6, 2026.<br />The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas.","event_id":"1073251","enhanced_report":"<b>MT-83  from MP 70.5 to 78.5</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 25 mph<br>Width Limit  16 feet<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/6/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas. \n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt83bridges/\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-83<br />from MP 70.5 to 78.5","mrm":74.5,"location_description":"MT-83 from MP 70.5 to 78.5","headline":"Road Work"},"geometry":{"coordinates":["-113.88390997677","47.958308153158"],"type":"Point"}},{"properties":{"headline":"Road Work","location_description":"I-90 at MP 235.0","label":"I-90<br />at MP 235.0","enhanced_report":"<b>I-90  at MP 235.0</b><br>Start Date: 3/30/2026 8:00 AM<br><p><b>Additional Information:</b><br>I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED  FOR MAINTENANCE & ELECTRICAL ISSUES</p>","mrm":235,"event_id":"1079783","report":"The following road construction project is in progress: road construction until further notice.<br />I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED FOR MAINTENANCE & ELECTRICAL ISSUES","route":"I-90","dir":"B","category":"cnstr","last_update":1789666287},"geometry":{"coordinates":["-112.376472583129","45.9151275204233"],"type":"Point"},"type":"Feature","id":"1079783"},{"type":"Feature","id":"1080144","geometry":{"coordinates":["-104.343020312928","47.4714193988865"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Sunday, November 15, 2026.<br />ALTERNATING SINGLE LANE TRAVEL","route":"MT-16","dir":"N","category":"cnstr","last_update":1774643965,"headline":"Road Work","location_description":"MT-16 from MP 28.9 to 37.5","label":"MT-16<br />from MP 28.9 to 37.5","enhanced_report":"<b>MT-16 NB from MP 28.9 to 37.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 3/30/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAVEL</p>","mrm":33.2,"event_id":"1080144"}},{"type":"Feature","id":"1084419","properties":{"headline":"Road Work","location_description":"MT-200 from MP 253.5 to 260.2","enhanced_report":"<b>MT-200  from MP 253.5 to 260.2</b><br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 4/1/2026 3:04 PM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/\" target=\"_blank\"><i>Website</i></a></p>","mrm":256.85,"label":"MT-200<br />from MP 253.5 to 260.2","event_id":"1084419","report":"The following road construction project is in progress: road construction with travel delay 15 mins, pilot car, signal lights, speed limit 35 mph, and width limit 14 ft until 6:00 PM Sunday, November 15, 2026.<br />Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.","route":"MT-200","url":"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/","category":"cnstr","dir":"B","last_update":1785430987},"geometry":{"type":"Point","coordinates":["-105.995986426994","47.3213564526461"]}},{"geometry":{"type":"Point","coordinates":["-107.142506718359","46.4634120172561"]},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, detour, flaggers, lane closures, speed limit 25 mph, and width limit 14 ft until 5:00 PM Friday, December 11, 2026.<br />The road will contain loose gravel. 14' Width Restriction.","url":"https://mdt.mt.gov/pubinvolve/forsythbridges/","route":"US-12","last_update":1785432924,"category":"cnstr","dir":"B","headline":"Road Work","location_description":"US-12 from MP 228.0 to 260.0","mrm":244,"enhanced_report":"<b>US-12  from MP 228.0 to 260.0</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Detour<br>Flaggers<br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/2/2026 7:48 AM<br>End Date: &nbsp;&nbsp;12/11/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road will contain loose gravel.  14' Width Restriction.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/forsythbridges/\" target=\"_blank\"><i>Website</i></a></p>","label":"US-12<br />from MP 228.0 to 260.0","event_id":"1085227"},"type":"Feature","id":"1085227"},{"id":"1088646","type":"Feature","properties":{"location_description":"I-15 from MP 217.5 to 221.7","headline":"Road Work","event_id":"1088646","label":"I-15<br />from MP 217.5 to 221.7","enhanced_report":"<b>I-15  from MP 217.5 to 221.7</b><br>Median crossover detours<br>Speed Limit 45-55 mph<br>Length Limit  95 feet<br>Width Limit  12 feet<br>Start Date: 4/13/2026 5:00 AM<br>End Date: &nbsp;&nbsp;10/31/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am Ã¢ÂÂ 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/i15sieben/\" target=\"_blank\"><i>Website</i></a></p>","mrm":219.6,"report":"The following road construction project is in progress: road construction with length limit 95 ft, median crossover detours, speed limit 45 to 55 mph, and width limit 12 ft until 7:00 PM Saturday, October 31, 2026.<br />NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am Ã¢ÂÂ 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday.","category":"cnstr","dir":"B","last_update":1789662063,"route":"I-15","url":"https://mdt.mt.gov/pubinvolve/i15sieben/"},"geometry":{"coordinates":["-112.123169171667","46.9250655070607"],"type":"Point"}},{"type":"Feature","id":"1089372","geometry":{"type":"Point","coordinates":["-114.659148050516","47.0192496448387"]},"properties":{"url":"https://www.mdt.mt.gov/pubinvolve/i90alberton/","route":"I-90","last_update":1775576768,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.","mrm":66.25,"enhanced_report":"<b>I-90  from MP 66.1 to 66.4</b><br>Start Date: 4/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90alberton/\" target=\"_blank\"><i>Website</i></a></p>","label":"I-90<br />from MP 66.1 to 66.4","event_id":"1089372","headline":"Road Work","location_description":"I-90 from MP 66.1 to 66.4"}},{"id":"1089800","type":"Feature","geometry":{"type":"Point","coordinates":["-104.275406161318","46.3682326709782"]},"properties":{"report":"The following road construction project is in progress: road construction with detour, lane closures, speed limit 35 mph, and width limit 24 ft until 5:00 PM Tuesday, September 29, 2026.<br />Traffic traveling on Paved detour","route":"MT-7","category":"cnstr","dir":"B","last_update":1775662991,"headline":"Road Work","location_description":"MT-7 from MP 35.0 to 36.0","label":"MT-7<br />from MP 35.0 to 36.0","enhanced_report":"<b>MT-7  from MP 35.0 to 36.0</b><br>Detour<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  24 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Traffic traveling on Paved detour \n\n</p>","mrm":35.5,"event_id":"1089800"}},{"id":"1089837","type":"Feature","geometry":{"coordinates":["-115.661019640764","47.4353615400145"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, median crossover detours, speed limit 35 to 55 mph, and width limit 13 ft until 7:00 PM Monday, November 16, 2026.<br />East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting 6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-822-2072","category":"cnstr","dir":"B","last_update":1786634695,"route":"I-90","location_description":"I-90 from MP 0.0 to 5.0","headline":"Road Work","event_id":"1089837","label":"I-90<br />from MP 0.0 to 5.0","enhanced_report":"<b>I-90  from MP 0.0 to 5.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Median crossover detours<br>Speed Limit 35-55 mph<br>Width Limit  13 feet<br>Start Date: 4/8/2026 10:28 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting  6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-822-2072\n\n</p>","mrm":2.5}},{"properties":{"last_update":1782247778,"category":"cnstr","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","route":"CENTENNIAL AVE","report":"The following road construction project is in progress: road construction with lane closures and detour until 4:00 PM Tuesday, December 1, 2026.<br />Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd. Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection. Closure expected to continue through July.","event_id":"1090108","enhanced_report":"<b>CENTENNIAL AVE</b><br>Detour<br>Lane closures<br>Start Date: 4/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 4:00 PM<br><p><b>Additional Information:</b><br>Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd.  Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection.  Closure expected to continue through July.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","label":"CENTENNIAL AVE","mrm":0.11,"location_description":"CENTENNIAL AVE","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-112.560568877555","45.9987575811237"]},"type":"Feature","id":"1090108"},{"geometry":{"coordinates":["-112.47707174804","45.9763958002525"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, detour, flaggers, median crossover detours, speed limit 45 mph, and width limit 16 ft until 4:00 PM Tuesday, December 1, 2026.<br />BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road. The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection.","last_update":1782247792,"category":"cnstr","dir":"B","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","route":"I-90","location_description":"I-90 from MP 227.0 to 228.0","headline":"Road Work","event_id":"1090121","enhanced_report":"<b>I-90  from MP 227.0 to 228.0</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Median crossover detours<br>Speed Limit 45 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 4:00 PM<br><p><b>Additional Information:</b><br>BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road.  The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":227.5,"label":"I-90<br />from MP 227.0 to 228.0"},"type":"Feature","id":"1090121"},{"id":"1090189","type":"Feature","properties":{"event_id":"1090189","enhanced_report":"<b>US-93  from MP 129.7 to 133.0</b><br>Motorcycles consider alternate route<br>Travel Delay 20 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/27/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction Crews will be working 7:00am to 9:00pm Monday through Saturday, weather and other unforeseen circumstances permitting. Workers and equipment will also be present for roadway maintenance periodically overnight and Sunday when operations are necessary. Outside of planned closures, drivers should expect single-lane traffic with signals, pilot cars, flaggers during daytime hours, reduced speeds and up to 20-minute delays.\nAt night US 93 will have two lanes open, except in the area near retaining wall construction will remain under 24/7 traffic control via signals.\n</p>","mrm":131.35,"label":"US-93<br />from MP 129.7 to 133.0","location_description":"US-93 from MP 129.7 to 133.0","headline":"Road Work","last_update":1789406087,"dir":"B","category":"cnstr","route":"US-93","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 20 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, November 27, 2026.<br />Construction Crews will be working 7:00am to 9:00pm Monday through Saturday, weather and other unforeseen circumstances permitting. Workers and equipment will also be present for roadway maintenance periodically overnight and Sunday when operations are necessary. Outside of planned closures, drivers should expect single-lane traffic with signals, pilot cars, flaggers during daytime hours, reduced speeds and up to 20-minute delays.\nAt night US 93 will have two lanes open, except in the area near retaining wall construction will remain under 24/7 traffic control via signals."},"geometry":{"type":"Point","coordinates":["-114.405796224872","48.40363902689"]}},{"id":"1090191","type":"Feature","geometry":{"coordinates":["-115.322693378601","48.3655987456692"],"type":"Point"},"properties":{"mrm":13.85,"enhanced_report":"<b>MT-37  from MP 13.8 to 13.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br>Reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />from MP 13.8 to 13.9","event_id":"1090191","headline":"Road Work","location_description":"MT-37 from MP 13.8 to 13.9","route":"MT-37","last_update":1785507002,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br />Reduced speed limit, traffic control, narrow lanes and travel delays"}},{"geometry":{"type":"Point","coordinates":["-115.255883243005","48.4761950786896"]},"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br />Reduced speed limit, traffic control, narrow lanes and travel delays","last_update":1785507199,"dir":"B","category":"cnstr","route":"MT-37","location_description":"MT-37 at MP 23.3","headline":"Road Work","event_id":"1090193","enhanced_report":"<b>MT-37  at MP 23.3</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br>Reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 23.3","mrm":23.3},"id":"1090193","type":"Feature"},{"id":"1090194","type":"Feature","properties":{"enhanced_report":"<b>MT-37  at MP 29.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br> Reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 29.4","mrm":29.4,"event_id":"1090194","headline":"Road Work","location_description":"MT-37 at MP 29.4","route":"MT-37","dir":"B","category":"cnstr","last_update":1785507309,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br /> Reduced speed limit, traffic control, narrow lanes and travel delays"},"geometry":{"type":"Point","coordinates":["-115.210054176294","48.535877185965"]}},{"properties":{"location_description":"MT-37 at MP 34.1","headline":"Road Work","event_id":"1090196","label":"MT-37<br />at MP 34.1","enhanced_report":"<b>MT-37  at MP 34.1</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br>Reduced speed limit, traffic control, narrow lanes and travel delays</p>","mrm":34.1,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br />Reduced speed limit, traffic control, narrow lanes and travel delays","dir":"B","category":"cnstr","last_update":1785507430,"route":"MT-37"},"geometry":{"coordinates":["-115.206537723938","48.5954033368767"],"type":"Point"},"id":"1090196","type":"Feature"},{"properties":{"location_description":"MT-37 at MP 37.9","headline":"Road Work","event_id":"1090197","mrm":37.9,"enhanced_report":"<b>MT-37  at MP 37.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br>Reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 37.9","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br />Reduced speed limit, traffic control, narrow lanes and travel delays","category":"cnstr","dir":"B","last_update":1785507685,"route":"MT-37"},"geometry":{"type":"Point","coordinates":["-115.26574521557","48.6277169631435"]},"id":"1090197","type":"Feature"},{"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br />Reduced speed limit, traffic control, narrow lanes and travel delays","route":"MT-37","dir":"B","category":"cnstr","last_update":1785507812,"headline":"Road Work","location_description":"MT-37 at MP 48.5","enhanced_report":"<b>MT-37  at MP 48.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br>Reduced speed limit, traffic control, narrow lanes and travel delays</p>","mrm":48.5,"label":"MT-37<br />at MP 48.5","event_id":"1090198"},"geometry":{"type":"Point","coordinates":["-115.285431578056","48.7598371624946"]},"id":"1090198","type":"Feature"},{"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 3, 2026.<br /> Reduced speed limit, traffic control, narrow lanes and travel delays","last_update":1785509228,"category":"cnstr","dir":"B","route":"MT-37","location_description":"MT-37 at MP 63.9","headline":"Road Work","event_id":"1090199","mrm":63.9,"enhanced_report":"<b>MT-37  at MP 63.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/3/2026 5:00 PM<br><p><b>Additional Information:</b><br> Reduced speed limit, traffic control, narrow lanes and travel delays</p>","label":"MT-37<br />at MP 63.9"},"geometry":{"type":"Point","coordinates":["-115.117262468785","48.8947606118414"]},"id":"1090199","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-108.784068432114","45.668307236238"]},"properties":{"headline":"Road Work","location_description":"W MAIN ST","enhanced_report":"<b>W MAIN ST</b><br>Speed Limit 25-35 mph<br>Start Date: 6/22/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>Final electrical work starting September 11th. Watch for workers and equipment near 1st Avenue and Main Street.</p>","label":"W MAIN ST","mrm":0.6,"event_id":"1093845","report":"The following road construction project is in progress: road construction with speed limit 25 to 35 mph until 5:00 PM Wednesday, September 30, 2026.<br />Final electrical work starting September 11th. Watch for workers and equipment near 1st Avenue and Main Street.","route":"W MAIN ST","last_update":1785508144,"category":"cnstr"},"type":"Feature","id":"1093845"},{"properties":{"location_description":"US-191 from MP 86.0 to 88.5","headline":"Road Work","event_id":"1096611","mrm":87.25,"enhanced_report":"<b>US-191  from MP 86.0 to 88.5</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  9 feet<br>Start Date: 5/11/2026 7:00 AM<br>End Date: &nbsp;&nbsp;10/16/2026 5:00 PM<br><p><b>Additional Information:</b><br>9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges. </p>","label":"US-191<br />from MP 86.0 to 88.5","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 9 ft until 5:00 PM Friday, October 16, 2026.<br />9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges.","category":"cnstr","dir":"B","last_update":1788195609,"route":"US-191"},"geometry":{"coordinates":["-108.687762641939","47.619871710269"],"type":"Point"},"id":"1096611","type":"Feature"},{"properties":{"dir":"B","category":"cnstr","last_update":1788560936,"route":"US-2","url":"https://www.mdt.mt.gov/pubinvolve/havreurban/","report":"The following road construction project is in progress: road construction with speed limit 25 to 35 mph and lane closures until 8:00 PM Thursday, October 1, 2026.<br />Wide loads are not restricted but may be delayed. Please call ahead for wide loads 801-652-1569. \n Inlay grinding and pavement marking tape installation expected to begin 8/31/26 followed by crosswalk and curb markings. Traffic will be routed to one-lane in each direction with dedicated lane closures guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Access to businesses will be maintained and guided with traffic control devices. For more information, contact 406-208-0551","event_id":"1096877","label":"US-2<br />from MP 381.3 to 383.8","enhanced_report":"<b>US-2  from MP 381.3 to 383.8</b><br>Lane closures<br>Speed Limit 25-35 mph<br>Start Date: 6/22/2026 4:00 PM<br>End Date: &nbsp;&nbsp;10/1/2026 8:00 PM<br><p><b>Additional Information:</b><br>Wide loads are not restricted but may be delayed. Please call ahead for wide loads 801-652-1569. \n  Inlay grinding and pavement marking tape installation expected to begin 8/31/26 followed by crosswalk and curb markings. Traffic will be routed to one-lane in each direction with dedicated lane closures guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Access to businesses will be maintained and guided with traffic control devices. For more information, contact 406-208-0551\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/havreurban/\" target=\"_blank\"><i>Website</i></a></p>","mrm":382.55,"location_description":"US-2 from MP 381.3 to 383.8","headline":"Road Work"},"geometry":{"coordinates":["-109.67215663507","48.5530539006946"],"type":"Point"},"type":"Feature","id":"1096877"},{"type":"Feature","id":"1096893","properties":{"report":"The following road construction project is in progress: road construction with median crossover detours, speed limit 35 to 65 mph, and width limit 16 ft until 8:00 PM Sunday, November 15, 2026.<br />West bound traffic merges to east bound passing lane with median detours. West Bound Interchange 192 (Bad Route) On and Off ramps will be closed 6:00 AM - 8:00 PM, 08/03/26 - 08/14/26. Alternate routes may be required; please plan accordingly.","route":"I-94","last_update":1785428736,"dir":"B","category":"cnstr","headline":"Road Work","location_description":"I-94 from MP 187.1 to 192.6","label":"I-94<br />from MP 187.1 to 192.6","enhanced_report":"<b>I-94  from MP 187.1 to 192.6</b><br>Median crossover detours<br>Speed Limit 35-65 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 8:00 PM<br><p><b>Additional Information:</b><br>West bound traffic merges to east bound passing lane with median detours. West Bound Interchange 192 (Bad Route) On and Off ramps will be closed 6:00 AM - 8:00 PM, 08/03/26 - 08/14/26. Alternate routes may be required; please plan accordingly.\n\n</p>","mrm":189.85,"event_id":"1096893"},"geometry":{"coordinates":["-105.067999357911","46.8808194421691"],"type":"Point"}},{"geometry":{"coordinates":["-112.039365455286","46.7043615487372"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, flaggers, lane closures, signal lights, and speed limit 15 mph until 6:00 PM Wednesday, October 7, 2026.<br />Road Construction at the Lincoln Rd and Applegate Dr Intersection. \nTraffic is currently utilizing the roundabout with a 15-mph speed limit. \nExpect single lane closures controlled by signal lights and flaggers during various operations. Use alternative routes when possible.","last_update":1788966898,"category":"cnstr","dir":"B","url":"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/","route":"S-279","location_description":"S-279 from MP 0.6 to 1.3","headline":"Road Work","event_id":"1098028","mrm":0.95,"enhanced_report":"<b>S-279  from MP 0.6 to 1.3</b><br>Motorcycles consider alternate route<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 15 mph<br>Start Date: 5/18/2026 12:00 PM<br>End Date: &nbsp;&nbsp;10/7/2026 6:00 PM<br><p><b>Additional Information:</b><br>Road Construction at the Lincoln Rd and Applegate Dr Intersection.  \nTraffic is currently utilizing the roundabout with a 15-mph speed limit.  \nExpect single lane closures controlled by signal lights and flaggers during various operations.  Use alternative routes when possible.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/\" target=\"_blank\"><i>Website</i></a></p>","label":"S-279<br />from MP 0.6 to 1.3"},"id":"1098028","type":"Feature"},{"id":"1098361","type":"Feature","geometry":{"type":"Point","coordinates":["-104.564306729396","48.7758797049185"]},"properties":{"headline":"Road Work","location_description":"MT-5 from MP 41.0 to 42.0","enhanced_report":"<b>MT-5  from MP 41.0 to 42.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Speed Limit 15 mph<br>Start Date: 6/1/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>City of Plentywood water project</p>","label":"MT-5<br />from MP 41.0 to 42.0","mrm":41.5,"event_id":"1098361","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, and speed limit 15 mph until 5:00 PM Wednesday, September 30, 2026.<br />City of Plentywood water project","route":"MT-5","last_update":1789593218,"category":"cnstr","dir":"B"}},{"type":"Feature","id":"1099439","geometry":{"coordinates":["-112.324550336262","44.5612057782544"],"type":"Point"},"properties":{"headline":"Road Work","location_description":"I-15 from MP 0.0 to 1.5","enhanced_report":"<b>I-15 SB from MP 0.0 to 1.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:04 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>","mrm":0.75,"label":"I-15<br />from MP 0.0 to 1.5","event_id":"1099439","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft southbound until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","route":"I-15","dir":"S","category":"cnstr","last_update":1782313136}},{"id":"1099441","type":"Feature","geometry":{"coordinates":["-112.700914878439","44.7215555036881"],"type":"Point"},"properties":{"category":"cnstr","dir":"B","last_update":1782313072,"route":"I-15","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","event_id":"1099441","enhanced_report":"<b>I-15  from MP 22.5 to 24.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:15 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>","mrm":23.5,"label":"I-15<br />from MP 22.5 to 24.5","location_description":"I-15 from MP 22.5 to 24.5","headline":"Road Work"}},{"geometry":{"coordinates":["-112.643455402171","44.6798657485134"],"type":"Point"},"properties":{"location_description":"I-15 from MP 18.5 to 20.5","headline":"Road Work","event_id":"1099442","enhanced_report":"<b>I-15 NB from MP 18.5 to 20.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:18 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>","label":"I-15<br />from MP 18.5 to 20.5","mrm":19.5,"report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft northbound until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","last_update":1782313194,"category":"cnstr","dir":"N","route":"I-15"},"type":"Feature","id":"1099442"},{"id":"1099444","type":"Feature","geometry":{"coordinates":["-112.737619095324","45.1363050076339"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 14 ft northbound daily between 7:00 AM and 5:00 PM until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE \nLoads wider than 14FT use the off and on ramps to bypass the bridge.","route":"I-15","last_update":1785456842,"dir":"N","category":"cnstr","headline":"Road Work","location_description":"I-15 from MP 55.0 to 57.0","mrm":56,"enhanced_report":"<b>I-15 NB from MP 55.0 to 57.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 6/9/2026 10:48 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE \nLoads wider than 14FT use the off and on ramps to bypass the bridge.</p>","label":"I-15<br />from MP 55.0 to 57.0","event_id":"1099444"}},{"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 30 mins, detour, flaggers, lane closures, signal lights, and speed limit 35 mph until 7:00 PM Wednesday, September 23, 2026.<br />Single lane traffic, be prepared for slow and stop traffic, expect extended delays.","dir":"B","category":"cnstr","last_update":1783819073,"route":"US-20","location_description":"US-20 from MP 0.0 to 8.6","headline":"Road Work","event_id":"1100130","enhanced_report":"<b>US-20  from MP 0.0 to 8.6</b><br>Motorcycles consider alternate route<br>Travel Delay 30 mins<br>Detour<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/29/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/23/2026 7:00 PM<br><p><b>Additional Information:</b><br>Single lane traffic, be prepared for slow and stop traffic, expect extended delays.</p>","label":"US-20<br />from MP 0.0 to 8.6","mrm":4.3},"geometry":{"type":"Point","coordinates":["-111.200919660629","44.6811970088826"]},"type":"Feature","id":"1100130"},{"type":"Feature","id":"1100672","properties":{"event_id":"1100672","enhanced_report":"<b>US-2  from MP 221.1 to 221.6</b><br>Lane closures<br>Speed Limit 25 mph<br>Start Date: 7/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/24/2026 5:00 PM<br><p><b>Additional Information:</b><br>Project consists of ADA sidewalk upgrades with curb & gutter replacement, signing upgrades, followed by a mill & fill. Travelers can be advised of intermittent lane closures and rough driving surfaces.</p>","mrm":221.34,"label":"US-2<br />from MP 221.1 to 221.6","location_description":"US-2 from MP 221.1 to 221.6","headline":"Road Work","last_update":1786632082,"dir":"B","category":"cnstr","route":"US-2","report":"The following road construction project is in progress: road construction with speed limit 25 mph and lane closures until 5:00 PM Thursday, September 24, 2026.<br />Project consists of ADA sidewalk upgrades with curb & gutter replacement, signing upgrades, followed by a mill & fill. Travelers can be advised of intermittent lane closures and rough driving surfaces."},"geometry":{"type":"Point","coordinates":["-113.014188244782","48.5559484681412"]}},{"type":"Feature","id":"1100978","geometry":{"coordinates":["-112.185811371121","45.8787033766838"],"type":"Point"},"properties":{"location_description":"MT-2 at MP 3.9","headline":"Road Work","event_id":"1100978","label":"MT-2<br />at MP 3.9","enhanced_report":"<b>MT-2  at MP 3.9</b><br>Signal lights<br>Speed Limit 35 mph<br>Gross Weight Limit  20000 lbs<br>Start Date: 7/20/2026 1:46 PM<br><p><b>Additional Information:</b><br>WB LANE CLOSED, 10 TON WEIGHT LIMIT</p>","mrm":3.9,"report":"The following road construction project is in progress: road construction with gross weight limit 20000 lbs, signal lights, and speed limit 35 mph until further notice.<br />WB LANE CLOSED, 10 TON WEIGHT LIMIT","category":"cnstr","dir":"B","last_update":1784586401,"route":"MT-2"}},{"properties":{"dir":"B","category":"cnstr","last_update":1788271871,"route":"S-482","report":"The following road construction project is in progress: road closed until 5:00 PM Friday, May 28, 2027.<br />S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure.","event_id":"1101007","label":"S-482<br />from MP 2.5 to 2.7","enhanced_report":"<b>S-482  from MP 2.5 to 2.7</b><br>ROAD CLOSED<br>Start Date: 7/21/2026 10:03 AM<br>End Date: &nbsp;&nbsp;5/28/2027 5:00 PM<br><p><b>Additional Information:</b><br>S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure. </p>","mrm":2.6,"location_description":"S-482 from MP 2.5 to 2.7","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-115.505364972791","48.3146911708432"]},"id":"1101007","type":"Feature"},{"properties":{"event_id":"1101150","label":"I-15<br />from MP 229.1 to 236.8","enhanced_report":"<b>I-15  from MP 229.1 to 236.8</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 8/18/2026 9:00 AM<br>End Date: &nbsp;&nbsp;9/30/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB and SB lanes closures for sign installation, final brooming, and final pavement markings. Watch for construction vehicles. Reduced speed through work areas.</p>","mrm":232.95,"location_description":"I-15 from MP 229.1 to 236.8","headline":"Road Work","dir":"B","category":"cnstr","last_update":1789392765,"route":"I-15","report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until 7:00 PM Wednesday, September 30, 2026.<br />NB and SB lanes closures for sign installation, final brooming, and final pavement markings. Watch for construction vehicles. Reduced speed through work areas."},"geometry":{"coordinates":["-111.981188711346","47.0592291662266"],"type":"Point"},"id":"1101150","type":"Feature"},{"id":"1101402","type":"Feature","geometry":{"type":"Point","coordinates":["-109.274330325162","45.6576285028196"]},"properties":{"label":"S-306<br />from MP 2.0 to 2.5","enhanced_report":"<b>S-306  from MP 2.0 to 2.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 8/5/2026 6:00 AM<br>End Date: &nbsp;&nbsp;10/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Single lane traffic over bridge controlled by signal lights.  Expect 10-15 min delays.</p>","mrm":2.25,"event_id":"1101402","headline":"Road Work","location_description":"S-306 from MP 2.0 to 2.5","route":"S-306","category":"cnstr","dir":"B","last_update":1785516474,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 11 ft until 5:00 PM Saturday, October 31, 2026.<br />Single lane traffic over bridge controlled by signal lights. Expect 10-15 min delays."}},{"type":"Feature","id":"1101543","geometry":{"coordinates":["-108.023800211295","47.0124878213755"],"type":"Point"},"properties":{"event_id":"1101543","enhanced_report":"<b>MT-200  from MP 145.2 to 158.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 9/16/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Beginning 9/16/2026 12 foot width restrictions will be in place for bridge work, milling and paving operations.  Be prepared for travel delays with flaggers and temp traffic signals in place.  Motorcycles should consider an alternate route.</p>","label":"MT-200<br />from MP 145.2 to 158.5","mrm":151.85,"location_description":"MT-200 from MP 145.2 to 158.5","headline":"Road Work","category":"cnstr","dir":"B","last_update":1789155007,"route":"MT-200","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, signal lights, speed limit 35 mph, and width limit 12 ft until 5:00 PM Sunday, November 1, 2026.<br />Beginning 9/16/2026 12 foot width restrictions will be in place for bridge work, milling and paving operations. Be prepared for travel delays with flaggers and temp traffic signals in place. Motorcycles should consider an alternate route."}},{"type":"Feature","id":"1101584","geometry":{"coordinates":["-114.303724207085","48.1983763142226"],"type":"Point"},"properties":{"event_id":"1101584","label":"2nd Street East","enhanced_report":"<b>2nd Street East</b><br>Detour<br>ROAD CLOSED<br>Start Date: 8/10/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/6/2027 6:00 PM<br><p><b>Additional Information:</b><br>A Road Closure and Detour for the intersection of 2nd St E/Conrad Drive and Woodland Avenue is in place: Woodland Ave closed at the intersection of Woodland Ave and 4th St E to the north to E Center St and 5th Ave E; \nConrad Drive closed at the intersection of Conrad Drive and Woodland Park Dr. to the east to the intersection of 2nd St E and 5th Ave E. \n*Detour signs and barricades are in place to direct you around the work zone. \n** Watch for workers and equipment exiting the project. \n** Please plan your travel for additional time around the detour and construction site.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/woodland/\" target=\"_blank\"><i>Website</i></a></p>","mrm":0,"location_description":"2nd Street East","headline":"Road Work","category":"cnstr","last_update":1789053168,"route":"2nd Street East","url":"https://www.mdt.mt.gov/pubinvolve/woodland/","report":"The following road construction project is in progress: road closed with detour until 6:00 PM Friday, August 6, 2027.<br />A Road Closure and Detour for the intersection of 2nd St E/Conrad Drive and Woodland Avenue is in place: Woodland Ave closed at the intersection of Woodland Ave and 4th St E to the north to E Center St and 5th Ave E; \nConrad Drive closed at the intersection of Conrad Drive and Woodland Park Dr. to the east to the intersection of 2nd St E and 5th Ave E. \n*Detour signs and barricades are in place to direct you around the work zone. \n** Watch for workers and equipment exiting the project. \n** Please plan your travel for additional time around the detour and construction site."}},{"id":"1101617","type":"Feature","properties":{"enhanced_report":"<b>S-297  from MP 0.9 to 1.0</b><br>Detour<br>Flaggers<br>Speed Limit 35 mph<br>Gross Weight Limit  72000 lbs<br>Start Date: 8/7/2026 6:00 AM<br>End Date: &nbsp;&nbsp;10/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Detour is in place following barrier rail installation. Bridge work should not cause delays but expect flaggers to be on site as needed. </p>","mrm":0.95,"label":"S-297<br />from MP 0.9 to 1.0","event_id":"1101617","headline":"Road Work","location_description":"S-297 from MP 0.9 to 1.0","route":"S-297","category":"cnstr","dir":"B","last_update":1789569543,"report":"The following road construction project is in progress: road construction with detour, flaggers, gross weight limit 72000 lbs, and speed limit 35 mph until 5:00 PM Saturday, October 31, 2026.<br />Detour is in place following barrier rail installation. Bridge work should not cause delays but expect flaggers to be on site as needed."},"geometry":{"coordinates":["-109.528121868183","46.3593654413964"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-114.224673998474","48.0184823676727"]},"properties":{"report":"The following road construction project is in progress: road construction with travel delay 10 mins, lane closures, and speed limit 30 to 35 mph until 5:00 PM Monday, November 30, 2026.<br />**18 FOOT WIDTH RESTRICTION ** Sewer replacement construction will begin along US 93 S in Lakeside from the Intersection of Bierney Creek Rd to the intersection of Stoner Loop. This will involve closures of the shoulder and south bound lane, shifting traffic into the turning lane but maintaining south and northbound traffic along US 93. Traffic control will only consist of 200-300 FT of lane shift at one time. Local traffic affected by intersecting roads will be detoured to the next available intersection.","category":"cnstr","dir":"B","last_update":1789662485,"route":"US-93","url":"https://rpa-eng.com/ongoing-projects/lcwsd-collections/ [rpa-eng.com]","location_description":"US-93 from MP 97.5 to 98.5","headline":"Road Work","event_id":"1101693","mrm":98,"enhanced_report":"<b>US-93  from MP 97.5 to 98.5</b><br>Travel Delay 10 mins<br>Lane closures<br>Speed Limit 30-35 mph<br>Start Date: 8/11/2026 12:00 PM<br>End Date: &nbsp;&nbsp;11/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>**18 FOOT WIDTH RESTRICTION ** Sewer replacement construction will begin along US 93 S in Lakeside from the Intersection of Bierney Creek Rd to the intersection of Stoner Loop. This will involve closures of the shoulder and south bound lane, shifting traffic into the turning lane but maintaining south and northbound traffic along US 93. Traffic control will only consist of 200-300 FT of lane shift at one time. Local traffic affected by intersecting roads will be detoured to the next available intersection. </p><p><a href=\"https://rpa-eng.com/ongoing-projects/lcwsd-collections/ [rpa-eng.com]\" target=\"_blank\"><i>Website</i></a></p>","label":"US-93<br />from MP 97.5 to 98.5"},"type":"Feature","id":"1101693"},{"id":"1101749","type":"Feature","properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph northbound until 12:00 PM Tuesday, November 10, 2026.<br /> 35 mph work zones with shoulder work, culvert work and milling with pilot car and flaggers. Will be tentatively working 7 am to 7 pm Mon-Fri.","route":"MT-24","category":"cnstr","dir":"N","last_update":1788352976,"headline":"Road Work","location_description":"MT-24 from MP 59.6 to 73.3","enhanced_report":"<b>MT-24 NB from MP 59.6 to 73.3</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 8/12/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/10/2026 12:00 PM<br><p><b>Additional Information:</b><br> 35 mph work zones with shoulder work, culvert work and milling with pilot car and flaggers.  Will be tentatively working 7 am to 7 pm Mon-Fri. </p>","mrm":66.45,"label":"MT-24<br />from MP 59.6 to 73.3","event_id":"1101749"},"geometry":{"type":"Point","coordinates":["-106.595024672639","48.0715672010113"]}},{"properties":{"report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 15 ft until 8:00 PM Thursday, October 1, 2026.<br />Work is anticipated during the day","route":"US-89","category":"cnstr","dir":"B","last_update":1786654993,"headline":"Road Work","location_description":"US-89 from MP 62.0 to 65.0","mrm":63.5,"enhanced_report":"<b>US-89  from MP 62.0 to 65.0</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  15 feet<br>Start Date: 8/17/2026 12:00 AM<br>End Date: &nbsp;&nbsp;10/1/2026 8:00 PM<br><p><b>Additional Information:</b><br>Work is anticipated during the day  </p>","label":"US-89<br />from MP 62.0 to 65.0","event_id":"1101839"},"geometry":{"type":"Point","coordinates":["-110.929374437182","47.2438060239925"]},"type":"Feature","id":"1101839"},{"properties":{"route":"US-2","category":"cnstr","dir":"B","last_update":1786988542,"report":"The following road construction project is in progress: road construction with speed limit 35 mph until 6:00 PM Friday, October 9, 2026.<br />Expect speed reduction in area of work on the north side slopes and ditch of the highway. Please watch for trucks and equipment entering and exiting the project. Minimal delays expected. Work during daylight hours Monday through Thursday with some Fridays expected.","enhanced_report":"<b>US-2  from MP 375.8 to 376.4</b><br>Speed Limit 35 mph<br>Start Date: 8/17/2026 11:40 AM<br>End Date: &nbsp;&nbsp;10/9/2026 6:00 PM<br><p><b>Additional Information:</b><br>Expect speed reduction in area of work on the north side slopes and ditch of the highway. Please watch for trucks and equipment entering and exiting the project. Minimal delays expected. Work during daylight hours Monday through Thursday with some Fridays expected.</p>","label":"US-2<br />from MP 375.8 to 376.4","mrm":376.1,"event_id":"1101904","headline":"Road Work","location_description":"US-2 from MP 375.8 to 376.4"},"geometry":{"coordinates":["-109.816033675283","48.5576618005729"],"type":"Point"},"type":"Feature","id":"1101904"},{"geometry":{"coordinates":["-109.175639030411","45.1580789732733"],"type":"Point"},"properties":{"location_description":"S-308 from MP 5.5 to 5.7","headline":"Road Work","event_id":"1102043","label":"S-308<br />from MP 5.5 to 5.7","enhanced_report":"<b>S-308  from MP 5.5 to 5.7</b><br>Speed Limit 35 mph<br>Start Date: 8/24/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/23/2026 5:00 PM<br><p><b>Additional Information:</b><br>Fencing and traffic control sign work in progress. Dirt work in progress . Watch for workers and equipment.</p>","mrm":5.6,"report":"The following road construction project is in progress: road construction with speed limit 35 mph until 5:00 PM Monday, November 23, 2026.<br />Fencing and traffic control sign work in progress. Dirt work in progress . Watch for workers and equipment.","dir":"B","category":"cnstr","last_update":1788364099,"route":"S-308"},"id":"1102043","type":"Feature"},{"id":"1102565","type":"Feature","geometry":{"type":"Point","coordinates":["-106.419849332907","48.7314991596404"]},"properties":{"headline":"Road Work","location_description":"MT-24 from MP 33.0 to 50.4","enhanced_report":"<b>MT-24  from MP 33.0 to 50.4</b><br>Travel Delay 20 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Start Date: 9/9/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/23/2026 8:00 PM<br>","label":"MT-24<br />from MP 33.0 to 50.4","mrm":41.7,"event_id":"1102565","report":"The following road construction project is in progress: road construction with travel delay 20 mins, flaggers, lane closures, pilot car, and speed limit 35 mph until 8:00 PM Wednesday, September 23, 2026.","route":"MT-24","last_update":1789564048,"category":"cnstr","dir":"B"}},{"properties":{"last_update":1789472573,"dir":"B","category":"cnstr","route":"US-2","report":"The following road construction project is in progress: road construction with lane closures, speed limit 25 mph, and width limit 10 ft until 8:00 PM Wednesday, November 11, 2026.<br />Bridge rehabilitation work on the Two Medicine River Bridge. Travelers can expect a reduced speed work zone and narrow travel lanes across the structure.","event_id":"1102581","label":"US-2<br />from MP 210.2 to 210.2","enhanced_report":"<b>US-2  from MP 210.2 to 210.2</b><br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  10 feet<br>Start Date: 9/9/2026 9:21 AM<br>End Date: &nbsp;&nbsp;11/11/2026 8:00 PM<br><p><b>Additional Information:</b><br>Bridge rehabilitation work on the Two Medicine River Bridge. Travelers can expect a reduced speed work zone and narrow travel lanes across the structure.\n</p>","mrm":210.19,"location_description":"US-2 from MP 210.2 to 210.2","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-113.206694640265","48.449928010827"]},"id":"1102581","type":"Feature"},{"properties":{"headline":"Road Work","location_description":"S-373 from MP 0.0 to 2.0","enhanced_report":"<b>S-373  from MP 0.0 to 2.0</b><br>Detour<br>Start Date: 9/22/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/25/2026 5:00 PM<br><p><b>Additional Information:</b><br>We are going to close the S-373 on 9-22 at 7:00 a.m. and open it back on 9-25-26. We are going to reroute traffic south to Hamilton 4.5 miles to where Routes 93 and 269 intersect and traffic can either go north or south depending on direction of travel. We will be doing borings through the bridge deck in the center of the bridge. </p>","label":"S-373<br />from MP 0.0 to 2.0","mrm":1.01,"event_id":"1102587","report":"The following road construction project is in progress: from 7:00 AM Tuesday, September 22, 2026 road construction with detour until 5:00 PM Friday, September 25, 2026.<br />We are going to close the S-373 on 9-22 at 7:00 a.m. and open it back on 9-25-26. We are going to reroute traffic south to Hamilton 4.5 miles to where Routes 93 and 269 intersect and traffic can either go north or south depending on direction of travel. We will be doing borings through the bridge deck in the center of the bridge.","route":"S-373","dir":"B","category":"cnstr","last_update":1789046070},"geometry":{"coordinates":["-114.133124456108","46.3126721076077"],"type":"Point"},"id":"1102587","type":"Feature"},{"type":"Feature","id":"1102711","properties":{"route":"US-93","last_update":1789355434,"dir":"B","category":"cnstr","report":"The following road construction project is in progress: road construction Sunday through Friday between 8:00 PM and 6:00 AM until 6:00 AM Tuesday, September 29, 2026.<br />Watch for workers on road. Epoxy in progress. Alternating single lane traffic.","enhanced_report":"<b>US-93  from MP 0.0 to 6.3</b><br>Sunday,Monday,Tuesday,Wednesday,Thursday,Friday 8:00 pm - 6:00 am<br>Start Date: 9/13/2026 8:00 PM<br>End Date: &nbsp;&nbsp;9/29/2026 6:00 AM<br><p><b>Additional Information:</b><br>Watch for workers on road. Epoxy in progress. Alternating single lane traffic.</p>","mrm":3.15,"label":"US-93<br />from MP 0.0 to 6.3","event_id":"1102711","headline":"Road Work","location_description":"US-93 from MP 0.0 to 6.3"},"geometry":{"type":"Point","coordinates":["-114.124443171294","46.9935806505419"]}},{"geometry":{"coordinates":["-114.199086690856","47.976693010799"],"type":"Point"},"properties":{"route":"US-93","last_update":1789417611,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Thursday, October 15, 2026.<br />The Montana Department of Transportation (MDT) and Schellinger Construction will construct right turn lanes at the U.S. Highway 93 (US 93) and Goldenview Lane intersection and the US 93 and Legacy Park Way intersection from September 14 through the beginning of October, weather and other unforeseen factors permitting.\n\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\n\nThis project will improve access and enhance safety in the area.\n\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project.","mrm":94.68,"enhanced_report":"<b>US-93  at MP 94.7</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 9/14/2026 2:20 PM<br>End Date: &nbsp;&nbsp;10/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) and Schellinger Construction will construct right turn lanes at the U.S. Highway 93 (US 93) and Goldenview Lane intersection and the US 93 and Legacy Park Way intersection from September 14 through the beginning of October, weather and other unforeseen factors permitting.\n\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\n\nThis project will improve access and enhance safety in the area.\n\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project.\n</p>","label":"US-93<br />at MP 94.7","event_id":"1102736","headline":"Road Work","location_description":"US-93 at MP 94.7"},"id":"1102736","type":"Feature"},{"properties":{"label":"US-93<br />at MP 95.8","enhanced_report":"<b>US-93  at MP 95.8</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 9/14/2026 2:32 PM<br>End Date: &nbsp;&nbsp;10/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) and Schellinger Construction will construct right turn lanes at the U.S. Highway 93 (US 93) and Goldenview Lane intersection and the US 93 and Legacy Park Way intersection from September 14 through the beginning of October, weather and other unforeseen factors permitting.\n\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\n\nThis project will improve access and enhance safety in the area.\n\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project.\n</p>","mrm":95.77,"event_id":"1102737","headline":"Road Work","location_description":"US-93 at MP 95.8","route":"US-93","last_update":1789418046,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Thursday, October 15, 2026.<br />The Montana Department of Transportation (MDT) and Schellinger Construction will construct right turn lanes at the U.S. Highway 93 (US 93) and Goldenview Lane intersection and the US 93 and Legacy Park Way intersection from September 14 through the beginning of October, weather and other unforeseen factors permitting.\n\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\n\nThis project will improve access and enhance safety in the area.\n\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project."},"geometry":{"type":"Point","coordinates":["-114.206696044445","47.9913471749342"]},"type":"Feature","id":"1102737"},{"type":"Feature","id":"1102738","properties":{"location_description":"MT-81 from MP 34.4 to 35.4","headline":"Road Work","event_id":"1102738","mrm":34.9,"enhanced_report":"<b>MT-81  from MP 34.4 to 35.4</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 6/5/2026 8:00 AM<br>End Date: &nbsp;&nbsp;8/1/2027 5:00 PM<br><p><b>Additional Information:</b><br>Traffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-81<br />from MP 34.4 to 35.4","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, and speed limit 35 mph until 5:00 PM Sunday, August 1, 2027.<br />Traffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.","dir":"B","category":"cnstr","last_update":1789418348,"route":"MT-81","url":"http://mdt.mt.gov/pubinvolve/lewistownbridges"},"geometry":{"type":"Point","coordinates":["-109.533267332379","47.2261729694507"]}},{"id":"1102741","type":"Feature","properties":{"location_description":"US-87 from MP 90.7 to 91.1","headline":"Road Work","event_id":"1102741","enhanced_report":"<b>US-87  from MP 90.7 to 91.1</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 9/15/2026 7:30 AM<br>End Date: &nbsp;&nbsp;9/18/2026 3:30 PM<br><p><b>Additional Information:</b><br>Shoulder work in progress. Watch for workers.</p>","mrm":90.9,"label":"US-87<br />from MP 90.7 to 91.1","report":"The following road construction project is in progress: road construction with travel delay 10 mins, flaggers, lane closures, and speed limit 35 mph until 3:30 PM Friday, September 18, 2026.<br />Shoulder work in progress. Watch for workers.","last_update":1789419289,"category":"cnstr","dir":"B","route":"US-87"},"geometry":{"coordinates":["-109.257117636807","47.0738068853311"],"type":"Point"}},{"properties":{"url":"http://mdt.mt.gov/pubinvolve/lewistownbridges","route":"MT-81","last_update":1789420783,"dir":"B","category":"cnstr","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, and speed limit 35 mph until 5:00 PM Sunday, August 1, 2027.<br />\nTraffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.","mrm":36.6,"enhanced_report":"<b>MT-81  from MP 36.1 to 37.1</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 6/5/2026 2:18 PM<br>End Date: &nbsp;&nbsp;8/1/2027 5:00 PM<br><p><b>Additional Information:</b><br>\nTraffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.\n</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-81<br />from MP 36.1 to 37.1","event_id":"1102748","headline":"Road Work","location_description":"MT-81 from MP 36.1 to 37.1"},"geometry":{"type":"Point","coordinates":["-109.50657094979","47.2119688165491"]},"type":"Feature","id":"1102748"},{"geometry":{"type":"Point","coordinates":["-109.822393326701","47.2860033702529"]},"properties":{"enhanced_report":"<b>MT-81  from MP 19.4 to 20.4</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Gross Weight Limit  72000 lbs<br>Width Limit  24 feet<br>Start Date: 9/15/2026 7:54 AM<br><p><b>Additional Information:</b><br>Traffic is on a Detour at the bridge replacement site.  Expect flaggers to be on site as needed for road work at connections.</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-81<br />from MP 19.4 to 20.4","mrm":19.9,"event_id":"1102769","headline":"Road Work","location_description":"MT-81 from MP 19.4 to 20.4","url":"http://mdt.mt.gov/pubinvolve/lewistownbridges","route":"MT-81","last_update":1789569693,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, gross weight limit 72000 lbs, lane closures, pilot car, speed limit 35 mph, and width limit 24 ft until further notice.<br />Traffic is on a Detour at the bridge replacement site. Expect flaggers to be on site as needed for road work at connections."},"id":"1102769","type":"Feature"},{"type":"Feature","id":"1102808","properties":{"category":"cnstr","dir":"B","last_update":1789567801,"route":"US-93","report":"The following road construction project is in progress: road construction with lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Tuesday, September 22, 2026.<br />WATCH FOR WORKERS","event_id":"1102808","enhanced_report":"<b>US-93  at MP 23.1</b><br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 9/16/2026 8:03 AM<br>End Date: &nbsp;&nbsp;9/22/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","label":"US-93<br />at MP 23.1","mrm":23.1,"location_description":"US-93 at MP 23.1","headline":"Road Work"},"geometry":{"type":"Point","coordinates":["-114.116626855441","45.9281005915485"]}},{"geometry":{"coordinates":["-110.561148923165","48.4194575807392"],"type":"Point"},"properties":{"category":"cnstr","dir":"B","last_update":1789598996,"route":"S-432","report":"The following road construction project is in progress: road construction with travel delay 35 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 15 mph until 7:00 PM Friday, October 2, 2026.<br />Milling of project ends begins 09/17/2026. Overlay paving operations scheduled to begin 09/21/2026. Expect traffic controlled by signals with pilot car and single lane traffic through active work areas during daylight hours Monday through Friday. May encounter uneven road surfaces. Speed reduced to 35 MPH.","event_id":"1102835","enhanced_report":"<b>S-432  from MP 34.2 to 40.5</b><br>Travel Delay 35 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 15 mph<br>Start Date: 9/17/2026 7:00 AM<br>End Date: &nbsp;&nbsp;10/2/2026 7:00 PM<br><p><b>Additional Information:</b><br>Milling of project ends begins 09/17/2026. Overlay paving operations scheduled to begin 09/21/2026. Expect traffic controlled by signals with pilot car and single lane traffic through active work areas during daylight hours Monday through Friday. May encounter uneven road surfaces. Speed reduced to 35 MPH.</p>","mrm":37.35,"label":"S-432<br />from MP 34.2 to 40.5","location_description":"S-432 from MP 34.2 to 40.5","headline":"Road Work"},"id":"1102835","type":"Feature"},{"id":"1102838","type":"Feature","geometry":{"type":"Point","coordinates":["-114.230564519073","48.0856462899778"]},"properties":{"report":"The following road construction project is in progress: road construction with flaggers, lane closures, and speed limit 35 mph until 5:00 PM Thursday, September 17, 2026.<br />ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT - EXPECT DELAYS","dir":"B","category":"cnstr","last_update":1789650012,"route":"US-93","location_description":"US-93 from MP 103.0 to 104.0","headline":"Road Work","event_id":"1102838","mrm":103.5,"enhanced_report":"<b>US-93  from MP 103.0 to 104.0</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 6:57 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT - EXPECT DELAYS</p>","label":"US-93<br />from MP 103.0 to 104.0"}},{"geometry":{"type":"Point","coordinates":["-111.132278700665","46.3529052799666"]},"properties":{"report":"The following road construction project is in progress: road construction with speed limit 35 mph until 5:00 PM Thursday, September 17, 2026.<br />WATCH FOR WORKERS","route":"US-12","dir":"B","category":"cnstr","last_update":1789655354,"headline":"Road Work","location_description":"US-12 from MP 19.0 to 21.0","enhanced_report":"<b>US-12  from MP 19.0 to 21.0</b><br>Speed Limit 35 mph<br>Start Date: 9/17/2026 8:28 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","mrm":20,"label":"US-12<br />from MP 19.0 to 21.0","event_id":"1102841"},"id":"1102841","type":"Feature"},{"properties":{"route":"S-314","last_update":1789656129,"dir":"B","category":"cnstr","report":"The following road construction project is in progress: road construction with flaggers, lane closures, and speed limit 35 mph until 5:00 PM Thursday, September 17, 2026.<br />WATCH FOR WORKERS","mrm":29,"enhanced_report":"<b>S-314  from MP 28.0 to 30.0</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 8:41 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","label":"S-314<br />from MP 28.0 to 30.0","event_id":"1102842","headline":"Road Work","location_description":"S-314 from MP 28.0 to 30.0"},"geometry":{"coordinates":["-106.979702154955","45.3141867757822"],"type":"Point"},"id":"1102842","type":"Feature"},{"type":"Feature","id":"1102843","geometry":{"coordinates":["-113.085566597971","46.7160450312474"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with flaggers, lane closures, and speed limit 35 mph until 5:00 PM Thursday, September 17, 2026.<br />ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT","route":"S-271","last_update":1789656280,"dir":"B","category":"cnstr","headline":"Road Work","location_description":"S-271 from MP 6.0 to 8.0","label":"S-271<br />from MP 6.0 to 8.0","enhanced_report":"<b>S-271  from MP 6.0 to 8.0</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 8:43 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT</p>","mrm":7,"event_id":"1102843"}},{"id":"1102845","type":"Feature","properties":{"report":"The following road construction project is in progress: road construction with lane closures, pilot car, and speed limit 35 mph until 5:00 PM Thursday, September 17, 2026.<br />ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT - LOOSE GRAVEL","category":"cnstr","dir":"B","last_update":1789656997,"route":"MT-200","location_description":"MT-200 from MP 5.0 to 6.0","headline":"Road Work","event_id":"1102845","enhanced_report":"<b>MT-200  from MP 5.0 to 6.0</b><br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 8:45 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING ONE LANE TRAFFIC - 35 MPH SPEED LIMIT - LOOSE GRAVEL</p>","mrm":5.5,"label":"MT-200<br />from MP 5.0 to 6.0"},"geometry":{"coordinates":["-115.93827694381","48.0726472759752"],"type":"Point"}},{"id":"1102846","type":"Feature","geometry":{"type":"Point","coordinates":["-112.183739092982","46.2558710464133"]},"properties":{"headline":"Road Work","location_description":"I-15 from MP 160.0 to 162.0","enhanced_report":"<b>I-15 SB from MP 160.0 to 162.0</b><br>Right lane CLOSED<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 9:13 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","mrm":161,"label":"I-15<br />from MP 160.0 to 162.0","event_id":"1102846","report":"The following road construction project is in progress: road construction with speed limit 35 mph and right lane closed southbound until 5:00 PM Thursday, September 17, 2026.<br />WATCH FOR WORKERS","route":"I-15","last_update":1789658069,"dir":"S","category":"cnstr"}},{"properties":{"location_description":"I-90 from MP 39.0 to 41.0","headline":"Road Work","event_id":"1102849","mrm":40,"enhanced_report":"<b>I-90 EB from MP 39.0 to 41.0</b><br>Right lane CLOSED<br>Speed Limit 35 mph<br>Start Date: 9/17/2026 9:56 AM<br>End Date: &nbsp;&nbsp;9/17/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>","label":"I-90<br />from MP 39.0 to 41.0","report":"The following road construction project is in progress: road construction with speed limit 35 mph and right lane closed eastbound until 5:00 PM Thursday, September 17, 2026.<br />WATCH FOR WORKERS","last_update":1789660637,"dir":"E","category":"cnstr","route":"I-90"},"geometry":{"type":"Point","coordinates":["-115.027871848395","47.2365345567054"]},"id":"1102849","type":"Feature"},{"id":"882549","type":"Feature","properties":{"event_id":"882549","label":"MT-86<br />from MP 24.1 to 28.1","enhanced_report":"<b>MT-86  from MP 24.1 to 28.1</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/5/2025 7:00 AM<br><p><b>Additional Information:</b><br>Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends. </p>","mrm":26.1,"location_description":"MT-86 from MP 24.1 to 28.1","headline":"Road Work","category":"cnstr","dir":"B","last_update":1751314119,"route":"MT-86","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, speed limit 35 mph, and width limit 12 ft until further notice.<br />Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends."},"geometry":{"coordinates":["-110.853240715469","45.9529996350098"],"type":"Point"}},{"geometry":{"coordinates":["-114.117517413352","48.0920991659472"],"type":"Point"},"properties":{"location_description":"MT-82 from MP 4.5 to 6.9","headline":"Road Work","event_id":"885957","enhanced_report":"<b>MT-82  from MP 4.5 to 6.9</b><br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 8/4/2025 8:00 AM<br>End Date: &nbsp;&nbsp;10/30/2027 5:00 PM<br><p><b>Additional Information:</b><br>Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours. \n\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","mrm":5.7,"label":"MT-82<br />from MP 4.5 to 6.9","report":"The following road construction project is in progress: road construction with flaggers, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 30, 2027.<br />Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours.","dir":"B","category":"cnstr","last_update":1783956700,"route":"MT-82","url":"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx"},"type":"Feature","id":"885957"},{"id":"886173","type":"Feature","geometry":{"coordinates":["-112.703557323067","45.5258384721225"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road closed until further notice.<br />MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.","route":"N HIGHWAY 91","category":"cnstr","last_update":1754947373,"headline":"Road Work","location_description":"N HIGHWAY 91","mrm":22.45,"enhanced_report":"<b>N HIGHWAY 91</b><br>ROAD CLOSED<br>Start Date: 10/22/2024 2:40 PM<br><p><b>Additional Information:</b><br>MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.</p>","label":"N HIGHWAY 91","event_id":"886173"}},{"type":"Feature","id":"954771","geometry":{"type":"Point","coordinates":["-106.138792009437","47.3255728190287"]},"properties":{"event_id":"954771","enhanced_report":"<b>MT-200  from MP 246.8 to 253.5</b><br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 12/17/2025 8:46 PM<br><p><b>Additional Information:</b><br>CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH </p>","label":"MT-200<br />from MP 246.8 to 253.5","mrm":250.15,"location_description":"MT-200 from MP 246.8 to 253.5","headline":"Road Work","last_update":1766029889,"category":"cnstr","dir":"B","route":"MT-200","report":"The following road construction project is in progress: road construction with width limit 14 ft and speed limit 35 mph until further notice.<br />CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH"}}]}