{"features":[{"properties":{"event_id":"1072371","dir":"B","location_description":"US-89 from MP 34.3 to 40.6","mrm":37.45,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until further notice.<br />M.A. DeAtley is finishing up final ditch grading and placement of topsoil.\nMontana Fence is on site installing new fencing along R/W.\nPoteet will also have a signing crew to install new signs following the topsoil operation.\nNew Bridge is open to traffic. During work hours traffic will be controlled by temporary traffic signals and pilot cars.\nWork hours are tentatively M-F 7:00 AM to 5:30 PM","enhanced_report":"<b>US-89  from MP 34.3 to 40.6</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 3/19/2026 2:14 PM<br><p><b>Additional Information:</b><br>M.A. DeAtley is finishing up final ditch grading and placement of topsoil.\nMontana Fence is on site installing new fencing along R/W.\nPoteet will also have a signing crew to install new signs following the topsoil operation.\nNew Bridge is open to traffic. During work hours traffic will be controlled by temporary traffic signals and pilot cars.\nWork hours are tentatively M-F 7:00 AM to 5:30 PM\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","headline":"Road Work","label":"US-89<br />from MP 34.3 to 40.6","url":"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx","last_update":1793036972,"route":"US-89","category":"cnstr"},"id":"1072371","type":"Feature","geometry":{"coordinates":["-112.141252755761","47.7663722839213"],"type":"Point"}},{"type":"Feature","geometry":{"type":"Point","coordinates":["-113.88390997677","47.958308153158"]},"id":"1073251","properties":{"enhanced_report":"<b>MT-83  from MP 70.5 to 78.5</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 25 mph<br>Width Limit  16 feet<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/13/2026 6:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas. \n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt83bridges/\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, pilot car, signal lights, speed limit 25 mph, and width limit 16 ft until 6:00 PM Friday, November 13, 2026.<br />The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek. Work is dependent on weather and other factors, and includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas.","category":"cnstr","last_update":1793394588,"route":"MT-83","label":"MT-83<br />from MP 70.5 to 78.5","url":"https://www.mdt.mt.gov/pubinvolve/mt83bridges/","headline":"Road Work","location_description":"MT-83 from MP 70.5 to 78.5","event_id":"1073251","dir":"B","mrm":74.5}},{"id":"1080144","properties":{"dir":"N","event_id":"1080144","location_description":"MT-16 from MP 28.9 to 37.5","mrm":33.2,"enhanced_report":"<b>MT-16 NB from MP 28.9 to 37.5</b><br>Start Date: 3/30/2026 7:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Watch for shoulder work until 12/01/2026</p>","report":"The following road construction project is in progress: road construction northbound until 5:00 PM Tuesday, December 1, 2026.<br />Watch for shoulder work until 12/01/2026","label":"MT-16<br />from MP 28.9 to 37.5","headline":"Road Work","category":"cnstr","route":"MT-16","last_update":1792090175},"geometry":{"type":"Point","coordinates":["-104.343020312928","47.4714193988865"]},"type":"Feature"},{"geometry":{"type":"Point","coordinates":["-105.995986426994","47.3213564526461"]},"type":"Feature","id":"1084419","properties":{"category":"cnstr","route":"MT-200","last_update":1785430987,"url":"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/","label":"MT-200<br />from MP 253.5 to 260.2","headline":"Road Work","report":"The following road construction project is in progress: road construction with travel delay 15 mins, pilot car, signal lights, speed limit 35 mph, and width limit 14 ft until 6:00 PM Sunday, November 15, 2026.<br />Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.","enhanced_report":"<b>MT-200  from MP 253.5 to 260.2</b><br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 4/1/2026 3:04 PM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/\" target=\"_blank\"><i>Website</i></a></p>","mrm":256.85,"location_description":"MT-200 from MP 253.5 to 260.2","event_id":"1084419","dir":"B"}},{"geometry":{"type":"Point","coordinates":["-107.142506718359","46.4634120172561"]},"type":"Feature","properties":{"route":"US-12","last_update":1785432924,"category":"cnstr","headline":"Road Work","label":"US-12<br />from MP 228.0 to 260.0","url":"https://mdt.mt.gov/pubinvolve/forsythbridges/","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, detour, flaggers, lane closures, speed limit 25 mph, and width limit 14 ft until 5:00 PM Friday, December 11, 2026.<br />The road will contain loose gravel. 14' Width Restriction.","enhanced_report":"<b>US-12  from MP 228.0 to 260.0</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Detour<br>Flaggers<br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/2/2026 7:48 AM<br>End Date: &nbsp;&nbsp;12/11/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road will contain loose gravel.  14' Width Restriction.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/forsythbridges/\" target=\"_blank\"><i>Website</i></a></p>","mrm":244,"location_description":"US-12 from MP 228.0 to 260.0","dir":"B","event_id":"1085227"},"id":"1085227"},{"geometry":{"coordinates":["-112.123169171667","46.9250655070607"],"type":"Point"},"type":"Feature","id":"1088646","properties":{"mrm":219.6,"location_description":"I-15 from MP 217.5 to 221.7","dir":"B","event_id":"1088646","category":"cnstr","route":"I-15","last_update":1793280484,"url":"https://mdt.mt.gov/pubinvolve/i15sieben/","label":"I-15<br />from MP 217.5 to 221.7","headline":"Road Work","enhanced_report":"<b>I-15  from MP 217.5 to 221.7</b><br>Lane closures<br>Speed Limit 45-55 mph<br>Length Limit  95 feet<br>Width Limit  12 feet<br>Start Date: 4/13/2026 5:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB and SB single lane closures with reduced speed. A 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n \nLoads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\n\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/i15sieben/\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with lane closures, length limit 95 ft, speed limit 45 to 55 mph, and width limit 12 ft until 7:00 PM Sunday, November 15, 2026.<br />NB and SB single lane closures with reduced speed. A 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n \nLoads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\n\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday."}},{"properties":{"mrm":66.25,"location_description":"I-90 from MP 66.1 to 66.4","dir":"B","event_id":"1089372","route":"I-90","last_update":1792674068,"category":"cnstr","headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/i90alberton/","label":"I-90<br />from MP 66.1 to 66.4","report":"The following road construction project is in progress: road construction until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n at approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the westbound I-90 bridge over Old Hwy 10.","enhanced_report":"<b>I-90  from MP 66.1 to 66.4</b><br>Start Date: 4/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n at approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the westbound I-90 bridge over Old Hwy 10.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90alberton/\" target=\"_blank\"><i>Website</i></a></p>"},"id":"1089372","geometry":{"coordinates":["-114.659148050516","47.0192496448387"],"type":"Point"},"type":"Feature"},{"geometry":{"coordinates":["-115.661019640764","47.4353615400145"],"type":"Point"},"type":"Feature","id":"1089837","properties":{"enhanced_report":"<b>I-90  from MP 0.0 to 5.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Median crossover detours<br>Speed Limit 35-55 mph<br>Width Limit  13 feet<br>Start Date: 4/8/2026 10:28 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting  6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-822-2072\n\n</p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, median crossover detours, speed limit 35 to 55 mph, and width limit 13 ft until 7:00 PM Monday, November 16, 2026.<br />East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting 6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-822-2072","headline":"Road Work","label":"I-90<br />from MP 0.0 to 5.0","last_update":1786634695,"route":"I-90","category":"cnstr","event_id":"1089837","dir":"B","location_description":"I-90 from MP 0.0 to 5.0","mrm":2.5}},{"properties":{"mrm":0.11,"location_description":"CENTENNIAL AVE","event_id":"1090108","route":"CENTENNIAL AVE","last_update":1782247778,"category":"cnstr","headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","label":"CENTENNIAL AVE","report":"The following road construction project is in progress: road construction with lane closures and detour until 4:00 PM Tuesday, December 1, 2026.<br />Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd. Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection. Closure expected to continue through July.","enhanced_report":"<b>CENTENNIAL AVE</b><br>Detour<br>Lane closures<br>Start Date: 4/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;12/1/2026 4:00 PM<br><p><b>Additional Information:</b><br>Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd.  Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection.  Closure expected to continue through July.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>"},"id":"1090108","type":"Feature","geometry":{"type":"Point","coordinates":["-112.560568877555","45.9987575811237"]}},{"properties":{"mrm":131.35,"event_id":"1090189","dir":"B","location_description":"US-93 from MP 129.7 to 133.0","label":"US-93<br />from MP 129.7 to 133.0","headline":"Road Work","category":"cnstr","last_update":1793108090,"route":"US-93","enhanced_report":"<b>US-93  from MP 129.7 to 133.0</b><br>Motorcycles consider alternate route<br>Travel Delay 20 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/27/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction Crews will be working daily 7:30am to 9:00pm, weather and other unforeseen circumstances permitting. Workers and equipment will also be present for longer duration when weather and temperatures allow. Outside of planned closures; drivers should expect single-lane traffic with signals, pilot cars, flaggers during operation hours, reduced speeds and up to 20-minute delays.</p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 20 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, November 27, 2026.<br />Construction Crews will be working daily 7:30am to 9:00pm, weather and other unforeseen circumstances permitting. Workers and equipment will also be present for longer duration when weather and temperatures allow. Outside of planned closures; drivers should expect single-lane traffic with signals, pilot cars, flaggers during operation hours, reduced speeds and up to 20-minute delays."},"id":"1090189","type":"Feature","geometry":{"coordinates":["-114.405796224872","48.40363902689"],"type":"Point"}},{"id":"1093845","properties":{"mrm":0.6,"event_id":"1093845","location_description":"W MAIN ST","headline":"Road Work","label":"W MAIN ST","route":"W MAIN ST","last_update":1794261625,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 5 mins, flaggers, lane closures, and speed limit 25 to 35 mph until 6:00 PM Friday, November 13, 2026.<br />Final electrical work in progress. 1st Avenue and Main Street Intersection will be controlled by flaggers on November 10th. \nSignal Lights will be Flashing Red until 11/10 AM. \nWatch for lane closures, flaggers, workers, and equipment. Expect 5 to 10 minute delays.","enhanced_report":"<b>W MAIN ST</b><br>Travel Delay 5 mins<br>Flaggers<br>Lane closures<br>Speed Limit 25-35 mph<br>Start Date: 6/22/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/13/2026 6:00 PM<br><p><b>Additional Information:</b><br>Final electrical work in progress. 1st Avenue and Main Street Intersection will be controlled by flaggers on November 10th. \nSignal Lights will be Flashing Red until 11/10 AM.  \nWatch for lane closures, flaggers, workers, and equipment. Expect 5 to 10 minute delays.\n</p>"},"geometry":{"type":"Point","coordinates":["-108.784068432114","45.668307236238"]},"type":"Feature"},{"properties":{"mrm":189.85,"location_description":"I-94 from MP 187.1 to 192.6","dir":"B","event_id":"1096893","last_update":1790791617,"route":"I-94","category":"cnstr","headline":"Road Work","label":"I-94<br />from MP 187.1 to 192.6","report":"The following road construction project is in progress: road construction until 8:00 PM Sunday, November 15, 2026.<br />Watch for construction signs and shoulder roadwork till Winter 2026","enhanced_report":"<b>I-94  from MP 187.1 to 192.6</b><br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 8:00 PM<br><p><b>Additional Information:</b><br>Watch for construction signs and shoulder roadwork till Winter 2026\n\n\n</p>"},"id":"1096893","type":"Feature","geometry":{"coordinates":["-105.067999357911","46.8808194421691"],"type":"Point"}},{"id":"1098028","properties":{"event_id":"1098028","dir":"B","location_description":"S-279 from MP 0.6 to 1.3","mrm":0.95,"enhanced_report":"<b>S-279  from MP 0.6 to 1.3</b><br>Start Date: 5/18/2026 12:00 PM<br>End Date: &nbsp;&nbsp;1/8/2027 6:00 PM<br><p><b>Additional Information:</b><br>Road Construction at the Lincoln Rd and Applegate Dr Intersection.  \nMiscellaneous activities occurring off the roadway and will not impede traffic.  New lighting expected to occur during the week of January 4, 2027.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction until 6:00 PM Friday, January 8, 2027.<br />Road Construction at the Lincoln Rd and Applegate Dr Intersection. \nMiscellaneous activities occurring off the roadway and will not impede traffic. New lighting expected to occur during the week of January 4, 2027.","headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/","label":"S-279<br />from MP 0.6 to 1.3","last_update":1792773300,"route":"S-279","category":"cnstr"},"type":"Feature","geometry":{"coordinates":["-112.039365455286","46.7043615487372"],"type":"Point"}},{"properties":{"category":"cnstr","last_update":1788271871,"route":"S-482","label":"S-482<br />from MP 2.5 to 2.7","headline":"Road Work","report":"The following road construction project is in progress: road closed until 5:00 PM Friday, May 28, 2027.<br />S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure.","enhanced_report":"<b>S-482  from MP 2.5 to 2.7</b><br>ROAD CLOSED<br>Start Date: 7/21/2026 10:03 AM<br>End Date: &nbsp;&nbsp;5/28/2027 5:00 PM<br><p><b>Additional Information:</b><br>S-482 is closed MP2.5 to MP2.7 for construction of new bridge structure. </p>","mrm":2.6,"location_description":"S-482 from MP 2.5 to 2.7","event_id":"1101007","dir":"B"},"id":"1101007","geometry":{"type":"Point","coordinates":["-115.505364972791","48.3146911708432"]},"type":"Feature"},{"properties":{"event_id":"1101584","location_description":"2nd Street East","mrm":0,"report":"The following road construction project is in progress: road closed with detour until 6:00 PM Friday, August 6, 2027.<br />A Road Closure and Detour for the intersection of 2nd St E/Conrad Drive and Woodland Avenue is in place: Woodland Ave closed at the intersection of Woodland Ave and 4th St E to the north to E Center St and 5th Ave E; \nConrad Drive closed at the intersection of Conrad Drive and Woodland Park Dr. to the east to the intersection of 2nd St E and 5th Ave E. \n*Detour signs and barricades are in place to direct you around the work zone. \n** Watch for workers and equipment exiting the project. \n** Please plan your travel for additional time around the detour and construction site.","enhanced_report":"<b>2nd Street East</b><br>Detour<br>ROAD CLOSED<br>Start Date: 8/10/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/6/2027 6:00 PM<br><p><b>Additional Information:</b><br>A Road Closure and Detour for the intersection of 2nd St E/Conrad Drive and Woodland Avenue is in place: Woodland Ave closed at the intersection of Woodland Ave and 4th St E to the north to E Center St and 5th Ave E; \nConrad Drive closed at the intersection of Conrad Drive and Woodland Park Dr. to the east to the intersection of 2nd St E and 5th Ave E. \n*Detour signs and barricades are in place to direct you around the work zone. \n** Watch for workers and equipment exiting the project. \n** Please plan your travel for additional time around the detour and construction site.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/woodland/\" target=\"_blank\"><i>Website</i></a></p>","label":"2nd Street East","url":"https://www.mdt.mt.gov/pubinvolve/woodland/","headline":"Road Work","category":"cnstr","last_update":1789053168,"route":"2nd Street East"},"id":"1101584","geometry":{"type":"Point","coordinates":["-114.303724207085","48.1983763142226"]},"type":"Feature"},{"properties":{"mrm":98,"location_description":"US-93 from MP 97.5 to 98.5","dir":"B","event_id":"1101693","category":"cnstr","route":"US-93","last_update":1792671645,"url":"https://rpa-eng.com/ongoing-projects/lcwsd-collections/ [rpa-eng.com]","label":"US-93<br />from MP 97.5 to 98.5","headline":"Road Work","enhanced_report":"<b>US-93  from MP 97.5 to 98.5</b><br>Travel Delay 10 mins<br>Lane closures<br>Speed Limit 30-35 mph<br>Width Limit  12 feet<br>Start Date: 8/11/2026 12:00 PM<br>End Date: &nbsp;&nbsp;11/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>**12 FOOT WIDTH RESTRICTION ** Sewer replacement construction will begin along US 93 S in Lakeside from the Intersection of Bierney Creek Rd to the intersection of Stoner Loop. This will involve closures of the shoulder and southbound lane, shifting traffic into the turning lane but maintaining south and northbound traffic along US 93. Traffic control will only consist of 200-300 FT of lane shift at one time. Local traffic affected by intersecting roads will be detoured to the next available intersection. </p><p><a href=\"https://rpa-eng.com/ongoing-projects/lcwsd-collections/ [rpa-eng.com]\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with travel delay 10 mins, lane closures, speed limit 30 to 35 mph, and width limit 12 ft until 5:00 PM Monday, November 30, 2026.<br />**12 FOOT WIDTH RESTRICTION ** Sewer replacement construction will begin along US 93 S in Lakeside from the Intersection of Bierney Creek Rd to the intersection of Stoner Loop. This will involve closures of the shoulder and southbound lane, shifting traffic into the turning lane but maintaining south and northbound traffic along US 93. Traffic control will only consist of 200-300 FT of lane shift at one time. Local traffic affected by intersecting roads will be detoured to the next available intersection."},"id":"1101693","type":"Feature","geometry":{"coordinates":["-114.224673998474","48.0184823676727"],"type":"Point"}},{"id":"1101749","properties":{"enhanced_report":"<b>MT-24 NB from MP 59.6 to 73.3</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 8/12/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/10/2026 12:00 PM<br><p><b>Additional Information:</b><br> 35 mph work zones with shoulder work, culvert work and milling with pilot car and flaggers.  Will be tentatively working 7 am to 7 pm Mon-Fri. </p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph northbound until 12:00 PM Tuesday, November 10, 2026.<br /> 35 mph work zones with shoulder work, culvert work and milling with pilot car and flaggers. Will be tentatively working 7 am to 7 pm Mon-Fri.","headline":"Road Work","label":"MT-24<br />from MP 59.6 to 73.3","last_update":1788352976,"route":"MT-24","category":"cnstr","dir":"N","event_id":"1101749","location_description":"MT-24 from MP 59.6 to 73.3","mrm":66.45},"geometry":{"type":"Point","coordinates":["-106.595024672639","48.0715672010113"]},"type":"Feature"},{"geometry":{"type":"Point","coordinates":["-109.175639030411","45.1580789732733"]},"type":"Feature","properties":{"report":"The following road construction project is in progress: road construction with speed limit 35 mph until 5:00 PM Monday, November 23, 2026.<br />Slide excavation work in progress. Watch for workers, and equipment along the highway west of Bearcreek.","enhanced_report":"<b>S-308  from MP 5.5 to 5.7</b><br>Speed Limit 35 mph<br>Start Date: 8/24/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/23/2026 5:00 PM<br><p><b>Additional Information:</b><br>Slide excavation work in progress. Watch for workers, and equipment along the highway west of Bearcreek.\n</p>","headline":"Road Work","label":"S-308<br />from MP 5.5 to 5.7","last_update":1790088730,"route":"S-308","category":"cnstr","dir":"B","event_id":"1102043","location_description":"S-308 from MP 5.5 to 5.7","mrm":5.6},"id":"1102043"},{"properties":{"category":"cnstr","route":"MT-81","last_update":1792420683,"url":"http://mdt.mt.gov/pubinvolve/lewistownbridges","label":"MT-81<br />from MP 34.4 to 35.4","headline":"Road Work","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, and speed limit 35 mph until 5:00 PM Saturday, December 19, 2026.<br />Traffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.","enhanced_report":"<b>MT-81  from MP 34.4 to 35.4</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 6/5/2026 8:00 AM<br>End Date: &nbsp;&nbsp;12/19/2026 5:00 PM<br><p><b>Additional Information:</b><br>Traffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","mrm":34.9,"location_description":"MT-81 from MP 34.4 to 35.4","dir":"B","event_id":"1102738"},"id":"1102738","geometry":{"type":"Point","coordinates":["-109.533267332379","47.2261729694507"]},"type":"Feature"},{"properties":{"location_description":"MT-81 from MP 36.1 to 37.1","event_id":"1102748","dir":"B","mrm":36.6,"enhanced_report":"<b>MT-81  from MP 36.1 to 37.1</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 6/5/2026 2:18 PM<br>End Date: &nbsp;&nbsp;12/19/2026 5:00 PM<br><p><b>Additional Information:</b><br>\nTraffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.\n</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, and speed limit 35 mph until 5:00 PM Saturday, December 19, 2026.<br />\nTraffic is on a gravel surface in existing alignment. Expect flaggers to be on site as needed when road work resumes.","route":"MT-81","last_update":1792420272,"category":"cnstr","headline":"Road Work","url":"http://mdt.mt.gov/pubinvolve/lewistownbridges","label":"MT-81<br />from MP 36.1 to 37.1"},"id":"1102748","type":"Feature","geometry":{"coordinates":["-109.50657094979","47.2119688165491"],"type":"Point"}},{"type":"Feature","geometry":{"coordinates":["-109.822393326701","47.2860033702529"],"type":"Point"},"properties":{"location_description":"MT-81 from MP 19.4 to 20.4","dir":"B","event_id":"1102769","mrm":19.9,"enhanced_report":"<b>MT-81  from MP 19.4 to 20.4</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Gross Weight Limit  72000 lbs<br>Width Limit  24 feet<br>Start Date: 9/15/2026 7:54 AM<br><p><b>Additional Information:</b><br>Traffic is on a Detour at the bridge replacement site.  Expect flaggers to be on site as needed for road work at connections.</p><p><a href=\"http://mdt.mt.gov/pubinvolve/lewistownbridges\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, gross weight limit 72000 lbs, lane closures, pilot car, speed limit 35 mph, and width limit 24 ft until further notice.<br />Traffic is on a Detour at the bridge replacement site. Expect flaggers to be on site as needed for road work at connections.","last_update":1789569693,"route":"MT-81","category":"cnstr","headline":"Road Work","label":"MT-81<br />from MP 19.4 to 20.4","url":"http://mdt.mt.gov/pubinvolve/lewistownbridges"},"id":"1102769"},{"geometry":{"type":"Point","coordinates":["-104.374763641794","45.6137433321804"]},"type":"Feature","id":"1103001","properties":{"location_description":"S-323 from MP 22.0 to 24.0","event_id":"1103001","dir":"B","mrm":23,"report":"The following road construction project is in progress: road construction with travel delay 10 mins, lane closures, speed limit 35 mph, and width limit 16 ft until 7:00 PM Friday, November 20, 2026.<br />ALTERNATING ONE LANE TRAFFIC DUE TO CULVERT REPLACEMENT; PREPARE TO STOP; EXPECT DELAYS; STEEP SHOULDERS IN AREA OF PROJECT, USE CAUTION","enhanced_report":"<b>S-323  from MP 22.0 to 24.0</b><br>Travel Delay 10 mins<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 9/22/2026 10:14 AM<br>End Date: &nbsp;&nbsp;11/20/2026 7:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING ONE LANE TRAFFIC DUE TO CULVERT REPLACEMENT; PREPARE TO STOP; EXPECT DELAYS; STEEP SHOULDERS IN AREA OF PROJECT, USE CAUTION</p>","category":"cnstr","route":"S-323","last_update":1790180368,"label":"S-323<br />from MP 22.0 to 24.0","headline":"Road Work"}},{"id":"1106405","properties":{"enhanced_report":"<b>I-94  from MP 169.8 to 186.8</b><br>Speed Limit 80/70 mph<br>Start Date: 10/15/2026 12:58 PM<br>End Date: &nbsp;&nbsp;1/1/2027 12:00 AM<br><p><b>Additional Information:</b><br>Terry area fencing taking place in east and west bound lanes. Watch for vehicles and equipment on or near shoulders of driving lanes. Watch for vehicles entering/exiting Interstate from shoulders.</p>","report":"The following road construction project is in progress: road construction with speed limit 80 mph until 12:00 AM Friday, January 1, 2027.<br />Terry area fencing taking place in east and west bound lanes. Watch for vehicles and equipment on or near shoulders of driving lanes. Watch for vehicles entering/exiting Interstate from shoulders.","label":"I-94<br />from MP 169.8 to 186.8","headline":"Road Work","category":"cnstr","route":"I-94","last_update":1792090995,"dir":"B","event_id":"1106405","location_description":"I-94 from MP 169.8 to 186.8","mrm":178.3},"geometry":{"type":"Point","coordinates":["-105.269537464494","46.7944176297426"]},"type":"Feature"},{"geometry":{"type":"Point","coordinates":["-114.568629478047","47.0042981373562"]},"type":"Feature","properties":{"enhanced_report":"<b>I-90  from MP 69.5 to 71.7</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 11/2/2026 8:00 AM<br><p><b>Additional Information:</b><br>Bridge replacement across the Clark Fork River including grading and plant mix Bituminous surfacing and crossovers on the Cyr Interchange Structure project in Mineral County, west of Alberton. The project is located on westbound I-90 from approximately RP 69.5 to 71.7. Work involves removing and replacing the existing westbound I-90 bridge over the Clark Fork River. \nDuring the week of November 2, crews will begin building crossovers to accommodate two-way traffic on the eastbound side of the interstate while the new bridge is being constructed. Motorists should expect single-lane closures while the crossovers are being built.\n</p>","report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />Bridge replacement across the Clark Fork River including grading and plant mix Bituminous surfacing and crossovers on the Cyr Interchange Structure project in Mineral County, west of Alberton. The project is located on westbound I-90 from approximately RP 69.5 to 71.7. Work involves removing and replacing the existing westbound I-90 bridge over the Clark Fork River. \nDuring the week of November 2, crews will begin building crossovers to accommodate two-way traffic on the eastbound side of the interstate while the new bridge is being constructed. Motorists should expect single-lane closures while the crossovers are being built.","headline":"Road Work","label":"I-90<br />from MP 69.5 to 71.7","route":"I-90","last_update":1793636984,"category":"cnstr","event_id":"1110244","dir":"B","location_description":"I-90 from MP 69.5 to 71.7","mrm":70.6},"id":"1110244"},{"id":"1110357","properties":{"dir":"B","event_id":"1110357","location_description":"US-310 from MP 25.7 to 26.2","mrm":25.96,"report":"The following road construction project is in progress: road construction until 5:00 PM Friday, November 13, 2026.<br />Sidewalk work in progress. Watch for workers and equipment in the town of Bridger. Posted speed limit of 25mph.","enhanced_report":"<b>US-310  from MP 25.7 to 26.2</b><br>Start Date: 11/3/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/13/2026 5:00 PM<br><p><b>Additional Information:</b><br>Sidewalk work in progress. Watch for workers and equipment in the town of Bridger. Posted speed limit of 25mph.</p>","label":"US-310<br />from MP 25.7 to 26.2","headline":"Road Work","category":"cnstr","route":"US-310","last_update":1793653199},"geometry":{"type":"Point","coordinates":["-108.914130986081","45.2930384618933"]},"type":"Feature"},{"id":"1110684","properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, and speed limit 35 mph until 5:00 PM Monday, November 23, 2026.<br />The Montana Department of Transportation (MDT) and Schellinger Construction will install guardrail at the U.S. Highway 93 (US 93) and Legacy Park Way intersection from November 9th through November 23rd, weather and other unforeseen factors permitting.\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\nThis project will improve access and enhance safety in the area.\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project.","enhanced_report":"<b>US-93  at MP 94.7</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 11/9/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/23/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) and Schellinger Construction will install guardrail at the U.S. Highway 93 (US 93) and Legacy Park Way intersection from November 9th through November 23rd, weather and other unforeseen factors permitting.\nCrews will be working Monday through Friday from 7 a.m. to 7 p.m. During construction, motorists should expect single-lane traffic, temporary traffic signals, and reduced speed limits. Please follow all posted signage and watch for workers.\nThis project will improve access and enhance safety in the area.\nThe public is encouraged to contact MDT Public Involvement by calling 406-444-6274 or emailing mdtprojectpi@mt.gov with questions or comments about the project.\n\n</p>","category":"cnstr","route":"US-93","last_update":1793903228,"label":"US-93<br />at MP 94.7","headline":"Road Work","location_description":"US-93 at MP 94.7","dir":"B","event_id":"1110684","mrm":94.68},"type":"Feature","geometry":{"coordinates":["-114.199086690856","47.976693010799"],"type":"Point"}},{"type":"Feature","geometry":{"type":"Point","coordinates":["-107.49802201859","46.1400161454918"]},"properties":{"label":"I-94<br />from MP 49.5 to 51.0","headline":"Road Work","category":"cnstr","last_update":1793999503,"route":"I-94","enhanced_report":"<b>I-94 EB from MP 49.5 to 51.0</b><br>Travel Delay 35 mins<br>Lane closures<br>Width Limit  12 feet<br>Start Date: 11/9/2026 9:00 AM<br>End Date: &nbsp;&nbsp;11/13/2026 7:00 PM<br><p><b>Additional Information:</b><br>Wide loads will be staged and will be escorted through when workers are clear of the travel lane and do not interfere with the passage of oversize loads.</p>","report":"The following road construction project is in progress: road construction with travel delay 35 mins, lane closures, and width limit 12 ft eastbound until 7:00 PM Friday, November 13, 2026.<br />Wide loads will be staged and will be escorted through when workers are clear of the travel lane and do not interfere with the passage of oversize loads.","mrm":50.25,"event_id":"1110771","dir":"E","location_description":"I-94 from MP 49.5 to 51.0"},"id":"1110771"},{"id":"1111761","properties":{"route":"US-87","last_update":1794238302,"category":"cnstr","headline":"Road Work","label":"US-87<br />from MP 88.0 to 96.0","enhanced_report":"<b>US-87  from MP 88.0 to 96.0</b><br>Flaggers<br>Pilot vehicles<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 11/9/2026 8:27 AM<br>End Date: &nbsp;&nbsp;11/13/2026 5:00 PM<br><p><b>Additional Information:</b><br>Alternating Traffic</p>","report":"The following road construction project is in progress: road construction with flaggers, pilot car, speed limit 35 mph, and width limit 12 ft until 5:00 PM Friday, November 13, 2026.<br />Alternating Traffic","mrm":92,"location_description":"US-87 from MP 88.0 to 96.0","dir":"B","event_id":"1111761"},"geometry":{"coordinates":["-109.235371992882","47.0705853624548"],"type":"Point"},"type":"Feature"},{"type":"Feature","geometry":{"coordinates":["-114.081440777713","46.7421377191587"],"type":"Point"},"id":"1111779","properties":{"enhanced_report":"<b>US-93  from MP 81.5 to 83.3</b><br>Lane closures<br>Monday,Tuesday 8:00 am - 7:00 pm<br>Start Date: 11/9/2026 10:53 AM<br>End Date: &nbsp;&nbsp;11/10/2026 7:00 PM<br><p><b>Additional Information:</b><br>Alternating Lane Closures</p>","report":"The following road construction project is in progress: road construction with lane closures Monday through Tuesday between 8:00 AM and 7:00 PM until 7:00 PM Tuesday, November 10, 2026.<br />Alternating Lane Closures","last_update":1794246798,"route":"US-93","category":"cnstr","headline":"Road Work","label":"US-93<br />from MP 81.5 to 83.3","location_description":"US-93 from MP 81.5 to 83.3","dir":"B","event_id":"1111779","mrm":82.4}},{"type":"Feature","geometry":{"coordinates":["-112.869512725187","48.5738281940417"],"type":"Point"},"properties":{"dir":"B","event_id":"1112218","location_description":"US-2 from MP 229.0 to 230.0","mrm":229.5,"enhanced_report":"<b>US-2  from MP 229.0 to 230.0</b><br>Speed Limit 35 mph<br>Start Date: 11/9/2026 2:33 PM<br>End Date: &nbsp;&nbsp;11/10/2026 2:00 PM<br>","report":"The following road construction project is in progress: road construction with speed limit 35 mph until 2:00 PM Tuesday, November 10, 2026.","label":"US-2<br />from MP 229.0 to 230.0","headline":"Road Work","category":"cnstr","last_update":1794260037,"route":"US-2"},"id":"1112218"},{"geometry":{"coordinates":["-114.428756560059","46.9915408917661"],"type":"Point"},"type":"Feature","id":"1112330","properties":{"location_description":"I-90 from MP 72.0 to 85.0","dir":"E","event_id":"1112330","mrm":78.5,"enhanced_report":"<b>I-90 EB from MP 72.0 to 85.0</b><br>Start Date: 11/9/2026 3:35 PM<br><p><b>Additional Information:</b><br>Epoxy striping on the ramps </p>","report":"The following road construction project is in progress: road construction eastbound daily between 3:30 PM and 6:00 PM until further notice.<br />Epoxy striping on the ramps","category":"cnstr","last_update":1794263828,"route":"I-90","label":"I-90<br />from MP 72.0 to 85.0","headline":"Road Work"}},{"type":"Feature","geometry":{"coordinates":["-110.853240715469","45.9529996350098"],"type":"Point"},"properties":{"location_description":"MT-86 from MP 24.1 to 28.1","dir":"B","event_id":"882549","mrm":26.1,"enhanced_report":"<b>MT-86  from MP 24.1 to 28.1</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/5/2025 7:00 AM<br><p><b>Additional Information:</b><br>Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends. </p>","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, speed limit 35 mph, and width limit 12 ft until further notice.<br />Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends.","category":"cnstr","route":"MT-86","last_update":1751314119,"label":"MT-86<br />from MP 24.1 to 28.1","headline":"Road Work"},"id":"882549"},{"geometry":{"coordinates":["-114.117517413352","48.0920991659472"],"type":"Point"},"type":"Feature","properties":{"mrm":5.7,"location_description":"MT-82 from MP 4.5 to 6.9","event_id":"885957","dir":"B","category":"cnstr","route":"MT-82","last_update":1791406818,"label":"MT-82<br />from MP 4.5 to 6.9","url":"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx","headline":"Road Work","enhanced_report":"<b>MT-82  from MP 4.5 to 6.9</b><br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 10/2/2026 1:26 PM<br>End Date: &nbsp;&nbsp;10/30/2027 6:00 PM<br><p><b>Additional Information:</b><br>Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours. \n\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","report":"The following road construction project is in progress: road construction with flaggers, signal lights, and speed limit 35 mph until 6:00 PM Saturday, October 30, 2027.<br />Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours."},"id":"885957"},{"type":"Feature","geometry":{"coordinates":["-112.703557323067","45.5258384721225"],"type":"Point"},"id":"886173","properties":{"mrm":22.45,"location_description":"N HIGHWAY 91","event_id":"886173","category":"cnstr","last_update":1754947373,"route":"N HIGHWAY 91","label":"N HIGHWAY 91","headline":"Road Work","report":"The following road construction project is in progress: road closed until further notice.<br />MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.","enhanced_report":"<b>N HIGHWAY 91</b><br>ROAD CLOSED<br>Start Date: 10/22/2024 2:40 PM<br><p><b>Additional Information:</b><br>MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.</p>"}}],"type":"FeatureCollection"}