{"type":"FeatureCollection","features":[{"geometry":{"coordinates":["-112.362612525294","47.5025873851059"],"type":"Point"},"properties":{"headline":"Road Work","route":"MT-21","label":"MT-21<br />from MP 0.0 to 0.7","dir":"B","last_update":1783370487,"location_description":"MT-21 from MP 0.0 to 0.7","event_id":"1037070","url":"https://www.mdt.mt.gov/pubinvolve/mt21bridges","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, July 31, 2026.<br />The road is gravel surfacing from MM 0.0 to MM 0.7. Loose Gravel and Bumps will be present until paving occurs. Motorcycles should consider alternate routes.\nTravelers can expect reduced speeds, single lane closures during work hours, and equipment operating in the closed lane during work hours","mrm":0.35,"enhanced_report":"<b>MT-21  from MP 0.0 to 0.7</b><br>Motorcycles consider alternate route<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 3/18/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road is gravel surfacing from MM 0.0 to MM 0.7. Loose Gravel and Bumps will be present until paving occurs. Motorcycles should consider alternate routes.\nTravelers can expect reduced speeds, single lane closures during work hours,  and equipment operating in the closed lane during work hours\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt21bridges\" target=\"_blank\"><i>Website</i></a></p>","category":"cnstr"},"id":"1037070","type":"Feature"},{"properties":{"label":"S-288<br />from MP 14.6 to 15.5","headline":"Road Work","route":"S-288","event_id":"1050646","dir":"B","last_update":1782922471,"location_description":"S-288 from MP 14.6 to 15.5","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, pilot car, signal lights, speed limit 25 mph, and width limit 12 ft until 4:00 PM Friday, October 30, 2026.<br />Road re-construction in progress, traffic is controlled by flaggers, traffic signals and pilot car.","category":"cnstr","mrm":15.05,"enhanced_report":"<b>S-288  from MP 14.6 to 15.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 25 mph<br>Width Limit  12 feet<br>Start Date: 4/28/2026 7:30 AM<br>End Date: &nbsp;&nbsp;10/30/2026 4:00 PM<br><p><b>Additional Information:</b><br>Road re-construction in progress, traffic is controlled by flaggers, traffic signals and pilot car.\n \n</p>"},"geometry":{"coordinates":["-111.266388058554","45.6825342748208"],"type":"Point"},"type":"Feature","id":"1050646"},{"geometry":{"type":"Point","coordinates":["-115.378419591451","47.6046314825812"]},"properties":{"mrm":49.3,"enhanced_report":"<b>MT-200  from MP 49.2 to 49.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 25-35 mph<br>Width Limit  10 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK. </p>","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 25 to 35 mph, and width limit 10 ft until 7:00 PM Monday, November 16, 2026.<br />ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK.","dir":"B","last_update":1773332149,"location_description":"MT-200 from MP 49.2 to 49.4","event_id":"1058893","route":"MT-200","headline":"Road Work","label":"MT-200<br />from MP 49.2 to 49.4"},"id":"1058893","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-112.141252755761","47.7663722839213"]},"properties":{"enhanced_report":"<b>US-89  from MP 34.3 to 40.6</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 3/19/2026 2:14 PM<br><p><b>Additional Information:</b><br>M.A DeAtley is continuing to build subgrade for the new road alignment, culvert installation. Sletten has poured pile caps for the middle span of the new bridge anticipating setting bridge beams for the middle span 07/15. Traffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. From MP 38.4 to 40.6 one lane traffic will be piloted overnight from 7/9 - 7/17. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","mrm":37.45,"category":"cnstr","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 11 ft until further notice.<br />M.A DeAtley is continuing to build subgrade for the new road alignment, culvert installation. Sletten has poured pile caps for the middle span of the new bridge anticipating setting bridge beams for the middle span 07/15. Traffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. From MP 38.4 to 40.6 one lane traffic will be piloted overnight from 7/9 - 7/17. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.","url":"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx","location_description":"US-89 from MP 34.3 to 40.6","last_update":1783702648,"dir":"B","event_id":"1072371","route":"US-89","headline":"Road Work","label":"US-89<br />from MP 34.3 to 40.6"},"id":"1072371","type":"Feature"},{"id":"1073251","type":"Feature","geometry":{"coordinates":["-113.88390997677","47.958308153158"],"type":"Point"},"properties":{"event_id":"1073251","location_description":"MT-83 from MP 70.5 to 78.5","last_update":1782913269,"dir":"B","label":"MT-83<br />from MP 70.5 to 78.5","route":"MT-83","headline":"Road Work","category":"cnstr","enhanced_report":"<b>MT-83  from MP 70.5 to 78.5</b><br>Travel Delay 15 mins<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;10/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas. \n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt83bridges/\" target=\"_blank\"><i>Website</i></a></p>","mrm":74.5,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, October 30, 2026.<br />The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas.","url":"https://www.mdt.mt.gov/pubinvolve/mt83bridges/"}},{"id":"1078555","type":"Feature","geometry":{"coordinates":["-111.076207762342","45.72259346834"],"type":"Point"},"properties":{"category":"cnstr","enhanced_report":"<b>I-90  from MP 301.3 to 307.4</b><br>Motorcycles consider alternate route<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Chip seal operations scheduled to occur the week of July 23, 2026.  Traffic will be in a single lane in each direction.  Work will occur during the daytime.\n</p>","mrm":304.35,"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, lane closures, and speed limit 35 mph until 5:00 PM Tuesday, September 1, 2026.<br />Chip seal operations scheduled to occur the week of July 23, 2026. Traffic will be in a single lane in each direction. Work will occur during the daytime.","event_id":"1078555","location_description":"I-90 from MP 301.3 to 307.4","dir":"B","last_update":1784219668,"label":"I-90<br />from MP 301.3 to 307.4","route":"I-90","headline":"Road Work"}},{"properties":{"route":"I-90B","headline":"Road Work","label":"I-90B<br />at MP 58.0","last_update":1784124589,"dir":"B","location_description":"I-90B at MP 58.0","event_id":"1079160","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work on Exit 337 overpass structure. Single lane traffic and width restriction. Expect short delays.","mrm":57.97,"enhanced_report":"<b>I-90B  at MP 58.0</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 7:00 PM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Exit 337 overpass structure.  Single lane traffic and  width restriction.  Expect short delays.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","category":"cnstr"},"geometry":{"type":"Point","coordinates":["-110.500274302856","45.6881050838335"]},"type":"Feature","id":"1079160"},{"id":"1079783","type":"Feature","geometry":{"coordinates":["-112.376472583129","45.9151275204233"],"type":"Point"},"properties":{"event_id":"1079783","last_update":1777567391,"dir":"B","location_description":"I-90 at MP 235.0","label":"I-90<br />at MP 235.0","route":"I-90","headline":"Road Work","category":"cnstr","mrm":235,"enhanced_report":"<b>I-90  at MP 235.0</b><br>Start Date: 3/30/2026 8:00 AM<br><p><b>Additional Information:</b><br>I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED  FOR MAINTENANCE</p>","report":"The following road construction project is in progress: road construction until further notice.<br />I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED FOR MAINTENANCE"}},{"type":"Feature","id":"1080144","properties":{"label":"MT-16<br />from MP 28.9 to 37.5","route":"MT-16","headline":"Road Work","event_id":"1080144","location_description":"MT-16 from MP 28.9 to 37.5","dir":"N","last_update":1774643965,"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Sunday, November 15, 2026.<br />ALTERNATING SINGLE LANE TRAVEL","category":"cnstr","enhanced_report":"<b>MT-16 NB from MP 28.9 to 37.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 3/30/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAVEL</p>","mrm":33.2},"geometry":{"type":"Point","coordinates":["-104.343020312928","47.4714193988865"]}},{"properties":{"label":"MT-200<br />from MP 253.5 to 260.2","route":"MT-200","headline":"Road Work","event_id":"1084419","last_update":1780318184,"dir":"B","location_description":"MT-200 from MP 253.5 to 260.2","url":"https://www.mdt.mt.gov/pubinvolve/why200jordan/","report":"The following road construction project is in progress: road construction with travel delay 15 mins, pilot car, signal lights, speed limit 35 mph, and width limit 14 ft until 6:00 PM Sunday, November 15, 2026.<br />Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.","category":"cnstr","mrm":256.85,"enhanced_report":"<b>MT-200  from MP 253.5 to 260.2</b><br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 4/1/2026 3:04 PM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/why200jordan/\" target=\"_blank\"><i>Website</i></a></p>"},"geometry":{"type":"Point","coordinates":["-105.995986426994","47.3213564526461"]},"type":"Feature","id":"1084419"},{"type":"Feature","id":"1085227","properties":{"headline":"Road Work","route":"US-12","label":"US-12<br />from MP 228.0 to 260.0","location_description":"US-12 from MP 228.0 to 260.0","last_update":1775516032,"dir":"B","event_id":"1085227","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, detour, flaggers, lane closures, speed limit 25 mph, and width limit 14 ft until 5:00 PM Friday, December 11, 2026.<br />The road will contain loose gravel. 14' Width Restriction.","url":"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx ","enhanced_report":"<b>US-12  from MP 228.0 to 260.0</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Detour<br>Flaggers<br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/2/2026 7:48 AM<br>End Date: &nbsp;&nbsp;12/11/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road will contain loose gravel.  14' Width Restriction.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx \" target=\"_blank\"><i>Website</i></a></p>","mrm":244,"category":"cnstr"},"geometry":{"coordinates":["-107.142506718359","46.4634120172561"],"type":"Point"}},{"geometry":{"coordinates":["-112.123169171667","46.9250655070607"],"type":"Point"},"properties":{"category":"cnstr","enhanced_report":"<b>I-15  from MP 217.5 to 221.7</b><br>Lane closures<br>Median crossover detours<br>Speed Limit 45-55 mph<br>Length Limit  95 feet<br>Width Limit  12 feet<br>Start Date: 4/13/2026 5:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/i15sieben/\" target=\"_blank\"><i>Website</i></a></p>","mrm":219.6,"report":"The following road construction project is in progress: road construction with lane closures, length limit 95 ft, median crossover detours, speed limit 45 to 55 mph, and width limit 12 ft until 7:00 PM Tuesday, September 1, 2026.<br />NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday.","url":"https://mdt.mt.gov/pubinvolve/i15sieben/","event_id":"1088646","location_description":"I-15 from MP 217.5 to 221.7","last_update":1777567287,"dir":"B","label":"I-15<br />from MP 217.5 to 221.7","headline":"Road Work","route":"I-15"},"id":"1088646","type":"Feature"},{"id":"1089372","type":"Feature","geometry":{"coordinates":["-114.659148050516","47.0192496448387"],"type":"Point"},"properties":{"route":"I-90","headline":"Road Work","label":"I-90<br />from MP 66.1 to 66.4","dir":"B","last_update":1775576768,"location_description":"I-90 from MP 66.1 to 66.4","event_id":"1089372","url":"https://www.mdt.mt.gov/pubinvolve/i90alberton/","report":"The following road construction project is in progress: road construction until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.","mrm":66.25,"enhanced_report":"<b>I-90  from MP 66.1 to 66.4</b><br>Start Date: 4/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90alberton/\" target=\"_blank\"><i>Website</i></a></p>","category":"cnstr"}},{"type":"Feature","id":"1089800","properties":{"event_id":"1089800","dir":"B","last_update":1775662991,"location_description":"MT-7 from MP 35.0 to 36.0","label":"MT-7<br />from MP 35.0 to 36.0","headline":"Road Work","route":"MT-7","category":"cnstr","mrm":35.5,"enhanced_report":"<b>MT-7  from MP 35.0 to 36.0</b><br>Detour<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  24 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Traffic traveling on Paved detour \n\n</p>","report":"The following road construction project is in progress: road construction with detour, lane closures, speed limit 35 mph, and width limit 24 ft until 5:00 PM Tuesday, September 29, 2026.<br />Traffic traveling on Paved detour"},"geometry":{"type":"Point","coordinates":["-104.275406161318","46.3682326709782"]}},{"properties":{"category":"cnstr","mrm":2.5,"enhanced_report":"<b>I-90  from MP 0.0 to 5.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Median crossover detours<br>Speed Limit 35-55 mph<br>Width Limit  13 feet<br>Start Date: 4/8/2026 10:28 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting  6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-360-3107\n\n</p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, median crossover detours, speed limit 35 to 55 mph, and width limit 13 ft until 7:00 PM Monday, November 16, 2026.<br />East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting 6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-360-3107","event_id":"1089837","dir":"B","last_update":1778761002,"location_description":"I-90 from MP 0.0 to 5.0","label":"I-90<br />from MP 0.0 to 5.0","headline":"Road Work","route":"I-90"},"geometry":{"coordinates":["-115.661019640764","47.4353615400145"],"type":"Point"},"type":"Feature","id":"1089837"},{"id":"1090108","type":"Feature","geometry":{"coordinates":["-112.560568877555","45.9987575811237"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with lane closures and detour until 4:00 PM Tuesday, December 1, 2026.<br />Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd. Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection. Closure expected to continue through July.","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","enhanced_report":"<b>CENTENNIAL AVE</b><br>Detour<br>Lane closures<br>Start Date: 4/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 4:00 PM<br><p><b>Additional Information:</b><br>Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd.  Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection.  Closure expected to continue through July.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":0.11,"category":"cnstr","route":"CENTENNIAL AVE","headline":"Road Work","label":"CENTENNIAL AVE","location_description":"CENTENNIAL AVE","last_update":1782247778,"event_id":"1090108"}},{"geometry":{"coordinates":["-112.47707174804","45.9763958002525"],"type":"Point"},"properties":{"category":"cnstr","enhanced_report":"<b>I-90  from MP 227.0 to 228.0</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Median crossover detours<br>Speed Limit 45 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 4:00 PM<br><p><b>Additional Information:</b><br>BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road.  The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":227.5,"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, detour, flaggers, median crossover detours, speed limit 45 mph, and width limit 16 ft until 4:00 PM Tuesday, December 1, 2026.<br />BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road. The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection.","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","event_id":"1090121","location_description":"I-90 from MP 227.0 to 228.0","last_update":1782247792,"dir":"B","label":"I-90<br />from MP 227.0 to 228.0","headline":"Road Work","route":"I-90"},"id":"1090121","type":"Feature"},{"type":"Feature","id":"1090189","properties":{"label":"US-93<br />from MP 129.7 to 133.0","headline":"Road Work","route":"US-93","event_id":"1090189","last_update":1783345636,"dir":"B","location_description":"US-93 from MP 129.7 to 133.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 20 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, November 27, 2026.<br />Construction Crews will be working during daylight hours, Monday through Saturday, weather and other unforeseen circumstances permitting. Workers and equipment will also be present periodically overnight, as operations are necessary. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 20-minute delays.","category":"cnstr","mrm":131.35,"enhanced_report":"<b>US-93  from MP 129.7 to 133.0</b><br>Motorcycles consider alternate route<br>Travel Delay 20 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/27/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction Crews will be working during daylight hours, Monday through Saturday, weather and other unforeseen circumstances permitting. Workers and equipment will also be present periodically overnight, as operations are necessary. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 20-minute delays. </p>"},"geometry":{"type":"Point","coordinates":["-114.405796224872","48.40363902689"]}},{"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","mrm":13.85,"enhanced_report":"<b>MT-37  from MP 13.8 to 13.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","category":"cnstr","route":"MT-37","headline":"Road Work","label":"MT-37<br />from MP 13.8 to 13.9","last_update":1775846641,"dir":"B","location_description":"MT-37 from MP 13.8 to 13.9","event_id":"1090191"},"geometry":{"type":"Point","coordinates":["-115.322693378601","48.3655987456692"]},"type":"Feature","id":"1090191"},{"type":"Feature","id":"1090193","properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","mrm":23.3,"enhanced_report":"<b>MT-37  at MP 23.3</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","category":"cnstr","headline":"Road Work","route":"MT-37","label":"MT-37<br />at MP 23.3","last_update":1775845108,"dir":"B","location_description":"MT-37 at MP 23.3","event_id":"1090193"},"geometry":{"type":"Point","coordinates":["-115.255883243005","48.4761950786896"]}},{"geometry":{"type":"Point","coordinates":["-115.210054176294","48.535877185965"]},"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","category":"cnstr","enhanced_report":"<b>MT-37  at MP 29.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","mrm":29.4,"label":"MT-37<br />at MP 29.4","route":"MT-37","headline":"Road Work","event_id":"1090194","location_description":"MT-37 at MP 29.4","last_update":1775845352,"dir":"B"},"id":"1090194","type":"Feature"},{"id":"1090196","type":"Feature","geometry":{"type":"Point","coordinates":["-115.206537723938","48.5954033368767"]},"properties":{"route":"MT-37","headline":"Road Work","label":"MT-37<br />at MP 34.1","last_update":1775845545,"dir":"B","location_description":"MT-37 at MP 34.1","event_id":"1090196","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","mrm":34.1,"enhanced_report":"<b>MT-37  at MP 34.1</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","category":"cnstr"}},{"id":"1090197","type":"Feature","geometry":{"coordinates":["-115.26574521557","48.6277169631435"],"type":"Point"},"properties":{"mrm":37.9,"enhanced_report":"<b>MT-37  at MP 37.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","dir":"B","last_update":1775845715,"location_description":"MT-37 at MP 37.9","event_id":"1090197","route":"MT-37","headline":"Road Work","label":"MT-37<br />at MP 37.9"}},{"properties":{"location_description":"MT-37 at MP 48.5","dir":"B","last_update":1775845901,"event_id":"1090198","route":"MT-37","headline":"Road Work","label":"MT-37<br />at MP 48.5","enhanced_report":"<b>MT-37  at MP 48.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","mrm":48.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays"},"geometry":{"coordinates":["-115.285431578056","48.7598371624946"],"type":"Point"},"type":"Feature","id":"1090198"},{"type":"Feature","id":"1090199","properties":{"category":"cnstr","mrm":63.9,"enhanced_report":"<b>MT-37  at MP 63.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","event_id":"1090199","last_update":1775846016,"dir":"B","location_description":"MT-37 at MP 63.9","label":"MT-37<br />at MP 63.9","route":"MT-37","headline":"Road Work"},"geometry":{"coordinates":["-115.117262468785","48.8947606118414"],"type":"Point"}},{"id":"1091062","type":"Feature","geometry":{"coordinates":["-106.915392427053","47.3608255342406"],"type":"Point"},"properties":{"event_id":"1091062","location_description":"S-543","last_update":1777377994,"label":"S-543","route":"S-543","headline":"Road Work","category":"cnstr","enhanced_report":"<b>S-543</b><br>Detour<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/20/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 7:00 PM<br><p><b>Additional Information:</b><br>Bridge Replacement 2KM North of Jordan at Vail Creek. This is a 35 mph gravel road.</p>","mrm":0,"report":"The following road construction project is in progress: road construction with detour, speed limit 25 mph, and width limit 14 ft until 7:00 PM Friday, August 28, 2026.<br />Bridge Replacement 2KM North of Jordan at Vail Creek. This is a 35 mph gravel road."}},{"properties":{"report":"The following road construction project is in progress: road construction until 7:00 PM Friday, July 31, 2026.<br />Final Pavement Marking work July 27th.\nNo parking from 1st Avenue to 8th Avenue to allow for construction activities.\nWatch for workers, equipment, and traffic lane closures from \n1st Avenue to Golf Course Road.","mrm":0.6,"enhanced_report":"<b>W MAIN ST</b><br>Start Date: 6/22/2026 6:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 7:00 PM<br><p><b>Additional Information:</b><br>Final Pavement Marking work July 27th.\nNo parking from 1st Avenue to 8th Avenue to allow for construction activities.\nWatch for workers, equipment, and traffic lane closures from \n1st Avenue to Golf Course Road.\n</p>","category":"cnstr","route":"W MAIN ST","headline":"Road Work","label":"W MAIN ST","last_update":1784669087,"location_description":"W MAIN ST","event_id":"1093845"},"geometry":{"coordinates":["-108.784068432114","45.668307236238"],"type":"Point"},"type":"Feature","id":"1093845"},{"id":"1095440","type":"Feature","geometry":{"type":"Point","coordinates":["-111.949818307016","46.590256729943"]},"properties":{"mrm":47.8,"enhanced_report":"<b>US-12  from MP 45.7 to 49.9</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 5/4/2026 8:00 AM<br>End Date: &nbsp;&nbsp;8/19/2026 6:00 PM<br><p><b>Additional Information:</b><br>Single lane closures.  Wet Paint . Stay off lines\n\n\n</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 6:00 PM Wednesday, August 19, 2026.<br />Single lane closures. Wet Paint . Stay off lines","last_update":1782477468,"dir":"B","location_description":"US-12 from MP 45.7 to 49.9","event_id":"1095440","headline":"Road Work","route":"US-12","label":"US-12<br />from MP 45.7 to 49.9"}},{"geometry":{"type":"Point","coordinates":["-109.949486475835","45.8254934192736"]},"properties":{"category":"cnstr","enhanced_report":"<b>S-298  from MP 0.7 to 1.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 5/4/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/10/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge Rehab work with single lane traffic controlled by signals 24 hrs,7 days a week. Work  will continue until mid July.</p>","mrm":0.85,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 11 ft until 5:00 PM Monday, August 10, 2026.<br />Bridge Rehab work with single lane traffic controlled by signals 24 hrs,7 days a week. Work will continue until mid July.","event_id":"1095778","location_description":"S-298 from MP 0.7 to 1.0","dir":"B","last_update":1784150519,"label":"S-298<br />from MP 0.7 to 1.0","headline":"Road Work","route":"S-298"},"id":"1095778","type":"Feature"},{"properties":{"headline":"Road Work","route":"US-191","label":"US-191<br />from MP 86.0 to 88.5","dir":"B","last_update":1779279960,"location_description":"US-191 from MP 86.0 to 88.5","event_id":"1096611","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 9 ft until 5:00 PM Friday, September 18, 2026.<br />9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges.","mrm":87.25,"enhanced_report":"<b>US-191  from MP 86.0 to 88.5</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  9 feet<br>Start Date: 5/11/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/18/2026 5:00 PM<br><p><b>Additional Information:</b><br>9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges. </p>","category":"cnstr"},"geometry":{"coordinates":["-108.687762641939","47.619871710269"],"type":"Point"},"type":"Feature","id":"1096611"},{"properties":{"location_description":"I-15 from MP 96.0 to 111.0","last_update":1778074549,"dir":"N","event_id":"1096665","route":"I-15","headline":"Road Work","label":"I-15<br />from MP 96.0 to 111.0","enhanced_report":"<b>I-15 NB from MP 96.0 to 111.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 5/4/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 6:00 PM<br><p><b>Additional Information:</b><br>Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15</p>","mrm":103.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Friday, August 28, 2026.<br />Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15"},"geometry":{"type":"Point","coordinates":["-112.72665106716","45.7662317211268"]},"type":"Feature","id":"1096665"},{"properties":{"category":"cnstr","mrm":382.55,"enhanced_report":"<b>US-2  from MP 381.3 to 383.8</b><br>Lane closures<br>Speed Limit 25-35 mph<br>Start Date: 6/22/2026 4:00 PM<br>End Date: &nbsp;&nbsp;9/4/2026 8:00 PM<br><p><b>Additional Information:</b><br>Wide loads are not restricted but may be delayed. Please call ahead for wide loads 801-652-1569. \n\nWorkers are removing and replacing compromised concrete panels, grinding driving surfaces, and resealing concrete joints. The work is planned to phase in 4-5 block segments. Traffic will be routed to one-lane in each direction, guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Business accesses will be highlighted and guided with traffic control devices. For more information, contact 406-208-0551\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/havreurban/\" target=\"_blank\"><i>Website</i></a></p>","url":"https://www.mdt.mt.gov/pubinvolve/havreurban/","report":"The following road construction project is in progress: road construction with speed limit 25 to 35 mph and lane closures until 8:00 PM Friday, September 4, 2026.<br />Wide loads are not restricted but may be delayed. Please call ahead for wide loads 801-652-1569. \n\nWorkers are removing and replacing compromised concrete panels, grinding driving surfaces, and resealing concrete joints. The work is planned to phase in 4-5 block segments. Traffic will be routed to one-lane in each direction, guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Business accesses will be highlighted and guided with traffic control devices. For more information, contact 406-208-0551","event_id":"1096877","last_update":1782167112,"dir":"B","location_description":"US-2 from MP 381.3 to 383.8","label":"US-2<br />from MP 381.3 to 383.8","route":"US-2","headline":"Road Work"},"geometry":{"coordinates":["-109.67215663507","48.5530539006946"],"type":"Point"},"type":"Feature","id":"1096877"},{"type":"Feature","id":"1096893","properties":{"report":"The following road construction project is in progress: road construction with median crossover detours, speed limit 35 to 65 mph, and width limit 16 ft until 8:00 PM Sunday, November 15, 2026.<br />West bound traffic merges to east bound passing lane with median detours.","category":"cnstr","mrm":189.85,"enhanced_report":"<b>I-94  from MP 187.1 to 192.6</b><br>Median crossover detours<br>Speed Limit 35-65 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 8:00 PM<br><p><b>Additional Information:</b><br>West bound traffic merges to east bound passing lane with median detours.\n\n</p>","label":"I-94<br />from MP 187.1 to 192.6","headline":"Road Work","route":"I-94","event_id":"1096893","last_update":1778551821,"dir":"B","location_description":"I-94 from MP 187.1 to 192.6"},"geometry":{"coordinates":["-105.067999357911","46.8808194421691"],"type":"Point"}},{"id":"1096961","type":"Feature","geometry":{"coordinates":["-113.643981140321","48.3481924649148"],"type":"Point"},"properties":{"category":"cnstr","mrm":174.9,"enhanced_report":"<b>US-2  from MP 169.1 to 180.7</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 5/13/2026 7:00 AM<br><p><b>Additional Information:</b><br> Traffic can expect Temporary Traffic Control Lights with Pilot cars to escort through the work zone. Work areas will be limited to single lane. Work will consist of Guardrail installation on the west end of the project and proceeding east. Please watch for workers and equipment throughout the project. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/stantonessex\" target=\"_blank\"><i>Website</i></a></p>","url":"https://www.mdt.mt.gov/pubinvolve/stantonessex","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, pilot car, signal lights, and speed limit 35 mph until further notice.<br /> Traffic can expect Temporary Traffic Control Lights with Pilot cars to escort through the work zone. Work areas will be limited to single lane. Work will consist of Guardrail installation on the west end of the project and proceeding east. Please watch for workers and equipment throughout the project.","event_id":"1096961","dir":"B","last_update":1781783752,"location_description":"US-2 from MP 169.1 to 180.7","label":"US-2<br />from MP 169.1 to 180.7","route":"US-2","headline":"Road Work"}},{"geometry":{"coordinates":["-112.039365455286","46.7043615487372"],"type":"Point"},"properties":{"enhanced_report":"<b>S-279  from MP 0.6 to 1.3</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Lane closures<br>ROAD CLOSED<br>Signal lights<br>Speed Limit 15 mph<br>Start Date: 5/18/2026 12:00 PM<br>End Date: &nbsp;&nbsp;10/7/2026 6:00 PM<br><p><b>Additional Information:</b><br>Road Construction at the Lincoln Rd and Applegate Dr Intersection.  \nDetours in place with turning restrictions.  Use alternative routes when possible.\nWestbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection.  No left (South) turn onto Applegate Drive. \nEastbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection.  Additional detour for right turn (South) onto Applegate Drive.\nSouthbound travelers (Applegate Dr): Two-way, 15 mph detour around the northern portion of the intersection.  Left/Right turn only onto Lincoln Road\nNorthbound travelers (Applegate Dr): Right turn (East) only onto Lincoln Road.  \nExpect single lane closures controlled by signal lights and flaggers during various operations.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/\" target=\"_blank\"><i>Website</i></a></p>","mrm":0.95,"category":"cnstr","report":"The following road construction project is in progress: road closed with Motorcycles consider alternate route, detour, flaggers, lane closures, signal lights, and speed limit 15 mph until 6:00 PM Wednesday, October 7, 2026.<br />Road Construction at the Lincoln Rd and Applegate Dr Intersection. \nDetours in place with turning restrictions. Use alternative routes when possible.\nWestbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection. No left (South) turn onto Applegate Drive. \nEastbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection. Additional detour for right turn (South) onto Applegate Drive.\nSouthbound travelers (Applegate Dr): Two-way, 15 mph detour around the northern portion of the intersection. Left/Right turn only onto Lincoln Road\nNorthbound travelers (Applegate Dr): Right turn (East) only onto Lincoln Road. \nExpect single lane closures controlled by signal lights and flaggers during various operations.","url":"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/","location_description":"S-279 from MP 0.6 to 1.3","dir":"B","last_update":1780070615,"event_id":"1098028","headline":"Road Work","route":"S-279","label":"S-279<br />from MP 0.6 to 1.3"},"id":"1098028","type":"Feature"},{"id":"1098361","type":"Feature","geometry":{"coordinates":["-104.564306729396","48.7758797049185"],"type":"Point"},"properties":{"location_description":"MT-5 from MP 41.0 to 42.0","last_update":1779397085,"dir":"B","event_id":"1098361","route":"MT-5","headline":"Road Work","label":"MT-5<br />from MP 41.0 to 42.0","enhanced_report":"<b>MT-5  from MP 41.0 to 42.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Speed Limit 15 mph<br>Width Limit  12 feet<br>Start Date: 6/1/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/26/2026 5:00 PM<br><p><b>Additional Information:</b><br>City of Plentywood water project</p>","mrm":41.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, speed limit 15 mph, and width limit 12 ft until 5:00 PM Wednesday, August 26, 2026.<br />City of Plentywood water project"}},{"id":"1098811","type":"Feature","geometry":{"coordinates":["-114.149010118904","47.2292902121808"],"type":"Point"},"properties":{"location_description":"US-93 from MP 20.1 to 26.7","dir":"B","last_update":1784822262,"event_id":"1098811","headline":"Road Work","route":"US-93","label":"US-93<br />from MP 20.1 to 26.7","enhanced_report":"<b>US-93  from MP 20.1 to 26.7</b><br>Travel Delay 60 mins<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 7/8/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/11/2026 8:00 PM<br><p><b>Additional Information:</b><br> WORK SUSPENDED UNTIL JULY 27TH; JULY 27TH-28TH EXPECT 20 MINUTE DELAYS, M-F, 6 AM - 7 PM,  FOR RUMBLE STRIP INSTALLATION. JULY 30TH -31ST EXPECT 45 MINUTE DELAYS DURING CHIP SEALING OPERATIONS.  SINGLE LANE TRAFFIC, TRAFFIC SIGNALS AND PILOT CARS WILL BE IN USE. </p>","mrm":23.4,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 60 mins, lane closures, pilot car, signal lights, and speed limit 35 mph until 8:00 PM Friday, September 11, 2026.<br /> WORK SUSPENDED UNTIL JULY 27TH; JULY 27TH-28TH EXPECT 20 MINUTE DELAYS, M-F, 6 AM - 7 PM, FOR RUMBLE STRIP INSTALLATION. JULY 30TH -31ST EXPECT 45 MINUTE DELAYS DURING CHIP SEALING OPERATIONS. SINGLE LANE TRAFFIC, TRAFFIC SIGNALS AND PILOT CARS WILL BE IN USE."}},{"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, flaggers, lane closures, pilot car, signal lights, speed limit 25 to 35 mph, and width limit 14 ft until 8:00 PM Monday, September 7, 2026.<br />The project will continue until epoxy striping is complete. This will be roughly Sept 7th. There will be chip seal and rumble strip work the first two weeks of the project.","category":"cnstr","enhanced_report":"<b>MT-200  from MP 192.2 to 201.1</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 25-35 mph<br>Width Limit  14 feet<br>Start Date: 7/6/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/7/2026 8:00 PM<br><p><b>Additional Information:</b><br>The project will continue until epoxy striping is complete. This will be roughly Sept 7th. There will be chip seal and rumble strip work the first two weeks of the project.</p>","mrm":196.65,"label":"MT-200<br />from MP 192.2 to 201.1","route":"MT-200","headline":"Road Work","event_id":"1099388","location_description":"MT-200 from MP 192.2 to 201.1","dir":"B","last_update":1784638649},"geometry":{"type":"Point","coordinates":["-107.194555846298","47.2093240891657"]},"type":"Feature","id":"1099388"},{"geometry":{"type":"Point","coordinates":["-112.324550336262","44.5612057782544"]},"properties":{"report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft southbound until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","category":"cnstr","enhanced_report":"<b>I-15 SB from MP 0.0 to 1.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:04 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>","mrm":0.75,"label":"I-15<br />from MP 0.0 to 1.5","headline":"Road Work","route":"I-15","event_id":"1099439","location_description":"I-15 from MP 0.0 to 1.5","dir":"S","last_update":1782313136},"id":"1099439","type":"Feature"},{"properties":{"report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","mrm":23.5,"enhanced_report":"<b>I-15  from MP 22.5 to 24.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:15 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>","category":"cnstr","headline":"Road Work","route":"I-15","label":"I-15<br />from MP 22.5 to 24.5","last_update":1782313072,"dir":"B","location_description":"I-15 from MP 22.5 to 24.5","event_id":"1099441"},"geometry":{"coordinates":["-112.700914878439","44.7215555036881"],"type":"Point"},"type":"Feature","id":"1099441"},{"type":"Feature","id":"1099442","properties":{"label":"I-15<br />from MP 18.5 to 20.5","headline":"Road Work","route":"I-15","event_id":"1099442","dir":"N","last_update":1782313194,"location_description":"I-15 from MP 18.5 to 20.5","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 17 ft northbound until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE","category":"cnstr","mrm":19.5,"enhanced_report":"<b>I-15 NB from MP 18.5 to 20.5</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  17 feet<br>Start Date: 6/9/2026 10:18 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE </p>"},"geometry":{"type":"Point","coordinates":["-112.643455402171","44.6798657485134"]}},{"geometry":{"coordinates":["-112.737619095324","45.1363050076339"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 14 ft northbound daily between 7:00 AM and 5:00 PM until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE \nLoads wider than 14FT use the off and on ramps to bypass the bridge.","enhanced_report":"<b>I-15 NB from MP 55.0 to 57.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 6/9/2026 10:48 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE \nLoads wider than 14FT use the off and on ramps to bypass the bridge.</p>","mrm":56,"category":"cnstr","route":"I-15","headline":"Road Work","label":"I-15<br />from MP 55.0 to 57.0","location_description":"I-15 from MP 55.0 to 57.0","dir":"N","last_update":1781190294,"event_id":"1099444"},"id":"1099444","type":"Feature"},{"geometry":{"coordinates":["-115.455874866983","47.3967699294057"],"type":"Point"},"properties":{"route":"I-90","headline":"Road Work","label":"I-90<br />from MP 11.2 to 15.7","location_description":"I-90 from MP 11.2 to 15.7","dir":"B","last_update":1782935560,"event_id":"1099621","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Tuesday, August 25, 2026.<br />This project on I-90 consists of resurfacing the existing roadway including mill, plant mix overlay, new guardrail, seal and cover. This project is in Mineral County starting just east of the Saltese Interchange at reference point 11.2 going east for 4.6 miles to just west of the Haugan Interchange at reference point 15.7.","enhanced_report":"<b>I-90  from MP 11.2 to 15.7</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 5/26/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/25/2026 5:00 PM<br><p><b>Additional Information:</b><br>This project on I-90 consists of resurfacing the existing roadway including mill, plant mix overlay, new guardrail, seal and cover. This project is in Mineral County starting just east of the Saltese Interchange at reference point 11.2 going east for 4.6 miles to just west of the Haugan Interchange at reference point 15.7.\n\n</p>","mrm":13.45,"category":"cnstr"},"id":"1099621","type":"Feature"},{"id":"1099672","type":"Feature","geometry":{"type":"Point","coordinates":["-109.158829583328","47.0586420238791"]},"properties":{"category":"cnstr","enhanced_report":"<b>US-87  from MP 95.0 to 96.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 6/18/2026 6:30 AM<br>End Date: &nbsp;&nbsp;9/15/2026 7:00 PM<br><p><b>Additional Information:</b><br>Please contact Jim Milford 406-350-0985 jmilford@mt.gov.\n24 hour signal light control till bridge decks can be repaired and re surfaced\n\n</p>","mrm":95.75,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 16 ft until 7:00 PM Tuesday, September 15, 2026.<br />Please contact Jim Milford 406-350-0985 jmilford@mt.gov.\n24 hour signal light control till bridge decks can be repaired and re surfaced","event_id":"1099672","location_description":"US-87 from MP 95.0 to 96.5","dir":"B","last_update":1781730425,"label":"US-87<br />from MP 95.0 to 96.5","headline":"Road Work","route":"US-87"}},{"properties":{"mrm":106.25,"enhanced_report":"<b>US-87  from MP 105.0 to 107.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 6/18/2026 6:30 AM<br>End Date: &nbsp;&nbsp;9/15/2026 7:00 PM<br><p><b>Additional Information:</b><br>24 HOUR SIGNAL LIGHT CONTROL UNTIL BRIDGE DECKS CAN BE REPAIRED AND RE-SURFACED.  Any questions, Please contact Jim Milford 406-350-0985 jmilford@mt.gov.\n</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 16 ft until 7:00 PM Tuesday, September 15, 2026.<br />24 HOUR SIGNAL LIGHT CONTROL UNTIL BRIDGE DECKS CAN BE REPAIRED AND RE-SURFACED. Any questions, Please contact Jim Milford 406-350-0985 jmilford@mt.gov.","dir":"B","last_update":1781730546,"location_description":"US-87 from MP 105.0 to 107.5","event_id":"1099676","route":"US-87","headline":"Road Work","label":"US-87<br />from MP 105.0 to 107.5"},"geometry":{"coordinates":["-108.942688777122","47.0480352214197"],"type":"Point"},"type":"Feature","id":"1099676"},{"properties":{"enhanced_report":"<b>MT-81  from MP 19.0 to 20.0</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Start Date: 6/18/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 5:00 PM<br><p><b>Additional Information:</b><br>Starting out much of the work being performed will be done outside of the roadway. Reduced speed limit. Watch for trucks and equipment entering/exiting the work zone. Work will occur Monday through Friday 6am to 6pm. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/lewistownbridges/default.aspx\" target=\"_blank\"><i>Website</i></a></p>","mrm":19.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 35 mph and Motorcycles consider alternate route until 5:00 PM Friday, August 28, 2026.<br />Starting out much of the work being performed will be done outside of the roadway. Reduced speed limit. Watch for trucks and equipment entering/exiting the work zone. Work will occur Monday through Friday 6am to 6pm.","url":"https://www.mdt.mt.gov/pubinvolve/lewistownbridges/default.aspx","location_description":"MT-81 from MP 19.0 to 20.0","last_update":1781707782,"dir":"B","event_id":"1099842","headline":"Road Work","route":"MT-81","label":"MT-81<br />from MP 19.0 to 20.0"},"geometry":{"coordinates":["-109.829784422381","47.2897120699959"],"type":"Point"},"type":"Feature","id":"1099842"},{"properties":{"last_update":1782141153,"dir":"B","location_description":"S-324 from MP 12.0 to 27.0","event_id":"1099993","headline":"Road Work","route":"S-324","label":"S-324<br />from MP 12.0 to 27.0","mrm":19.5,"enhanced_report":"<b>S-324  from MP 12.0 to 27.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 7/2/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/7/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction is planned to begin the week of July 6, 2026 \nConstruction activities include a crack seal followed by seal and cover (chip seal) and pavement markings. \n</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, August 7, 2026.<br />Construction is planned to begin the week of July 6, 2026 \nConstruction activities include a crack seal followed by seal and cover (chip seal) and pavement markings."},"geometry":{"type":"Point","coordinates":["-113.204226311643","45.0041105610097"]},"type":"Feature","id":"1099993"},{"geometry":{"coordinates":["-112.020423878983","46.5872418137234"],"type":"Point"},"properties":{"headline":"Road Work","route":"North Montana Avenue","label":"North Montana Avenue","last_update":1782325202,"location_description":"North Montana Avenue","event_id":"1100040","report":"The following road construction project is in progress: road construction with lane closures until 7:00 PM Friday, August 14, 2026.<br />Crosswalk upgrades on North Montana requiring single lane closures from 9th Ave. to Breckenridge Street. Crosswalks will be intermittently closed during this work. Pedestrians will be detoured around work zones. Side street and shoulder closures will be limited to areas under construction only.","mrm":0,"enhanced_report":"<b>North Montana Avenue</b><br>Lane closures<br>Start Date: 6/18/2026 9:00 AM<br>End Date: &nbsp;&nbsp;8/14/2026 7:00 PM<br><p><b>Additional Information:</b><br>Crosswalk upgrades on North Montana requiring single lane closures from 9th Ave. to Breckenridge Street. Crosswalks will be intermittently closed during this work. Pedestrians will be detoured around work zones. Side street and shoulder closures will be limited to areas under construction only. </p>","category":"cnstr"},"id":"1100040","type":"Feature"},{"id":"1100049","type":"Feature","geometry":{"coordinates":["-115.918591257437","48.4966916288793"],"type":"Point"},"properties":{"category":"cnstr","enhanced_report":"<b>US-2  from MP 11.0 to 12.0</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Lane closure with flaggers. Speed limit posted to 35MPH. 12FT Width restrictions.</p>","mrm":11.5,"report":"The following road construction project is in progress: road construction with flaggers, lane closures, speed limit 35 mph, and width limit 12 ft until 5:00 PM Friday, July 31, 2026.<br />Lane closure with flaggers. Speed limit posted to 35MPH. 12FT Width restrictions.","event_id":"1100049","location_description":"US-2 from MP 11.0 to 12.0","last_update":1783406501,"dir":"B","label":"US-2<br />from MP 11.0 to 12.0","headline":"Road Work","route":"US-2"}},{"id":"1100058","type":"Feature","geometry":{"type":"Point","coordinates":["-111.193792144454","45.3846950271776"]},"properties":{"headline":"Road Work","route":"US-191","label":"US-191<br />from MP 53.0 to 65.0","location_description":"US-191 from MP 53.0 to 65.0","last_update":1784322787,"dir":"B","event_id":"1100058","report":"The following road construction project is in progress: road construction with travel delay 10 mins, lane closures, pilot car, signal lights, and speed limit 35 mph until 7:00 PM Friday, July 31, 2026.<br />Night lane Closures Starting at 8:00 pm to 6:00am. Work will go from Sunday night to Friday morning for the next 4 weeks. Traffic will be open during the day. Due to heavy traffic, work will need to start at 8:00pm","enhanced_report":"<b>US-191  from MP 53.0 to 65.0</b><br>Travel Delay 10 mins<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/23/2026 7:39 AM<br>End Date: &nbsp;&nbsp;7/31/2026 7:00 PM<br><p><b>Additional Information:</b><br>Night lane Closures Starting at 8:00 pm to 6:00am.  Work will go from Sunday night to Friday morning for the next 4 weeks. Traffic will be open during the day. Due to heavy traffic, work will need to start at 8:00pm</p>","mrm":59,"category":"cnstr"}},{"id":"1100130","type":"Feature","geometry":{"coordinates":["-111.200919660629","44.6811970088826"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 30 mins, detour, flaggers, lane closures, signal lights, and speed limit 35 mph until 7:00 PM Wednesday, September 23, 2026.<br />Single lane traffic, be prepared for slow and stop traffic, expect extended delays.","category":"cnstr","mrm":4.3,"enhanced_report":"<b>US-20  from MP 0.0 to 8.6</b><br>Motorcycles consider alternate route<br>Travel Delay 30 mins<br>Detour<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/29/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/23/2026 7:00 PM<br><p><b>Additional Information:</b><br>Single lane traffic, be prepared for slow and stop traffic, expect extended delays.</p>","label":"US-20<br />from MP 0.0 to 8.6","route":"US-20","headline":"Road Work","event_id":"1100130","dir":"B","last_update":1783819073,"location_description":"US-20 from MP 0.0 to 8.6"}},{"geometry":{"coordinates":["-110.566857863986","45.5970095484595"],"type":"Point"},"properties":{"headline":"Road Work","route":"S-540","label":"S-540<br />from MP 31.4 to 31.5","location_description":"S-540 from MP 31.4 to 31.5","dir":"B","last_update":1784124552,"event_id":"1100362","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 9 ft until 7:00 PM Friday, August 14, 2026.<br />Bridge work on Carter's Bridge. Single lane traffic and width restriction. Expect short delays.","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges","enhanced_report":"<b>S-540  from MP 31.4 to 31.5</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  9 feet<br>Start Date: 7/6/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/14/2026 7:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Carter's Bridge. Single lane traffic and width restriction. Expect short delays.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":31.45,"category":"cnstr"},"id":"1100362","type":"Feature"},{"type":"Feature","id":"1100370","properties":{"label":"US-89<br />from MP 1.5 to 1.6","route":"US-89","headline":"Road Work","event_id":"1100370","location_description":"US-89 from MP 1.5 to 1.6","dir":"N","last_update":1784124630,"report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 10 ft northbound until 7:00 PM Friday, August 14, 2026.<br />Bridge work on Yellowstone River bridge. Single lane traffic and width restriction. Expect short delays.","url":"https://mdt.mt.gov/pubinvolve/livingstonbridges","category":"cnstr","enhanced_report":"<b>US-89 NB from MP 1.5 to 1.6</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 7/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/14/2026 7:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Yellowstone River bridge. Single lane traffic and width restriction. Expect short delays.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":1.55},"geometry":{"type":"Point","coordinates":["-110.467016744305","45.7173440189819"]}},{"properties":{"route":"US-93","headline":"Road Work","label":"US-93<br />from MP 75.0 to 82.6","dir":"B","last_update":1784923078,"location_description":"US-93 from MP 75.0 to 82.6","event_id":"1100476","report":"The following road construction project is in progress: road construction with speed limit 45 to 55 mph and lane closures until 6:00 PM Tuesday, August 11, 2026.<br />Paving operation on both the west and east side shared-use path along US93 from Lolo Creek Bridge to Long Ave., Florence, MT. Expect intermittent closures on the shared-use path.","mrm":78.8,"enhanced_report":"<b>US-93  from MP 75.0 to 82.6</b><br>Lane closures<br>Speed Limit 45-55 mph<br>Start Date: 7/23/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/11/2026 6:00 PM<br><p><b>Additional Information:</b><br>Paving operation on both the west and east side shared-use path along US93 from Lolo Creek Bridge to Long Ave., Florence, MT. Expect intermittent closures on the shared-use path.</p>","category":"cnstr"},"geometry":{"type":"Point","coordinates":["-114.073946513379","46.6901862633124"]},"type":"Feature","id":"1100476"},{"type":"Feature","id":"1100672","properties":{"mrm":221.34,"enhanced_report":"<b>US-2  from MP 221.1 to 221.6</b><br>Lane closures<br>Speed Limit 25 mph<br>Start Date: 7/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/24/2026 5:00 PM<br><p><b>Additional Information:</b><br>Travelers can expect single lane closures through Browning for sidewalk ADA upgrades and a mill & fill. Pedestrians will be detoured around work zones.</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 25 mph and lane closures until 5:00 PM Thursday, September 24, 2026.<br />Travelers can expect single lane closures through Browning for sidewalk ADA upgrades and a mill & fill. Pedestrians will be detoured around work zones.","dir":"B","last_update":1783713630,"location_description":"US-2 from MP 221.1 to 221.6","event_id":"1100672","route":"US-2","headline":"Road Work","label":"US-2<br />from MP 221.1 to 221.6"},"geometry":{"coordinates":["-113.014188244782","48.5559484681412"],"type":"Point"}},{"properties":{"enhanced_report":"<b>MT-200  from MP 95.0 to 97.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 7/14/2026 7:21 AM<br>End Date: &nbsp;&nbsp;8/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>WORK IS SUSPENDED UNTIL AUGUST.  </p>","mrm":96,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, pilot car, signal lights, and speed limit 35 mph until 6:00 PM Saturday, August 15, 2026.<br />WORK IS SUSPENDED UNTIL AUGUST.","location_description":"MT-200 from MP 95.0 to 97.0","dir":"B","last_update":1784556542,"event_id":"1100736","route":"MT-200","headline":"Road Work","label":"MT-200<br />from MP 95.0 to 97.0"},"geometry":{"coordinates":["-112.325758131897","47.1467167213889"],"type":"Point"},"type":"Feature","id":"1100736"},{"type":"Feature","id":"1100764","properties":{"category":"cnstr","mrm":0.83,"enhanced_report":"<b>US-87  from MP 0.0 to 1.7</b><br>Lane closures<br>Start Date: 7/14/2026 2:57 PM<br>End Date: &nbsp;&nbsp;7/28/2026 7:00 PM<br><p><b>Additional Information:</b><br>The public can obtain updates on progress by texting 844-764-2126 or emailing greatfalls@kljeng.com. This is now on 15th ST (US-87) between 12th Ave N and 10th Ave S, Great Falls. Right lane is closed, left lane is open. </p>","report":"The following road construction project is in progress: road construction with lane closures until 7:00 PM Tuesday, July 28, 2026.<br />The public can obtain updates on progress by texting 844-764-2126 or emailing greatfalls@kljeng.com. This is now on 15th ST (US-87) between 12th Ave N and 10th Ave S, Great Falls. Right lane is closed, left lane is open.","event_id":"1100764","dir":"B","last_update":1784062835,"location_description":"US-87 from MP 0.0 to 1.7","label":"US-87<br />from MP 0.0 to 1.7","headline":"Road Work","route":"US-87"},"geometry":{"coordinates":["-111.281612009052","47.5075927362073"],"type":"Point"}},{"properties":{"label":"MT-2<br />at MP 3.9","route":"MT-2","headline":"Road Work","event_id":"1100978","last_update":1784586401,"dir":"B","location_description":"MT-2 at MP 3.9","report":"The following road construction project is in progress: road construction with gross weight limit 20000 lbs, signal lights, and speed limit 35 mph until further notice.<br />WB LANE CLOSED, 10 TON WEIGHT LIMIT","category":"cnstr","mrm":3.9,"enhanced_report":"<b>MT-2  at MP 3.9</b><br>Signal lights<br>Speed Limit 35 mph<br>Gross Weight Limit  20000 lbs<br>Start Date: 7/20/2026 1:46 PM<br><p><b>Additional Information:</b><br>WB LANE CLOSED, 10 TON WEIGHT LIMIT</p>"},"geometry":{"type":"Point","coordinates":["-112.185811371121","45.8787033766838"]},"type":"Feature","id":"1100978"},{"id":"1101007","type":"Feature","geometry":{"type":"Point","coordinates":["-115.505364972791","48.3146911708432"]},"properties":{"category":"cnstr","mrm":2.55,"enhanced_report":"<b>S-482  from MP 2.5 to 2.6</b><br>ROAD CLOSED<br>Start Date: 7/21/2026 10:03 AM<br>End Date: &nbsp;&nbsp;5/28/2027 5:00 PM<br><p><b>Additional Information:</b><br>S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure. </p>","report":"The following road construction project is in progress: road closed until 5:00 PM Friday, May 28, 2027.<br />S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure.","event_id":"1101007","last_update":1784664990,"dir":"B","location_description":"S-482 from MP 2.5 to 2.6","label":"S-482<br />from MP 2.5 to 2.6","route":"S-482","headline":"Road Work"}},{"geometry":{"type":"Point","coordinates":["-114.737200697064","47.0220294058923"]},"properties":{"last_update":1784659977,"dir":"E","location_description":"I-90 from MP 61.8 to 62.4","event_id":"1101012","route":"I-90","headline":"Road Work","label":"I-90<br />from MP 61.8 to 62.4","mrm":62.1,"enhanced_report":"<b>I-90 EB from MP 61.8 to 62.4</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 7/14/2026 10:48 AM<br><p><b>Additional Information:</b><br>Roadway & roadside safety improvements on Guardrail & Fencing on I-90 located in three sections within the MDT Missoula District. The work includes replacing existing deteriorated fence and guardrail.\n</p>","category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures eastbound until further notice.<br />Roadway & roadside safety improvements on Guardrail & Fencing on I-90 located in three sections within the MDT Missoula District. The work includes replacing existing deteriorated fence and guardrail."},"id":"1101012","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-112.008608293783","45.8761654572901"]},"properties":{"headline":"Road Work","route":"I-90","label":"I-90<br />from MP 245.0 to 262.0","last_update":1784723836,"dir":"E","location_description":"I-90 from MP 245.0 to 262.0","event_id":"1101027","report":"The following road construction project is in progress: road construction with lane closures, median crossover detours, speed limit 55 mph, and width limit 16 ft eastbound until further notice.<br />A 16 foot width restriction will be in place on I-90 from RP 246 to 262. An alternate route will need to be used.\nTwo-way traffic will be in the eastbound lanes between crossovers which are located at RP 247 to 257. Wide load staging areas are located at RP 246 for eastbound traffic and 262 for westbound traffic. Passage of wide loads will take place from 8 PM - 10PM, Monday - Friday.","mrm":253.5,"enhanced_report":"<b>I-90 EB from MP 245.0 to 262.0</b><br>Lane closures<br>Median crossover detours<br>Speed Limit 55 mph<br>Width Limit  16 feet<br>Start Date: 7/15/2026 8:52 AM<br><p><b>Additional Information:</b><br>A 16 foot width restriction will be in place on I-90 from RP 246 to 262.  An alternate route will need to be used.\nTwo-way traffic will be in the eastbound lanes between crossovers which are located at RP 247 to 257.  Wide load staging areas are located at RP 246 for eastbound traffic and 262 for westbound traffic.  Passage of wide loads will take place from 8 PM - 10PM, Monday - Friday.\n</p>","category":"cnstr"},"id":"1101027","type":"Feature"},{"id":"1101094","type":"Feature","geometry":{"type":"Point","coordinates":["-114.054740217858","46.6327262719249"]},"properties":{"event_id":"1101094","location_description":"S-203 from MP 10.1 to 12.3","dir":"B","last_update":1784809900,"label":"S-203<br />from MP 10.1 to 12.3","route":"S-203","headline":"Road Work","category":"cnstr","enhanced_report":"<b>S-203  from MP 10.1 to 12.3</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35-45 mph<br>Start Date: 7/27/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Concrete sidewalk construction at the intersection of US 93 and Eastside Hwy</p>","mrm":11.2,"report":"The following road construction project is in progress: from 7:00 AM Monday, July 27, 2026 road construction with travel delay 10 mins, flaggers, lane closures, signal lights, and speed limit 35 to 45 mph until 5:00 PM Friday, July 31, 2026.<br />Concrete sidewalk construction at the intersection of US 93 and Eastside Hwy"}},{"id":"1101095","type":"Feature","geometry":{"coordinates":["-114.22431424741","47.0125398850055"],"type":"Point"},"properties":{"category":"cnstr","enhanced_report":"<b>Beckwith Street</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Speed Limit 25-35 mph<br>Start Date: 7/27/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Electrical installation on Beckwith Street. Expect single lane closure with flaggers and reduced speeds.</p>","mrm":0,"report":"The following road construction project is in progress: from 7:00 AM Monday, July 27, 2026 road construction with travel delay 10 mins, flaggers, lane closures, and speed limit 25 to 35 mph until 5:00 PM Wednesday, July 29, 2026.<br />Electrical installation on Beckwith Street. Expect single lane closure with flaggers and reduced speeds.","event_id":"1101095","location_description":"Beckwith Street","last_update":1784810160,"label":"Beckwith Street","headline":"Road Work","route":"Beckwith Street"}},{"geometry":{"type":"Point","coordinates":["-113.969360079617","46.8633579616911"]},"properties":{"location_description":"MT HWY 200","last_update":1784911416,"event_id":"1101098","headline":"Road Work","route":"MT HWY 200","label":"MT HWY 200","enhanced_report":"<b>MT HWY 200</b><br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 25-35 mph<br>Start Date: 7/27/2026 7:00 PM<br>End Date: &nbsp;&nbsp;8/1/2026 7:00 AM<br><p><b>Additional Information:</b><br>Epoxy Striping operation at nights from 6:00 PM to 6:00 AM</p>","mrm":0.75,"category":"cnstr","report":"The following road construction project is in progress: from 7:00 PM Monday, July 27, 2026 road construction with flaggers, lane closures, pilot car, and speed limit 25 to 35 mph until 7:00 AM Saturday, August 1, 2026.<br />Epoxy Striping operation at nights from 6:00 PM to 6:00 AM"},"id":"1101098","type":"Feature"},{"type":"Feature","id":"1101099","properties":{"label":"S-263<br />from MP 0.0 to 2.8","headline":"Road Work","route":"S-263","event_id":"1101099","location_description":"S-263 from MP 0.0 to 2.8","last_update":1784911041,"dir":"B","report":"The following road construction project is in progress: from 7:00 PM Monday, July 27, 2026 road construction with travel delay 10 mins, flaggers, lane closures, pilot car, and speed limit 25 to 35 mph until 7:00 AM Saturday, August 1, 2026.<br />Epoxy striping operation at night.","category":"cnstr","enhanced_report":"<b>S-263  from MP 0.0 to 2.8</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 25-35 mph<br>Start Date: 7/27/2026 7:00 PM<br>End Date: &nbsp;&nbsp;8/1/2026 7:00 AM<br><p><b>Additional Information:</b><br>Epoxy striping operation at night. </p>","mrm":1.39},"geometry":{"type":"Point","coordinates":["-114.06748090262","46.8874704304526"]}},{"id":"1101100","type":"Feature","geometry":{"coordinates":["-114.039479632982","46.8349264083995"],"type":"Point"},"properties":{"headline":"Road Work","route":"S RESERVE ST","label":"S RESERVE ST","last_update":1784910973,"location_description":"S RESERVE ST","event_id":"1101100","report":"The following road construction project is in progress: from 7:00 PM Monday, July 27, 2026 road construction with lane closures and detour until 7:00 AM Saturday, August 1, 2026.<br />Epoxy Striping operation at nights from 6:00 PM to 6:00 AM. Detours for road closures are 39th Street and Brooks St.","mrm":0.09,"enhanced_report":"<b>S RESERVE ST</b><br>Detour<br>Lane closures<br>Start Date: 7/27/2026 7:00 PM<br>End Date: &nbsp;&nbsp;8/1/2026 7:00 AM<br><p><b>Additional Information:</b><br>Epoxy Striping operation at nights from 6:00 PM to 6:00 AM. Detours for road closures are 39th Street and Brooks St.</p>","category":"cnstr"}},{"id":"1101137","type":"Feature","geometry":{"type":"Point","coordinates":["-113.703482180726","46.7451387336225"]},"properties":{"category":"cnstr","mrm":123.5,"enhanced_report":"<b>I-90  from MP 121.0 to 126.0</b><br>Left lane CLOSED<br>Speed Limit 55 mph<br>Start Date: 7/27/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/7/2026 5:00 PM<br><p><b>Additional Information:</b><br>Road work on I-90 eastbound and westbound from mile post 121 to 126. Expect left lane closures and reduced speeds while work is in progress. Median cable rail installation operations will take place Monday through Friday.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mtcr/\" target=\"_blank\"><i>Website</i></a></p>","url":"https://www.mdt.mt.gov/pubinvolve/mtcr/","report":"The following road construction project is in progress: from 7:00 AM Monday, July 27, 2026 road construction with speed limit 55 mph and left lane closed until 5:00 PM Friday, August 7, 2026.<br />Road work on I-90 eastbound and westbound from mile post 121 to 126. Expect left lane closures and reduced speeds while work is in progress. Median cable rail installation operations will take place Monday through Friday.","event_id":"1101137","last_update":1784843290,"dir":"B","location_description":"I-90 from MP 121.0 to 126.0","label":"I-90<br />from MP 121.0 to 126.0","route":"I-90","headline":"Road Work"}},{"geometry":{"coordinates":["-111.981188711346","47.0592291662266"],"type":"Point"},"properties":{"category":"cnstr","mrm":232.95,"enhanced_report":"<b>I-15  from MP 229.1 to 236.8</b><br>Lane closures<br>Speed Limit 35-45 mph<br>Start Date: 7/27/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/13/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB and SB single lane closures with reduced speed. Crack sealing and bridge deck work ongoing in SB and NB lanes.</p>","report":"The following road construction project is in progress: from 6:00 AM Monday, July 27, 2026 road construction with speed limit 35 to 45 mph and lane closures until 7:00 PM Sunday, September 13, 2026.<br />NB and SB single lane closures with reduced speed. Crack sealing and bridge deck work ongoing in SB and NB lanes.","event_id":"1101150","dir":"B","last_update":1784899771,"location_description":"I-15 from MP 229.1 to 236.8","label":"I-15<br />from MP 229.1 to 236.8","headline":"Road Work","route":"I-15"},"id":"1101150","type":"Feature"},{"id":"1101174","type":"Feature","geometry":{"coordinates":["-109.058384348944","47.3335646116631"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: from 7:00 AM Monday, July 27, 2026 road construction until 5:00 PM Wednesday, July 29, 2026.<br />Crews will be on site installing roadside delineators. The operation will be mobile. Use caution.","enhanced_report":"<b>US-191  from MP 26.0 to 35.0</b><br>Start Date: 7/27/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Crews will be on site installing roadside delineators. The operation will be mobile. Use caution.</p>","mrm":30.5,"category":"cnstr","route":"US-191","headline":"Road Work","label":"US-191<br />from MP 26.0 to 35.0","location_description":"US-191 from MP 26.0 to 35.0","last_update":1784927995,"dir":"B","event_id":"1101174"}},{"type":"Feature","id":"674876","properties":{"url":"https://mdt.mt.gov/pubinvolve/reservedrive/","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until 9:00 PM Saturday, September 12, 2026.<br />Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.","mrm":0.67,"enhanced_report":"<b>S-548  from MP 0.0 to 1.3</b><br>Travel Delay 15 mins<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;9/12/2026 9:00 PM<br><p><b>Additional Information:</b><br>Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.\n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","category":"cnstr","route":"S-548","headline":"Road Work","label":"S-548<br />from MP 0.0 to 1.3","last_update":1784152239,"dir":"B","location_description":"S-548 from MP 0.0 to 1.3","event_id":"674876"},"geometry":{"coordinates":["-114.316351281891","48.2402973712819"],"type":"Point"}},{"type":"Feature","id":"882549","properties":{"report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, speed limit 35 mph, and width limit 12 ft until further notice.<br />Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends.","category":"cnstr","mrm":26.1,"enhanced_report":"<b>MT-86  from MP 24.1 to 28.1</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/5/2025 7:00 AM<br><p><b>Additional Information:</b><br>Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends. </p>","label":"MT-86<br />from MP 24.1 to 28.1","route":"MT-86","headline":"Road Work","event_id":"882549","dir":"B","last_update":1751314119,"location_description":"MT-86 from MP 24.1 to 28.1"},"geometry":{"coordinates":["-110.853240715469","45.9529996350098"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-114.117517413352","48.0920991659472"]},"properties":{"label":"MT-82<br />from MP 4.5 to 6.9","headline":"Road Work","route":"MT-82","event_id":"885957","location_description":"MT-82 from MP 4.5 to 6.9","dir":"B","last_update":1783956700,"report":"The following road construction project is in progress: road construction with flaggers, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 30, 2027.<br />Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours.","url":"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx","category":"cnstr","enhanced_report":"<b>MT-82  from MP 4.5 to 6.9</b><br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 8/4/2025 8:00 AM<br>End Date: &nbsp;&nbsp;10/30/2027 5:00 PM<br><p><b>Additional Information:</b><br>Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours. \n\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","mrm":5.7},"id":"885957","type":"Feature"},{"id":"886173","type":"Feature","geometry":{"type":"Point","coordinates":["-112.703557323067","45.5258384721225"]},"properties":{"category":"cnstr","mrm":22.45,"enhanced_report":"<b>N HIGHWAY 91</b><br>ROAD CLOSED<br>Start Date: 10/22/2024 2:40 PM<br><p><b>Additional Information:</b><br>MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.</p>","report":"The following road construction project is in progress: road closed until further notice.<br />MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.","event_id":"886173","last_update":1754947373,"location_description":"N HIGHWAY 91","label":"N HIGHWAY 91","headline":"Road Work","route":"N HIGHWAY 91"}},{"properties":{"location_description":"S-292 from MP 0.0 to 2.6","dir":"B","last_update":1784152224,"event_id":"887347","route":"S-292","headline":"Road Work","label":"S-292<br />from MP 0.0 to 2.6","enhanced_report":"<b>S-292  from MP 0.0 to 2.6</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2025 7:00 AM<br>End Date: &nbsp;&nbsp;9/12/2026 9:00 PM<br><p><b>Additional Information:</b><br> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","mrm":1.28,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until 9:00 PM Saturday, September 12, 2026.<br /> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time.","url":"https://mdt.mt.gov/pubinvolve/reservedrive/"},"geometry":{"coordinates":["-114.308729957856","48.2591177007456"],"type":"Point"},"type":"Feature","id":"887347"},{"geometry":{"type":"Point","coordinates":["-104.592468238838","47.7030562308994"]},"properties":{"label":"MT-200<br />from MP 51.0 to 52.0","headline":"Road Work","route":"MT-200","event_id":"912666","location_description":"MT-200 from MP 51.0 to 52.0","dir":"B","last_update":1782401778,"report":"The following road construction project is in progress: road construction with speed limit 35 to 55 mph and travel delay 10 mins until further notice.<br />Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations are completed.","category":"cnstr","enhanced_report":"<b>MT-200  from MP 51.0 to 52.0</b><br>Travel Delay 10 mins<br>Speed Limit 35-55 mph<br>Start Date: 11/21/2025 3:13 PM<br><p><b>Additional Information:</b><br>Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations are completed.</p>","mrm":51.5},"id":"912666","type":"Feature"},{"type":"Feature","id":"954771","properties":{"label":"MT-200<br />from MP 246.8 to 253.5","route":"MT-200","headline":"Road Work","event_id":"954771","dir":"B","last_update":1766029889,"location_description":"MT-200 from MP 246.8 to 253.5","report":"The following road construction project is in progress: road construction with width limit 14 ft and speed limit 35 mph until further notice.<br />CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH","category":"cnstr","mrm":250.15,"enhanced_report":"<b>MT-200  from MP 246.8 to 253.5</b><br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 12/17/2025 8:46 PM<br><p><b>Additional Information:</b><br>CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH </p>"},"geometry":{"coordinates":["-106.138792009437","47.3255728190287"],"type":"Point"}}]}