{"features":[{"geometry":{"coordinates":["-112.665967256596","45.5924838216279"],"type":"Point"},"properties":{"headline":"Road Work","label":"I-15<br />from MP 85.2 to 95.7","mrm":90.45,"report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />Temporary lane and shoulder closures will be in place throughout the duration of the project. Watch for construction equipment on the shoulder of the interstate.","location_description":"I-15 from MP 85.2 to 95.7","dir":"B","category":"cnstr","last_update":1771282541,"route":"I-15","event_id":"1025516","enhanced_report":"<b>I-15  from MP 85.2 to 95.7</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 2/17/2026 7:00 AM<br><p><b>Additional Information:</b><br>Temporary lane and shoulder closures will be in place throughout the duration of the project.  Watch for construction equipment on the shoulder of the interstate.</p>"},"id":"1025516","type":"Feature"},{"type":"Feature","id":"1037070","properties":{"route":"MT-21","last_update":1778764322,"enhanced_report":"<b>MT-21  from MP 0.7 to 20.9</b><br>Detour<br>ROAD CLOSED<br>Speed Limit 35 mph<br>Start Date: 3/2/2026 8:00 AM<br>End Date: &nbsp;&nbsp;9/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Road closure for MT-21 through mid June 2026.  Replacing a timber bridge.  Travelers must take US-287 or MT-200.  ADDITIONAL CLOSURE BETWEEN RP 0.1 TO RP 0.2. ELK CREEK AND ELK CREEK OVERFLOW.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt21bridges\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1037070","mrm":10.78,"url":"https://www.mdt.mt.gov/pubinvolve/mt21bridges","headline":"Road Work","label":"MT-21<br />from MP 0.7 to 20.9","dir":"B","report":"The following road construction project is in progress: road closed with speed limit 35 mph and detour until 6:00 PM Tuesday, September 15, 2026.<br />Road closure for MT-21 through mid June 2026. Replacing a timber bridge. Travelers must take US-287 or MT-200. ADDITIONAL CLOSURE BETWEEN RP 0.1 TO RP 0.2. ELK CREEK AND ELK CREEK OVERFLOW.","location_description":"MT-21 from MP 0.7 to 20.9","category":"cnstr"},"geometry":{"coordinates":["-112.146482939071","47.5002016754214"],"type":"Point"}},{"geometry":{"coordinates":["-111.266388058554","45.6825342748208"],"type":"Point"},"properties":{"enhanced_report":"<b>S-288  from MP 14.7 to 15.4</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/28/2026 7:30 AM<br>End Date: &nbsp;&nbsp;10/30/2026 4:00 PM<br><p><b>Additional Information:</b><br>Road Re-construction in progress, traffic is controlled by flaggers, traffic signals and pilot car..</p>","event_id":"1050646","route":"S-288","last_update":1777382469,"dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 12 ft until 4:00 PM Friday, October 30, 2026.<br />Road Re-construction in progress, traffic is controlled by flaggers, traffic signals and pilot car..","location_description":"S-288 from MP 14.7 to 15.4","category":"cnstr","mrm":15.05,"label":"S-288<br />from MP 14.7 to 15.4","headline":"Road Work"},"type":"Feature","id":"1050646"},{"geometry":{"coordinates":["-115.378419591451","47.6046314825812"],"type":"Point"},"id":"1058893","type":"Feature","properties":{"enhanced_report":"<b>MT-200  from MP 49.2 to 49.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 25-35 mph<br>Width Limit  10 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK. </p>","event_id":"1058893","route":"MT-200","last_update":1773332149,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 25 to 35 mph, and width limit 10 ft until 7:00 PM Monday, November 16, 2026.<br />ALTERNATING SINGLE LANE TRAFFIC FOR BRIDGE REHABILITATION WORK.","location_description":"MT-200 from MP 49.2 to 49.4","mrm":49.3,"headline":"Road Work","label":"MT-200<br />from MP 49.2 to 49.4"}},{"properties":{"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 11 ft until further notice.<br />M.A DeAtley is continuing to build subgrade for the new road alignment, culvert installation, while Sletten continues to remove the old bridge. Traffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.","location_description":"US-89 from MP 34.3 to 40.6","mrm":37.45,"url":"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx","label":"US-89<br />from MP 34.3 to 40.6","headline":"Road Work","enhanced_report":"<b>US-89  from MP 34.3 to 40.6</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 3/19/2026 2:14 PM<br><p><b>Additional Information:</b><br>M.A DeAtley is continuing to build subgrade for the new road alignment, culvert installation, while Sletten continues to remove the old bridge. Traffic will be managed by temporary traffic signals controlled by pilot cars during work hours. The detour bridge spanning the Teton River is complete and traffic is currently in use. An 11-foot width restriction is in place. If loads are wider than 11 feet, please call ahead to ensure safe passage is possible. Please watch for Speed Reductions, Lane Closures with pilot cars, and changing road conditions. Motorcycles, please consider alternate route with the changing road surface conditions. Work shift is tentatively 7:00 AM to 5:30 PM Monday-Friday.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/choteau/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1072371","route":"US-89","last_update":1780495231},"id":"1072371","type":"Feature","geometry":{"type":"Point","coordinates":["-112.141252755761","47.7663722839213"]}},{"geometry":{"type":"Point","coordinates":["-113.88390997677","47.958308153158"]},"properties":{"mrm":74.5,"url":"https://www.mdt.mt.gov/pubinvolve/mt83bridges/","label":"MT-83<br />from MP 70.5 to 78.5","headline":"Road Work","dir":"B","location_description":"MT-83 from MP 70.5 to 78.5","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, October 30, 2026.<br />The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek, weather and other factors permitting. Work includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas.","category":"cnstr","route":"MT-83","last_update":1779366804,"enhanced_report":"<b>MT-83  from MP 70.5 to 78.5</b><br>Travel Delay 15 mins<br>Flaggers<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 3/23/2026 6:00 AM<br>End Date: &nbsp;&nbsp;10/30/2026 5:00 PM<br><p><b>Additional Information:</b><br>The Montana Department of Transportation (MDT) along with Riverside Contracting, Inc. has begun construction along Montana Highway 83 (MT 83) near Swan Lake at Hall, Groom, and Six Mile Creek, weather and other factors permitting. Work includes replacing timber bridges with concrete box culverts, roadway reconstruction & improved safety features. Working hours are 7 a.m. to 5 p.m. Monday through Friday. Follow all posted signage and please watch for workers and equipment in the project areas. \n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/mt83bridges/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1073251"},"id":"1073251","type":"Feature"},{"properties":{"label":"I-90<br />from MP 301.3 to 307.4","headline":"Road Work","mrm":304.35,"location_description":"I-90 from MP 301.3 to 307.4","report":"The following road construction project is in progress: road construction with speed limit 35 to 55 mph until 5:00 PM Tuesday, September 1, 2026.<br />Signing work in progress from 7pm to 7am. \nWatch for workers","dir":"B","category":"cnstr","last_update":1780326999,"route":"I-90","event_id":"1078555","enhanced_report":"<b>I-90  from MP 301.3 to 307.4</b><br>Speed Limit 35-55 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Signing work in progress from 7pm to 7am.  \nWatch for workers\n</p>"},"id":"1078555","type":"Feature","geometry":{"type":"Point","coordinates":["-111.076207762342","45.72259346834"]}},{"geometry":{"type":"Point","coordinates":["-110.455067411368","45.7065811633097"]},"id":"1079159","type":"Feature","properties":{"enhanced_report":"<b>US-89  at MP 0.0</b><br>Detour<br>ROAD CLOSED<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:30 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Exit 340 overpass structure.  The bridge is closed to all traffic. Southbound US-89 traffic must enter I-90 westbound and turn around at Exit 337 to access eastbound I-90.  Eastbound I-90 traffic must pass Exit 340 and turn around at Exit 343 to access northbound US-89.  Mission Field is accessible from the eastbound I-90 on and off ramps.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1079159","route":"US-89","last_update":1778718611,"dir":"B","report":"The following road construction project is in progress: road closed with speed limit 35 mph and detour until 5:00 PM Friday, July 31, 2026.<br />Bridge work on Exit 340 overpass structure. The bridge is closed to all traffic. Southbound US-89 traffic must enter I-90 westbound and turn around at Exit 337 to access eastbound I-90. Eastbound I-90 traffic must pass Exit 340 and turn around at Exit 343 to access northbound US-89. Mission Field is accessible from the eastbound I-90 on and off ramps.","location_description":"US-89 at MP 0.0","category":"cnstr","mrm":0,"url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","label":"US-89<br />at MP 0.0","headline":"Road Work"}},{"type":"Feature","id":"1079160","properties":{"enhanced_report":"<b>I-90B  at MP 58.0</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 7:00 PM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work on Exit 337 overpass structure.  Single lane traffic and  width restriction.  Expect short delays.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1079160","route":"I-90B","last_update":1776729944,"category":"cnstr","dir":"B","location_description":"I-90B at MP 58.0","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work on Exit 337 overpass structure. Single lane traffic and width restriction. Expect short delays.","mrm":57.97,"url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","headline":"Road Work","label":"I-90B<br />at MP 58.0"},"geometry":{"coordinates":["-110.500274302856","45.6881050838335"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.376472583129","45.9151275204233"]},"id":"1079783","type":"Feature","properties":{"headline":"Road Work","label":"I-90<br />at MP 235.0","mrm":235,"category":"cnstr","location_description":"I-90 at MP 235.0","report":"The following road construction project is in progress: road construction until further notice.<br />I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED FOR MAINTENANCE","dir":"B","last_update":1777567391,"route":"I-90","event_id":"1079783","enhanced_report":"<b>I-90  at MP 235.0</b><br>Start Date: 3/30/2026 8:00 AM<br><p><b>Additional Information:</b><br>I-90 EB & WB REST AREAS/PARKING AREAS ARE CLOSED  FOR MAINTENANCE</p>"}},{"geometry":{"type":"Point","coordinates":["-104.343020312928","47.4714193988865"]},"type":"Feature","id":"1080144","properties":{"route":"MT-16","last_update":1774643965,"enhanced_report":"<b>MT-16 NB from MP 28.9 to 37.5</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 3/30/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>ALTERNATING SINGLE LANE TRAVEL</p>","event_id":"1080144","mrm":33.2,"headline":"Road Work","label":"MT-16<br />from MP 28.9 to 37.5","dir":"N","location_description":"MT-16 from MP 28.9 to 37.5","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Sunday, November 15, 2026.<br />ALTERNATING SINGLE LANE TRAVEL","category":"cnstr"}},{"geometry":{"type":"Point","coordinates":["-105.995986426994","47.3213564526461"]},"type":"Feature","id":"1084419","properties":{"enhanced_report":"<b>MT-200  from MP 253.5 to 260.2</b><br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 4/1/2026 3:04 PM<br>End Date: &nbsp;&nbsp;11/15/2026 6:00 PM<br><p><b>Additional Information:</b><br>Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/why200jordan/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1084419","route":"MT-200","last_update":1780318184,"dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, pilot car, signal lights, speed limit 35 mph, and width limit 14 ft until 6:00 PM Sunday, November 15, 2026.<br />Expect work zones with reduced speeds and/or work zones controlled by signal lights and pilot vehicles. Construction equipment will be working near the shoulders and south side of the existing roadway.","location_description":"MT-200 from MP 253.5 to 260.2","category":"cnstr","mrm":256.85,"headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/why200jordan/","label":"MT-200<br />from MP 253.5 to 260.2"}},{"id":"1085227","type":"Feature","properties":{"category":"cnstr","dir":"B","location_description":"US-12 from MP 228.0 to 260.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 10 mins, detour, flaggers, lane closures, speed limit 25 mph, and width limit 14 ft until 5:00 PM Friday, December 11, 2026.<br />The road will contain loose gravel. 14' Width Restriction.","mrm":244,"label":"US-12<br />from MP 228.0 to 260.0","url":"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx ","headline":"Road Work","enhanced_report":"<b>US-12  from MP 228.0 to 260.0</b><br>Motorcycles consider alternate route<br>Travel Delay 10 mins<br>Detour<br>Flaggers<br>Lane closures<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/2/2026 7:48 AM<br>End Date: &nbsp;&nbsp;12/11/2026 5:00 PM<br><p><b>Additional Information:</b><br>The road will contain loose gravel.  14' Width Restriction.</p><p><a href=\"https://mdt.mt.gov/pubinvolve/westofjordan/updates.aspx \" target=\"_blank\"><i>Website</i></a></p>","event_id":"1085227","route":"US-12","last_update":1775516032},"geometry":{"coordinates":["-107.142506718359","46.4634120172561"],"type":"Point"}},{"id":"1087909","type":"Feature","properties":{"dir":"B","location_description":"MT-83 from MP 45.0 to 84.0","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 12:00 AM Friday, August 28, 2026.<br />The project is scheduled to be completed by the end of August, weather and other factors permitting. Crews will be working from 6 a.m. to 6 p.m. The purpose of this construction project is to extend the service life of the roadway.\nFollow all posted signage and watch for workers and equipment.","category":"cnstr","mrm":64.5,"headline":"Road Work","label":"MT-83<br />from MP 45.0 to 84.0","enhanced_report":"<b>MT-83  from MP 45.0 to 84.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/6/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 12:00 AM<br><p><b>Additional Information:</b><br>The project is scheduled to be completed by the end of August, weather and other factors permitting. Crews will be working from 6 a.m. to 6 p.m. The purpose of this construction project is to extend the service life of the roadway.\nFollow all posted signage and watch for workers and equipment.\n</p>","event_id":"1087909","route":"MT-83","last_update":1776452682},"geometry":{"coordinates":["-113.829747901698","47.835557733804"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.123169171667","46.9250655070607"]},"type":"Feature","id":"1088646","properties":{"event_id":"1088646","enhanced_report":"<b>I-15  from MP 217.5 to 221.7</b><br>Lane closures<br>Median crossover detours<br>Speed Limit 45-55 mph<br>Length Limit  95 feet<br>Width Limit  12 feet<br>Start Date: 4/13/2026 5:00 AM<br>End Date: &nbsp;&nbsp;9/1/2026 7:00 PM<br><p><b>Additional Information:</b><br>NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/i15sieben/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1777567287,"route":"I-15","category":"cnstr","location_description":"I-15 from MP 217.5 to 221.7","report":"The following road construction project is in progress: road construction with lane closures, length limit 95 ft, median crossover detours, speed limit 45 to 55 mph, and width limit 12 ft until 7:00 PM Tuesday, September 1, 2026.<br />NB traffic will be crossed over for two way traffic on the SB side through the work zone with reduced speed. \nA 12 foot width restriction and 95 foot length restriction is in place (excluding double and triple combinations). \n Loads that range from (95 feet to 150 feet) in length and/or (12 feet to 18 feet) wide will need to stage in the wide load staging area to be moved through during the wide load marshalling time period. Loads exceeding 18 feet wide and/or 150 feet long are considered super loads. Super loads should contact Mountain West Holding Company Monday through Friday 8 am - 5 pm at 406-490-8390 to coordinate super load marshalling through the project on a case by case basis.\nWide load staging is in place NB (RP 216.0) and SB (RP 222.5). Wide load marshalling will take place from 4 am to 6 am Monday through Friday.","dir":"B","headline":"Road Work","url":"https://mdt.mt.gov/pubinvolve/i15sieben/","label":"I-15<br />from MP 217.5 to 221.7","mrm":219.6}},{"geometry":{"coordinates":["-114.659148050516","47.0192496448387"],"type":"Point"},"properties":{"dir":"B","location_description":"I-90 from MP 66.1 to 66.4","report":"The following road construction project is in progress: road construction until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.","category":"cnstr","mrm":66.25,"label":"I-90<br />from MP 66.1 to 66.4","url":"https://www.mdt.mt.gov/pubinvolve/i90alberton/","headline":"Road Work","enhanced_report":"<b>I-90  from MP 66.1 to 66.4</b><br>Start Date: 4/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS IN AREA\nNO TRAFFIC RESTRICTIONS AT THIS TIME\nBridge replacement across the Clark Fork River including grading and plant mix bituminous surfacing and crossovers on the Clark Fork/Old Hwy 10 Bridges project in Mineral County, west of Alberton. The project is located on westbound I-90 and includes the following\nlocations: From approximately RP 66.1 to 66.4, work involves removing and\nreplacing the existing westbound I-90 bridge over the Clark Fork River, and\n At approximately RP 65.5, work involves removing existing paint,\nremoving and repairing pack rust, and painting all steel elements in Spans 5 and 6 of the\nwestbound I-90 bridge over Old Hwy 10.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/i90alberton/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1089372","route":"I-90","last_update":1775576768},"id":"1089372","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-107.342389792751","45.0725427018512"]},"properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with lane closures, speed limit 45 mph, and width limit 14 ft until 5:00 PM Friday, July 31, 2026.<br />Alternating traffic patterns with single lane closures and reduced speeds in place. Watch for equipment and workers on roadway.","location_description":"I-90 from MP 543.3 to 554.4","dir":"B","headline":"Road Work","label":"I-90<br />from MP 543.3 to 554.4","mrm":548.85,"event_id":"1089376","enhanced_report":"<b>I-90  from MP 543.3 to 554.4</b><br>Lane closures<br>Speed Limit 45 mph<br>Width Limit  14 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Alternating traffic patterns with single lane closures and reduced speeds in place. Watch for equipment and workers on roadway.  </p>","last_update":1779885622,"route":"I-90"},"id":"1089376","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-109.72685049899","48.6058738254819"]},"type":"Feature","id":"1089377","properties":{"last_update":1780924886,"route":"S-232","event_id":"1089377","enhanced_report":"<b>S-232  from MP 0.8 to 10.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/8/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/26/2026 6:00 PM<br><p><b>Additional Information:</b><br>Workers installing chip seal and fog seal this week followed by striping operations. Traffic will be guided by signals and pilot car. Expect delays up to 15 minutes and watch for workers. Surface will contain loose chips and motorcycles are advised to consider alternate route or delay travel until later in the week. Work will be performed during daylight hours Monday through Friday. For questions about the project, call (406) 384-9823</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/havrenw/\" target=\"_blank\"><i>Website</i></a></p>","url":"https://www.mdt.mt.gov/pubinvolve/havrenw/","label":"S-232<br />from MP 0.8 to 10.0","headline":"Road Work","mrm":5.4,"category":"cnstr","location_description":"S-232 from MP 0.8 to 10.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, pilot car, signal lights, and speed limit 35 mph until 6:00 PM Sunday, July 26, 2026.<br />Workers installing chip seal and fog seal this week followed by striping operations. Traffic will be guided by signals and pilot car. Expect delays up to 15 minutes and watch for workers. Surface will contain loose chips and motorcycles are advised to consider alternate route or delay travel until later in the week. Work will be performed during daylight hours Monday through Friday. For questions about the project, call (406) 384-9823","dir":"B"}},{"geometry":{"type":"Point","coordinates":["-112.757534315669","44.7822686847715"]},"type":"Feature","id":"1089780","properties":{"headline":"Road Work","label":"I-15<br />from MP 0.0 to 57.0","mrm":28.5,"location_description":"I-15 from MP 0.0 to 57.0","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Sunday, November 15, 2026.<br />WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE /\nINTERMITTENT SINGLE LANE TRAFFIC ON THE BRIDGES BETWEEN MM 0-57","dir":"B","category":"cnstr","last_update":1778761951,"route":"I-15","event_id":"1089780","enhanced_report":"<b>I-15  from MP 0.0 to 57.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/10/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS PERFORMING BRIDGE MAINTENANCE /\nINTERMITTENT SINGLE LANE TRAFFIC ON THE BRIDGES BETWEEN MM 0-57  \n</p>"}},{"properties":{"event_id":"1089800","enhanced_report":"<b>MT-7  from MP 35.0 to 36.0</b><br>Detour<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  24 feet<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/29/2026 5:00 PM<br><p><b>Additional Information:</b><br>Traffic traveling on Paved detour \n\n</p>","last_update":1775662991,"route":"MT-7","category":"cnstr","report":"The following road construction project is in progress: road construction with detour, lane closures, speed limit 35 mph, and width limit 24 ft until 5:00 PM Tuesday, September 29, 2026.<br />Traffic traveling on Paved detour","location_description":"MT-7 from MP 35.0 to 36.0","dir":"B","headline":"Road Work","label":"MT-7<br />from MP 35.0 to 36.0","mrm":35.5},"type":"Feature","id":"1089800","geometry":{"coordinates":["-104.275406161318","46.3682326709782"],"type":"Point"}},{"id":"1089837","type":"Feature","properties":{"enhanced_report":"<b>I-90  from MP 0.0 to 5.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Median crossover detours<br>Speed Limit 35-55 mph<br>Width Limit  13 feet<br>Start Date: 4/8/2026 10:28 AM<br>End Date: &nbsp;&nbsp;11/16/2026 7:00 PM<br><p><b>Additional Information:</b><br>East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting  6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-360-3107\n\n</p>","event_id":"1089837","route":"I-90","last_update":1778761002,"dir":"B","location_description":"I-90 from MP 0.0 to 5.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, median crossover detours, speed limit 35 to 55 mph, and width limit 13 ft until 7:00 PM Monday, November 16, 2026.<br />East bound I-90, mp 0.0 to mp 5.0 will be closed. \nTraffic will be two-way, using median crossovers. The west crossover will be in Idaho at approximately mp 74.\nVarying speed limits, 35-55\nOn/off ramps accessing Lookout Pass will remain open.\n13ft width restrictions at the base of the load, and 14ft at the eaves.\nStaging areas for oversize loads will be Westbound at the Haugan Weigh Station MM15 and loads over 13ft in width will be piloted through by Poteet. Westbound piloting at 7am Monday through Friday.\nEast bound piloting 6am pacific time Monday through Friday.\nOversize load contact: Poteet Construction Inc., 406-360-3107","category":"cnstr","mrm":2.5,"label":"I-90<br />from MP 0.0 to 5.0","headline":"Road Work"},"geometry":{"coordinates":["-115.661019640764","47.4353615400145"],"type":"Point"}},{"properties":{"last_update":1779280696,"route":"CENTENNIAL AVE","event_id":"1090108","enhanced_report":"<b>CENTENNIAL AVE</b><br>Detour<br>Lane closures<br>Start Date: 4/13/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd.  Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection.  Closure expected to continue through July.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","headline":"Road Work","label":"CENTENNIAL AVE","mrm":0.11,"category":"cnstr","location_description":"CENTENNIAL AVE","report":"The following road construction project is in progress: road construction with lane closures and detour until 5:00 PM Saturday, August 1, 2026.<br />Centennial Ave will be closed between S Excelsior Ave and Santa Claus Rd. Detour in place between Centennial Ave/Montana St. intersection, along Montana St to Platinum St. to the Platinum St / S Excelsior Ave intersection. Closure expected to continue through July."},"type":"Feature","id":"1090108","geometry":{"coordinates":["-112.560568877555","45.9987575811237"],"type":"Point"}},{"geometry":{"coordinates":["-112.47707174804","45.9763958002525"],"type":"Point"},"type":"Feature","id":"1090121","properties":{"enhanced_report":"<b>I-90  from MP 227.0 to 228.0</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Median crossover detours<br>Speed Limit 45 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/1/2026 5:00 PM<br><p><b>Additional Information:</b><br>BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road.  The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/buttebridges\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1090121","route":"I-90","last_update":1778591743,"category":"cnstr","dir":"B","location_description":"I-90 from MP 227.0 to 228.0","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, detour, flaggers, median crossover detours, speed limit 45 mph, and width limit 16 ft until 5:00 PM Saturday, August 1, 2026.<br />BURLINGTON ST BRIDGE IS NOW CLOSED AND A 16 FT WIDTH RESTRICTION IS IN EFFECT ON I90\nI-90 is limited to single lane traffic for use with median crossovers.\nBurlington St will be closed from Continental Drive to Saddle Rock Road. The detour will be in place from Continental / Burlington St intersection, along Continental Drive to Mt Highland Drive, to Saddle Rock Road, to Burlington St intersection.","mrm":227.5,"url":"https://www.mdt.mt.gov/pubinvolve/buttebridges","headline":"Road Work","label":"I-90<br />from MP 227.0 to 228.0"}},{"id":"1090140","type":"Feature","properties":{"event_id":"1090140","enhanced_report":"<b>S-222  from MP 2.3 to 2.7</b><br>Motorcycles consider alternate route<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Start Date: 4/15/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/8/2026 5:00 PM<br><p><b>Additional Information:</b><br>REALIGNING THE CURVE, WIDENING SHOULDERS, FLATTENING SLOPES</p>","last_update":1780329560,"route":"S-222","category":"cnstr","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, lane closures, pilot car, and speed limit 35 mph until 5:00 PM Wednesday, July 8, 2026.<br />REALIGNING THE CURVE, WIDENING SHOULDERS, FLATTENING SLOPES","location_description":"S-222 from MP 2.3 to 2.7","dir":"B","label":"S-222<br />from MP 2.3 to 2.7","headline":"Road Work","mrm":2.53},"geometry":{"coordinates":["-112.673518543984","45.1818410282557"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-114.405796224872","48.40363902689"]},"properties":{"enhanced_report":"<b>US-93  from MP 129.7 to 133.0</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/27/2026 5:00 PM<br><p><b>Additional Information:</b><br>Construction hours are Monday thru Saturday from 6 a.m. to 8 p.m., dependent on weather and other unforeseen circumstances. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays. Expect rough roads.</p>","event_id":"1090189","route":"US-93","last_update":1780925191,"category":"cnstr","dir":"B","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 5:00 PM Friday, November 27, 2026.<br />Construction hours are Monday thru Saturday from 6 a.m. to 8 p.m., dependent on weather and other unforeseen circumstances. Outside of planned closures, drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays. Expect rough roads.","location_description":"US-93 from MP 129.7 to 133.0","mrm":131.35,"label":"US-93<br />from MP 129.7 to 133.0","headline":"Road Work"},"type":"Feature","id":"1090189"},{"id":"1090190","type":"Feature","properties":{"enhanced_report":"<b>US-2  from MP 11.0 to 12.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Lane closure with flaggers. Speed limit posted to 35MPH. 12Ã¢ÂÂ Width restrictions. Bridge will be CLOSED June 8th at 11:30pm. Bridge will be open prior to 5:30am on June 9th.  </p>","event_id":"1090190","route":"US-2","last_update":1780339722,"dir":"B","location_description":"US-2 from MP 11.0 to 12.0","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, signal lights, speed limit 35 mph, and width limit 12 ft until 5:00 PM Friday, July 31, 2026.<br />Lane closure with flaggers. Speed limit posted to 35MPH. 12Ã¢ÂÂ Width restrictions. Bridge will be CLOSED June 8th at 11:30pm. Bridge will be open prior to 5:30am on June 9th.","category":"cnstr","mrm":11.5,"headline":"Road Work","label":"US-2<br />from MP 11.0 to 12.0"},"geometry":{"type":"Point","coordinates":["-115.918591257437","48.4966916288793"]}},{"type":"Feature","id":"1090191","properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 from MP 13.8 to 13.9","dir":"B","headline":"Road Work","label":"MT-37<br />from MP 13.8 to 13.9","mrm":13.85,"event_id":"1090191","enhanced_report":"<b>MT-37  from MP 13.8 to 13.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775846641,"route":"MT-37"},"geometry":{"type":"Point","coordinates":["-115.322693378601","48.3655987456692"]}},{"properties":{"report":"The following road construction project is in progress: road construction with lane closures, speed limit 55 mph, and width limit 14 ft until further notice.<br />A 14 FT. width restriction will be in place on I-90 from MM 253 to 284. An alternate route will need to be used.\n\nLane closures and reduced speeds will be in place for bridge work from MM 263 to 265.","location_description":"I-90 from MP 253.0 to 284.0","dir":"B","category":"cnstr","headline":"Road Work","label":"I-90<br />from MP 253.0 to 284.0","mrm":268.5,"event_id":"1090192","enhanced_report":"<b>I-90  from MP 253.0 to 284.0</b><br>Lane closures<br>Speed Limit 55 mph<br>Width Limit  14 feet<br>Start Date: 4/13/2026 7:00 AM<br><p><b>Additional Information:</b><br>A 14 FT. width restriction will be in place on I-90 from MM 253 to 284.  An alternate route will need to be used.\n\nLane closures and reduced speeds will be in place for bridge work from MM 263 to 265.\n</p>","last_update":1776723155,"route":"I-90"},"type":"Feature","id":"1090192","geometry":{"coordinates":["-111.725896112961","45.9149892969352"],"type":"Point"}},{"id":"1090193","type":"Feature","properties":{"event_id":"1090193","enhanced_report":"<b>MT-37  at MP 23.3</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775845108,"route":"MT-37","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 23.3","dir":"B","label":"MT-37<br />at MP 23.3","headline":"Road Work","mrm":23.3},"geometry":{"coordinates":["-115.255883243005","48.4761950786896"],"type":"Point"}},{"type":"Feature","id":"1090194","properties":{"label":"MT-37<br />at MP 29.4","headline":"Road Work","mrm":29.4,"category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 29.4","dir":"B","last_update":1775845352,"route":"MT-37","event_id":"1090194","enhanced_report":"<b>MT-37  at MP 29.4</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>"},"geometry":{"type":"Point","coordinates":["-115.210054176294","48.535877185965"]}},{"type":"Feature","id":"1090196","properties":{"mrm":34.1,"label":"MT-37<br />at MP 34.1","headline":"Road Work","dir":"B","location_description":"MT-37 at MP 34.1","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","category":"cnstr","route":"MT-37","last_update":1775845545,"enhanced_report":"<b>MT-37  at MP 34.1</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","event_id":"1090196"},"geometry":{"type":"Point","coordinates":["-115.206537723938","48.5954033368767"]}},{"geometry":{"type":"Point","coordinates":["-115.26574521557","48.6277169631435"]},"type":"Feature","id":"1090197","properties":{"route":"MT-37","last_update":1775845715,"enhanced_report":"<b>MT-37  at MP 37.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","event_id":"1090197","mrm":37.9,"headline":"Road Work","label":"MT-37<br />at MP 37.9","category":"cnstr","dir":"B","location_description":"MT-37 at MP 37.9","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays"}},{"geometry":{"coordinates":["-115.285431578056","48.7598371624946"],"type":"Point"},"properties":{"event_id":"1090198","enhanced_report":"<b>MT-37  at MP 48.5</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775845901,"route":"MT-37","category":"cnstr","location_description":"MT-37 at MP 48.5","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","dir":"B","label":"MT-37<br />at MP 48.5","headline":"Road Work","mrm":48.5},"id":"1090198","type":"Feature"},{"geometry":{"coordinates":["-115.117262468785","48.8947606118414"],"type":"Point"},"properties":{"event_id":"1090199","enhanced_report":"<b>MT-37  at MP 63.9</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  10 feet<br>Start Date: 4/13/2026 12:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays</p>","last_update":1775846016,"route":"MT-37","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 10 ft until 5:00 PM Friday, July 31, 2026.<br />Bridge work 10' Width restriction, reduced speed limit, traffic control, narrow lanes and travel delays","location_description":"MT-37 at MP 63.9","dir":"B","headline":"Road Work","label":"MT-37<br />at MP 63.9","mrm":63.9},"id":"1090199","type":"Feature"},{"geometry":{"coordinates":["-110.454207310453","45.7069261946315"],"type":"Point"},"properties":{"dir":"B","report":"The following road construction project is in progress: road construction with speed limit 35 mph and lane closures until 5:00 PM Thursday, July 2, 2026.<br />I-90 Eastbound and Westbound will see single lane closures for bridge work","location_description":"I-90 from MP 340.0 to 341.0","category":"cnstr","mrm":340.5,"url":"https://mdt.mt.gov/pubinvolve/livingstonbridges/","label":"I-90<br />from MP 340.0 to 341.0","headline":"Road Work","enhanced_report":"<b>I-90  from MP 340.0 to 341.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/2/2026 5:00 PM<br><p><b>Additional Information:</b><br>I-90 Eastbound and Westbound will see single lane closures for bridge work</p><p><a href=\"https://mdt.mt.gov/pubinvolve/livingstonbridges/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1090382","route":"I-90","last_update":1780931357},"type":"Feature","id":"1090382"},{"geometry":{"coordinates":["-106.915392427053","47.3608255342406"],"type":"Point"},"type":"Feature","id":"1091062","properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with detour, speed limit 25 mph, and width limit 14 ft until 7:00 PM Friday, August 28, 2026.<br />Bridge Replacement 2KM North of Jordan at Vail Creek. This is a 35 mph gravel road.","location_description":"S-543","label":"S-543","headline":"Road Work","mrm":0,"event_id":"1091062","enhanced_report":"<b>S-543</b><br>Detour<br>Speed Limit 25 mph<br>Width Limit  14 feet<br>Start Date: 4/20/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 7:00 PM<br><p><b>Additional Information:</b><br>Bridge Replacement 2KM North of Jordan at Vail Creek. This is a 35 mph gravel road.</p>","last_update":1777377994,"route":"S-543"}},{"geometry":{"coordinates":["-112.632712739239","45.239533400493"],"type":"Point"},"properties":{"mrm":1,"label":"N HIGHWAY 91","headline":"Road Work","category":"cnstr","location_description":"N HIGHWAY 91","report":"The following road construction project is in progress: road construction with travel delay 5 mins, flaggers, lane closures, signal lights, and speed limit 30 mph until further notice.<br />Temporary lane closures are in place for road construction. Flaggers and traffic lights are controlling traffic on both ends of the work zone.","route":"N HIGHWAY 91","last_update":1776364240,"enhanced_report":"<b>N HIGHWAY 91</b><br>Travel Delay 5 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 30 mph<br>Start Date: 4/16/2026 12:28 PM<br><p><b>Additional Information:</b><br>Temporary lane closures are in place for road construction.  Flaggers and traffic lights are controlling traffic on both ends of the work zone.</p>","event_id":"1091201"},"type":"Feature","id":"1091201"},{"geometry":{"type":"Point","coordinates":["-111.990454274355","45.8753018790319"]},"properties":{"label":"I-90<br />from MP 252.0 to 257.0","headline":"Road Work","mrm":254.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 55 mph and lane closures until further notice.<br />WATCH FOR WORKERS","location_description":"I-90 from MP 252.0 to 257.0","dir":"B","last_update":1776871223,"route":"I-90","event_id":"1091980","enhanced_report":"<b>I-90  from MP 252.0 to 257.0</b><br>Lane closures<br>Speed Limit 55 mph<br>Start Date: 4/22/2026 9:17 AM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS</p>"},"id":"1091980","type":"Feature"},{"geometry":{"type":"Point","coordinates":["-108.784068432114","45.668307236238"]},"id":"1093845","type":"Feature","properties":{"enhanced_report":"<b>W MAIN ST</b><br>Start Date: 4/28/2026 7:00 AM<br>End Date: &nbsp;&nbsp;7/31/2026 7:00 PM<br><p><b>Additional Information:</b><br>Miscellaneous construction activities.  Watch for workers, equipment, and traffic lane changes from 1ST Avenue to Golf Course Road.</p>","event_id":"1093845","route":"W MAIN ST","last_update":1779983150,"category":"cnstr","report":"The following road construction project is in progress: road construction until 7:00 PM Friday, July 31, 2026.<br />Miscellaneous construction activities. Watch for workers, equipment, and traffic lane changes from 1ST Avenue to Golf Course Road.","location_description":"W MAIN ST","mrm":0.6,"headline":"Road Work","label":"W MAIN ST"}},{"geometry":{"type":"Point","coordinates":["-111.949818307016","46.590256729943"]},"properties":{"route":"US-12","last_update":1780678454,"enhanced_report":"<b>US-12  from MP 45.7 to 49.9</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 5/4/2026 8:00 AM<br>End Date: &nbsp;&nbsp;8/19/2026 6:00 PM<br><p><b>Additional Information:</b><br>Lane closures with intermittent intersection closures. As operations progress, turn lanes and intersections will be intermittently closed or controlled by flaggers.\n\nWet Paint.  Stay off lines.  Fresh Oil.  14 foot width restriction thru June 20\n\n\n</p>","event_id":"1095440","mrm":47.8,"label":"US-12<br />from MP 45.7 to 49.9","headline":"Road Work","category":"cnstr","dir":"B","location_description":"US-12 from MP 45.7 to 49.9","report":"The following road construction project is in progress: road construction with flaggers, lane closures, speed limit 35 mph, and width limit 14 ft until 6:00 PM Wednesday, August 19, 2026.<br />Lane closures with intermittent intersection closures. As operations progress, turn lanes and intersections will be intermittently closed or controlled by flaggers.\n\nWet Paint. Stay off lines. Fresh Oil. 14 foot width restriction thru June 20"},"id":"1095440","type":"Feature"},{"geometry":{"coordinates":["-109.949486475835","45.8254934192736"],"type":"Point"},"id":"1095778","type":"Feature","properties":{"location_description":"S-298 from MP 0.7 to 1.0","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, signal lights, speed limit 35 mph, and width limit 11 ft until 5:00 PM Wednesday, July 15, 2026.<br />Bridge Rehab work with single lane traffic controlled by signals 24hrs-7 days a week. Work will continue until mid July.","dir":"B","category":"cnstr","headline":"Road Work","label":"S-298<br />from MP 0.7 to 1.0","mrm":0.85,"event_id":"1095778","enhanced_report":"<b>S-298  from MP 0.7 to 1.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  11 feet<br>Start Date: 5/4/2026 6:00 AM<br>End Date: &nbsp;&nbsp;7/15/2026 5:00 PM<br><p><b>Additional Information:</b><br>Bridge Rehab work with single lane traffic controlled by signals 24hrs-7 days a week. Work  will continue until mid July.</p>","last_update":1779192394,"route":"S-298"}},{"id":"1096571","type":"Feature","properties":{"last_update":1778694516,"route":"I-90","event_id":"1096571","enhanced_report":"<b>I-90 EB from MP 529.0 to 543.5</b><br>Lane closures<br>Speed Limit 35-65 mph<br>Width Limit  14 feet<br>Start Date: 5/4/2026 4:00 PM<br>End Date: &nbsp;&nbsp;7/31/2026 6:00 PM<br><p><b>Additional Information:</b><br>Watch for changing traffic patterns, equipment and workers on roadway. </p>","label":"I-90<br />from MP 529.0 to 543.5","headline":"Road Work","mrm":536.25,"location_description":"I-90 from MP 529.0 to 543.5","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 to 65 mph, and width limit 14 ft eastbound until 6:00 PM Friday, July 31, 2026.<br />Watch for changing traffic patterns, equipment and workers on roadway.","dir":"E","category":"cnstr"},"geometry":{"coordinates":["-107.360017299194","45.2356111888617"],"type":"Point"}},{"properties":{"event_id":"1096611","enhanced_report":"<b>US-191  from MP 86.0 to 88.5</b><br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  9 feet<br>Start Date: 5/11/2026 7:00 AM<br>End Date: &nbsp;&nbsp;9/18/2026 5:00 PM<br><p><b>Additional Information:</b><br>9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges. </p>","last_update":1779279960,"route":"US-191","category":"cnstr","location_description":"US-191 from MP 86.0 to 88.5","report":"The following road construction project is in progress: road construction with lane closures, signal lights, speed limit 35 mph, and width limit 9 ft until 5:00 PM Friday, September 18, 2026.<br />9 foot width restriction in place over the Fred Robinson and Armell's Creek Bridge. Construction on the two bridges will include a mill and overlay of the bridge decks, new joints, and new paved approaches to the bridges.","dir":"B","label":"US-191<br />from MP 86.0 to 88.5","headline":"Road Work","mrm":87.25},"id":"1096611","type":"Feature","geometry":{"type":"Point","coordinates":["-108.687762641939","47.619871710269"]}},{"geometry":{"coordinates":["-112.72665106716","45.7662317211268"],"type":"Point"},"id":"1096665","type":"Feature","properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 16 ft northbound until 6:00 PM Friday, August 28, 2026.<br />Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15","location_description":"I-15 from MP 96.0 to 111.0","dir":"N","headline":"Road Work","label":"I-15<br />from MP 96.0 to 111.0","mrm":103.5,"event_id":"1096665","enhanced_report":"<b>I-15 NB from MP 96.0 to 111.0</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  16 feet<br>Start Date: 5/4/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/28/2026 6:00 PM<br><p><b>Additional Information:</b><br>Bridge deck rehabilitation will occur on bridges located at RP99 & RP110 in both the northbound & southbound lanes on I15</p>","last_update":1778074549,"route":"I-15"}},{"id":"1096877","type":"Feature","properties":{"mrm":382.55,"url":"https://www.mdt.mt.gov/pubinvolve/havreurban/","headline":"Road Work","label":"US-2<br />from MP 381.3 to 383.8","dir":"B","report":"The following road construction project is in progress: road construction with speed limit 25 to 35 mph and lane closures until 8:00 PM Saturday, August 15, 2026.<br />Work will take place during daylight hours on First Street from 3rd Avenue West in the outside lane and progress eastbound. Workers will begin removing and replacing compromised concrete panels and other repairs in the first phase of the project. Surface grinding will begin in the second phase once the majority of panel repair is complete. The work is planned to phase in 4-5 block segments and \"racetrack\" the project beginning outside moving inward. Traffic will be routed to one-lane in each direction, guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Business accesses will be highlighted and guided with traffic control devices. Wide loads are not restricted at this time, but may be delayed depending on current operations. For more information, contact 406-208-0551","location_description":"US-2 from MP 381.3 to 383.8","category":"cnstr","route":"US-2","last_update":1779196568,"enhanced_report":"<b>US-2  from MP 381.3 to 383.8</b><br>Lane closures<br>Speed Limit 25-35 mph<br>Start Date: 5/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/15/2026 8:00 PM<br><p><b>Additional Information:</b><br>Work will take place during daylight hours on First Street from 3rd Avenue West in the outside lane and progress eastbound. Workers will begin removing and replacing compromised concrete panels and other repairs in the first phase of the project. Surface grinding will begin in the second phase once the majority of panel repair is complete. The work is planned to phase in 4-5 block segments and \"racetrack\" the project beginning outside moving inward. Traffic will be routed to one-lane in each direction, guided by traffic control devices. Minimal delays are anticipated and speeds will be the lesser of 35 mph or as permanently posted, but please account for additional time in your travels. Business accesses will be highlighted and guided with traffic control devices. Wide loads are not restricted at this time, but may be delayed depending on current operations. For more information, contact 406-208-0551</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/havreurban/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1096877"},"geometry":{"type":"Point","coordinates":["-109.67215663507","48.5530539006946"]}},{"geometry":{"type":"Point","coordinates":["-105.067999357911","46.8808194421691"]},"properties":{"label":"I-94<br />from MP 187.1 to 192.6","headline":"Road Work","mrm":189.85,"location_description":"I-94 from MP 187.1 to 192.6","report":"The following road construction project is in progress: road construction with median crossover detours, speed limit 35 to 65 mph, and width limit 16 ft until 8:00 PM Sunday, November 15, 2026.<br />West bound traffic merges to east bound passing lane with median detours.","dir":"B","category":"cnstr","last_update":1778551821,"route":"I-94","event_id":"1096893","enhanced_report":"<b>I-94  from MP 187.1 to 192.6</b><br>Median crossover detours<br>Speed Limit 35-65 mph<br>Width Limit  16 feet<br>Start Date: 4/13/2026 7:00 AM<br>End Date: &nbsp;&nbsp;11/15/2026 8:00 PM<br><p><b>Additional Information:</b><br>West bound traffic merges to east bound passing lane with median detours.\n\n</p>"},"id":"1096893","type":"Feature"},{"properties":{"enhanced_report":"<b>US-2  from MP 169.1 to 180.7</b><br>Motorcycles consider alternate route<br>Travel Delay 15 mins<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 5/13/2026 7:00 AM<br><p><b>Additional Information:</b><br>Work will resume on 6/15/2026. Traffic can expect Temporary Traffic Control Lights with Pilot cars to escort through the work zone. Work areas will be limited to single lane. Work will consist of Guardrail installation on the west end of the project and proceeding east. Please watch for workers and equipment throughout the project. </p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/stantonessex\" target=\"_blank\"><i>Website</i></a></p>","event_id":"1096961","route":"US-2","last_update":1780971014,"category":"cnstr","dir":"B","location_description":"US-2 from MP 169.1 to 180.7","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 15 mins, lane closures, pilot car, signal lights, and speed limit 35 mph until further notice.<br />Work will resume on 6/15/2026. Traffic can expect Temporary Traffic Control Lights with Pilot cars to escort through the work zone. Work areas will be limited to single lane. Work will consist of Guardrail installation on the west end of the project and proceeding east. Please watch for workers and equipment throughout the project.","mrm":174.9,"label":"US-2<br />from MP 169.1 to 180.7","url":"https://www.mdt.mt.gov/pubinvolve/stantonessex","headline":"Road Work"},"id":"1096961","type":"Feature","geometry":{"coordinates":["-113.643981140321","48.3481924649148"],"type":"Point"}},{"geometry":{"type":"Point","coordinates":["-112.039365455286","46.7043615487372"]},"properties":{"event_id":"1098028","enhanced_report":"<b>S-279  from MP 0.6 to 1.3</b><br>Motorcycles consider alternate route<br>Detour<br>Flaggers<br>Lane closures<br>ROAD CLOSED<br>Signal lights<br>Speed Limit 15 mph<br>Start Date: 5/18/2026 12:00 PM<br>End Date: &nbsp;&nbsp;10/7/2026 6:00 PM<br><p><b>Additional Information:</b><br>Road Construction at the Lincoln Rd and Applegate Dr Intersection.  \nDetours in place with turning restrictions.  Use alternative routes when possible.\nWestbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection.  No left (South) turn onto Applegate Drive. \nEastbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection.  Additional detour for right turn (South) onto Applegate Drive.\nSouthbound travelers (Applegate Dr): Two-way, 15 mph detour around the northern portion of the intersection.  Left/Right turn only onto Lincoln Road\nNorthbound travelers (Applegate Dr): Right turn (East) only onto Lincoln Road.  \nExpect single lane closures controlled by signal lights and flaggers during various operations.\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1780070615,"route":"S-279","category":"cnstr","report":"The following road construction project is in progress: road closed with Motorcycles consider alternate route, detour, flaggers, lane closures, signal lights, and speed limit 15 mph until 6:00 PM Wednesday, October 7, 2026.<br />Road Construction at the Lincoln Rd and Applegate Dr Intersection. \nDetours in place with turning restrictions. Use alternative routes when possible.\nWestbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection. No left (South) turn onto Applegate Drive. \nEastbound travelers (Lincoln Rd): Two-way, 15 mph detour around the northern portion of the intersection. Additional detour for right turn (South) onto Applegate Drive.\nSouthbound travelers (Applegate Dr): Two-way, 15 mph detour around the northern portion of the intersection. Left/Right turn only onto Lincoln Road\nNorthbound travelers (Applegate Dr): Right turn (East) only onto Lincoln Road. \nExpect single lane closures controlled by signal lights and flaggers during various operations.","location_description":"S-279 from MP 0.6 to 1.3","dir":"B","label":"S-279<br />from MP 0.6 to 1.3","url":"https://www.mdt.mt.gov/pubinvolve/lincolnapplegate/","headline":"Road Work","mrm":0.95},"id":"1098028","type":"Feature"},{"properties":{"category":"cnstr","report":"The following road construction project is in progress: road construction with lane closures until 7:00 PM Tuesday, June 30, 2026.<br />The public can obtain updates on progress by texting 844-764-2126 or emailing greatfalls@kljeng.com. This is on 14th ST (Southbound one-way) between 12th Ave N and 10th Ave S, Great Falls. Right lane is closed, left lane is open. There is no impact to northbound traffic on 15th ST.","location_description":"14TH ST","mrm":0.83,"headline":"Road Work","label":"14TH ST","enhanced_report":"<b>14TH ST</b><br>Lane closures<br>Start Date: 5/18/2026 7:00 AM<br>End Date: &nbsp;&nbsp;6/30/2026 7:00 PM<br><p><b>Additional Information:</b><br>The public can obtain updates on progress by texting 844-764-2126 or emailing greatfalls@kljeng.com. This is on 14th ST (Southbound one-way) between 12th Ave N and 10th Ave S, Great Falls. Right lane is closed, left lane is open. There is no impact to northbound traffic on 15th ST.</p>","event_id":"1098198","route":"14TH ST","last_update":1779322406},"type":"Feature","id":"1098198","geometry":{"type":"Point","coordinates":["-111.283341429415","47.5051605763171"]}},{"geometry":{"type":"Point","coordinates":["-114.052708643632","47.6898083054919"]},"id":"1098303","type":"Feature","properties":{"headline":"Road Work","label":"MT-35<br />from MP 1.0 to 6.0","mrm":3.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with flaggers, lane closures, and speed limit 35 mph until 5:00 PM Monday, August 31, 2026.<br />WORKZONE IN EFFECT MON.-FRI. ;7AM TO 5 PM \nINTERMITTENT LANE CLOSURES FOR TREE TRIMMING; WATCH FOR FLAGGERS; REDUCE SPEED TO 35 MPH","location_description":"MT-35 from MP 1.0 to 6.0","dir":"B","last_update":1779888509,"route":"MT-35","event_id":"1098303","enhanced_report":"<b>MT-35  from MP 1.0 to 6.0</b><br>Flaggers<br>Lane closures<br>Speed Limit 35 mph<br>Start Date: 5/26/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/31/2026 5:00 PM<br><p><b>Additional Information:</b><br>WORKZONE IN EFFECT MON.-FRI. ;7AM TO 5 PM \nINTERMITTENT LANE CLOSURES FOR TREE TRIMMING; WATCH FOR FLAGGERS; REDUCE SPEED TO 35 MPH</p>"}},{"geometry":{"type":"Point","coordinates":["-110.700527892023","47.8198318326618"]},"id":"1098358","type":"Feature","properties":{"event_id":"1098358","enhanced_report":"<b>US-87  from MP 35.5 to 43.4</b><br>Motorcycles consider alternate route<br>Travel Delay 20 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 5/26/2026 6:00 AM<br>End Date: &nbsp;&nbsp;7/20/2026 8:00 PM<br><p><b>Additional Information:</b><br>Motorcycles consider alternate route.  Milled/Grooved surface initially then loose chips.  Chip seal operation scheduled for the week of July 6th, 2026</p>","last_update":1780589339,"route":"US-87","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, travel delay 20 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 8:00 PM Monday, July 20, 2026.<br />Motorcycles consider alternate route. Milled/Grooved surface initially then loose chips. Chip seal operation scheduled for the week of July 6th, 2026","location_description":"US-87 from MP 35.5 to 43.4","dir":"B","category":"cnstr","headline":"Road Work","label":"US-87<br />from MP 35.5 to 43.4","mrm":39.45}},{"geometry":{"type":"Point","coordinates":["-104.564306729396","48.7758797049185"]},"type":"Feature","id":"1098361","properties":{"event_id":"1098361","enhanced_report":"<b>MT-5  from MP 41.0 to 42.0</b><br>Travel Delay 15 mins<br>Lane closures<br>Speed Limit 15 mph<br>Width Limit  12 feet<br>Start Date: 6/1/2026 7:00 AM<br>End Date: &nbsp;&nbsp;8/26/2026 5:00 PM<br><p><b>Additional Information:</b><br>City of Plentywood water project</p>","last_update":1779397085,"route":"MT-5","category":"cnstr","report":"The following road construction project is in progress: road construction with travel delay 15 mins, lane closures, speed limit 15 mph, and width limit 12 ft until 5:00 PM Wednesday, August 26, 2026.<br />City of Plentywood water project","location_description":"MT-5 from MP 41.0 to 42.0","dir":"B","headline":"Road Work","label":"MT-5<br />from MP 41.0 to 42.0","mrm":41.5}},{"geometry":{"type":"Point","coordinates":["-115.455874866983","47.3967699294057"]},"properties":{"enhanced_report":"<b>I-90  from MP 11.2 to 15.7</b><br>Lane closures<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/26/2026 6:00 AM<br>End Date: &nbsp;&nbsp;8/25/2026 6:00 AM<br><p><b>Additional Information:</b><br>This project on I-90 consists of resurfacing the existing roadway including mill, plant mix overlay, new guardrail, seal and cover. This project is in Mineral County starting just east of the Saltese Interchange at reference point 11.2 going east for 4.6 miles to just west of the Haugan Interchange at reference point 15.7.\nStaging area for oversize loads Eastbound will be at Mile Marker 10.8. Oversized loads will be piloted through the project from 6:00am to 8:00am. Monday through Friday.\nStaging area for oversized loads Westbound will be at Mile Marker 15.5. Oversized loads will be piloted through the project from 6:00am to 8:00am. Monday through Friday.\nOversize load contact: Mountain West Holding Company, 406-490-7230\n\n\n\n</p>","event_id":"1098453","route":"I-90","last_update":1779901629,"dir":"B","report":"The following road construction project is in progress: road construction with lane closures, speed limit 35 mph, and width limit 12 ft until 6:00 AM Tuesday, August 25, 2026.<br />This project on I-90 consists of resurfacing the existing roadway including mill, plant mix overlay, new guardrail, seal and cover. This project is in Mineral County starting just east of the Saltese Interchange at reference point 11.2 going east for 4.6 miles to just west of the Haugan Interchange at reference point 15.7.\nStaging area for oversize loads Eastbound will be at Mile Marker 10.8. Oversized loads will be piloted through the project from 6:00am to 8:00am. Monday through Friday.\nStaging area for oversized loads Westbound will be at Mile Marker 15.5. Oversized loads will be piloted through the project from 6:00am to 8:00am. Monday through Friday.\nOversize load contact: Mountain West Holding Company, 406-490-7230","location_description":"I-90 from MP 11.2 to 15.7","category":"cnstr","mrm":13.45,"headline":"Road Work","label":"I-90<br />from MP 11.2 to 15.7"},"type":"Feature","id":"1098453"},{"properties":{"route":"14TH AVE","last_update":1780327827,"enhanced_report":"<b>14TH AVE</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Start Date: 6/1/2026 9:28 AM<br>End Date: &nbsp;&nbsp;7/24/2026 10:00 PM<br><p><b>Additional Information:</b><br>Workers lowering surface utilities this week and then milling road surface. Crack sealing and chip sealing to follow. Expect short delays with traffic guided by flaggers. Work is expected to be fast paced, but watch for temporary street closures and proceed to the next block. Work will be during daylight hours. Give plenty of time for commuting and watch out for workers.</p>","event_id":"1099086","mrm":0.17,"headline":"Road Work","label":"14TH AVE","report":"The following road construction project is in progress: road construction with travel delay 10 mins, flaggers, and lane closures until 10:00 PM Friday, July 24, 2026.<br />Workers lowering surface utilities this week and then milling road surface. Crack sealing and chip sealing to follow. Expect short delays with traffic guided by flaggers. Work is expected to be fast paced, but watch for temporary street closures and proceed to the next block. Work will be during daylight hours. Give plenty of time for commuting and watch out for workers.","location_description":"14TH AVE","category":"cnstr"},"id":"1099086","type":"Feature","geometry":{"coordinates":["-109.662695033896","48.5487958232171"],"type":"Point"}},{"geometry":{"coordinates":["-114.431714471309","48.3879812143661"],"type":"Point"},"properties":{"report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 8:00 PM Friday, June 19, 2026.<br />Construction hours are Monday thru Saturday from 6 a.m. to 9 p.m., dependent on weather and other unforeseen circumstances. Potential for uneven surfaces. Drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays.","location_description":"S-424 from MP 15.8 to 17.1","dir":"B","category":"cnstr","headline":"Road Work","label":"S-424<br />from MP 15.8 to 17.1","mrm":16.44,"event_id":"1099154","enhanced_report":"<b>S-424  from MP 15.8 to 17.1</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/2/2026 6:54 AM<br>End Date: &nbsp;&nbsp;6/19/2026 8:00 PM<br><p><b>Additional Information:</b><br>Construction hours are Monday thru Saturday from 6 a.m. to 9 p.m., dependent on weather and other unforeseen circumstances. Potential for uneven surfaces. Drivers should expect single-lane traffic with reduced speeds and up to 15-minute delays.</p>","last_update":1780405218,"route":"S-424"},"type":"Feature","id":"1099154"},{"type":"Feature","id":"1099183","properties":{"last_update":1780432537,"route":"MT-24","event_id":"1099183","enhanced_report":"<b>MT-24  from MP 5.5 to 14.7</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/2/2026 2:31 PM<br>End Date: &nbsp;&nbsp;6/12/2026 6:00 PM<br><p><b>Additional Information:</b><br>Bridge Rail work on Nelson Creek and Timber Creek Bridges.  One lane traffic controlled by signals,  will be overnight also due to no protection on bridge corners.</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/\" target=\"_blank\"><i>Website</i></a></p>","label":"MT-24<br />from MP 5.5 to 14.7","url":"https://www.mdt.mt.gov/pubinvolve/hwy200jordan/","headline":"Road Work","mrm":10.1,"report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, lane closures, signal lights, and speed limit 35 mph until 6:00 PM Friday, June 12, 2026.<br />Bridge Rail work on Nelson Creek and Timber Creek Bridges. One lane traffic controlled by signals, will be overnight also due to no protection on bridge corners.","location_description":"MT-24 from MP 5.5 to 14.7","dir":"B","category":"cnstr"},"geometry":{"type":"Point","coordinates":["-106.168646286114","47.4699677486954"]}},{"geometry":{"type":"Point","coordinates":["-114.597768917215","47.3602981913859"]},"id":"1099278","type":"Feature","properties":{"mrm":94.6,"label":"MT-200<br />from MP 90.5 to 98.7","headline":"Road Work","category":"cnstr","dir":"B","location_description":"MT-200 from MP 90.5 to 98.7","report":"The following road construction project is in progress: road construction with travel delay 10 mins, flaggers, lane closures, pilot car, signal lights, and speed limit 35 mph until 12:00 PM Wednesday, September 30, 2026.<br /> Single lane closures for sign installation 6-2-26 through 6-10-26 with Pilot car.","route":"MT-200","last_update":1780501363,"enhanced_report":"<b>MT-200  from MP 90.5 to 98.7</b><br>Travel Delay 10 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/3/2026 9:39 AM<br>End Date: &nbsp;&nbsp;9/30/2026 12:00 PM<br><p><b>Additional Information:</b><br> Single lane closures for sign installation 6-2-26 through 6-10-26 with Pilot car. </p>","event_id":"1099278"}},{"geometry":{"type":"Point","coordinates":["-112.340171509188","46.2022181411116"]},"type":"Feature","id":"1099354","properties":{"enhanced_report":"<b>I-15 NB from MP 146.0 to 148.0</b><br>Right lane CLOSED<br>Speed Limit 35-55       mph<br>Width Limit  16 feet<br>Start Date: 6/8/2026 6:00 AM<br>End Date: &nbsp;&nbsp;7/3/2026 7:00 PM<br><p><b>Additional Information:</b><br>Shoulder widening with new barrier rail.</p>","event_id":"1099354","route":"I-15","last_update":1780692499,"dir":"N","location_description":"I-15 from MP 146.0 to 148.0","report":"The following road construction project is in progress: road construction with right lane closed, speed limit 35 to 55 mph, and width limit 16 ft northbound until 7:00 PM Friday, July 3, 2026.<br />Shoulder widening with new barrier rail.","category":"cnstr","mrm":147,"headline":"Road Work","label":"I-15<br />from MP 146.0 to 148.0"}},{"geometry":{"coordinates":["-112.515798","46.006055"],"type":"Point"},"properties":{"route":"CONTINENTAL DR","last_update":1780935300,"enhanced_report":"<b>CONTINENTAL DR</b><br>Detour<br>Start Date: 6/8/2026 10:12 AM<br>End Date: &nbsp;&nbsp;6/23/2026 5:00 PM<br><p><b>Additional Information:</b><br>Detour from intersection of 2nd St and Shields Ave to Utah Ave to Harrison Ave to Texas Ave to intersection of Farrell Street.</p>","event_id":"1099383","mrm":1.1,"label":"CONTINENTAL DR","headline":"Road Work","category":"cnstr","location_description":"CONTINENTAL DR","report":"The following road construction project is in progress: road construction with detour until 5:00 PM Tuesday, June 23, 2026.<br />Detour from intersection of 2nd St and Shields Ave to Utah Ave to Harrison Ave to Texas Ave to intersection of Farrell Street."},"type":"Feature","id":"1099383"},{"geometry":{"type":"Point","coordinates":["-108.709800015094","46.3341690705728"]},"id":"1099387","type":"Feature","properties":{"report":"The following road construction project is in progress: from 6:00 AM Monday, June 15, 2026 road construction with travel delay 15 mins, flaggers, lane closures, pilot car, speed limit 35 mph, and width limit 12 ft until 6:00 PM Friday, June 19, 2026.<br />WATCH FOR WORKERS DURING OVERLAY PROJECT","location_description":"US-12 from MP 155.0 to 160.0","dir":"B","category":"cnstr","headline":"Road Work","label":"US-12<br />from MP 155.0 to 160.0","mrm":157.5,"event_id":"1099387","enhanced_report":"<b>US-12  from MP 155.0 to 160.0</b><br>Travel Delay 15 mins<br>Flaggers<br>Lane closures<br>Pilot vehicles<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 6/15/2026 6:00 AM<br>End Date: &nbsp;&nbsp;6/19/2026 6:00 PM<br><p><b>Additional Information:</b><br>WATCH FOR WORKERS DURING OVERLAY PROJECT</p>","last_update":1780936517,"route":"US-12"}},{"geometry":{"coordinates":["-109.187141039795","45.5835076537538"],"type":"Point"},"id":"1099398","type":"Feature","properties":{"label":"S-421<br />from MP 4.5 to 6.0","headline":"Road Work","mrm":5.25,"category":"cnstr","report":"The following road construction project is in progress: from 6:00 AM Tuesday, June 9, 2026 road construction with travel delay 15 mins, pilot car, signal lights, and speed limit 35 mph until further notice.<br />Seal and cover operations, loose chips/gravel on roadway","location_description":"S-421 from MP 4.5 to 6.0","dir":"B","last_update":1780955703,"route":"S-421","event_id":"1099398","enhanced_report":"<b>S-421  from MP 4.5 to 6.0</b><br>Travel Delay 15 mins<br>Pilot vehicles<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 6/9/2026 6:00 AM<br><p><b>Additional Information:</b><br>Seal and cover operations, loose chips/gravel on roadway</p>"}},{"geometry":{"type":"Point","coordinates":["-114.316351281891","48.2402973712819"]},"type":"Feature","id":"674876","properties":{"route":"S-548","last_update":1776789447,"enhanced_report":"<b>S-548  from MP 0.0 to 1.3</b><br>Travel Delay 15 mins<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2026 6:00 AM<br><p><b>Additional Information:</b><br>Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.\n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","event_id":"674876","mrm":0.67,"headline":"Road Work","url":"https://mdt.mt.gov/pubinvolve/reservedrive/","label":"S-548<br />from MP 0.0 to 1.3","dir":"B","report":"The following road construction project is in progress: road construction with travel delay 15 mins, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until further notice.<br />Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nThe Whitefish Stage and West Reserve Drive Intersection is being controlled by Temporary Traffic Signals. Traveling public will be on loose gravel traveling on loose gravel on Whitefish Stage during construction. These will be in place for the duration of the job. The signals will allow 1 direction of travel at a time to accommodate left turns for that direction of traffic. Please plan your travels to allow for additional travel time with this change. \nThe intersection of Hutton Ranch Road and West Reserve Drive will no longer allow left turning traffic from Hutton Ranch onto West Reserve. The intersection will be configured for Right In-Right Out Access Only. There will be No Left Turns from West Reserve onto Hutton Ranch Road as well.\nDue to construction activities and lane configurations for construction a 12-foot width restriction will be in place for West Reserve.","location_description":"S-548 from MP 0.0 to 1.3","category":"cnstr"}},{"geometry":{"type":"Point","coordinates":["-110.853240715469","45.9529996350098"]},"id":"882549","type":"Feature","properties":{"enhanced_report":"<b>MT-86  from MP 24.1 to 28.1</b><br>Motorcycles consider alternate route<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 5/5/2025 7:00 AM<br><p><b>Additional Information:</b><br>Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends. </p>","event_id":"882549","route":"MT-86","last_update":1751314119,"dir":"B","location_description":"MT-86 from MP 24.1 to 28.1","report":"The following road construction project is in progress: road construction with Motorcycles consider alternate route, speed limit 35 mph, and width limit 12 ft until further notice.<br />Speed reduced to 35 mph due to single lane traffic over two bridges with 12-foot width limit. Motorcycles consider alternate route due to gravel surfaces at bridge ends.","category":"cnstr","mrm":26.1,"headline":"Road Work","label":"MT-86<br />from MP 24.1 to 28.1"}},{"geometry":{"type":"Point","coordinates":["-114.117517413352","48.0920991659472"]},"properties":{"last_update":1780345666,"route":"MT-82","event_id":"885957","enhanced_report":"<b>MT-82  from MP 4.5 to 6.9</b><br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Start Date: 8/4/2025 8:00 AM<br>End Date: &nbsp;&nbsp;10/30/2027 5:00 PM<br><p><b>Additional Information:</b><br>Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours. \n\n\n</p><p><a href=\"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx\" target=\"_blank\"><i>Website</i></a></p>","headline":"Road Work","url":"https://www.mdt.mt.gov/pubinvolve/flathead/updates.aspx","label":"MT-82<br />from MP 4.5 to 6.9","mrm":5.7,"report":"The following road construction project is in progress: road construction with flaggers, signal lights, and speed limit 35 mph until 5:00 PM Saturday, October 30, 2027.<br />Flathead River/Sportsman Bridge Project -Crews will be on site Monday through Friday, from 7 am to 6 pm. Preparation for the Bridge & Road Construction are underway. All work is dependent on the weather and other unforeseen factors. Please slow down and watch for workers and equipment entering/exiting the project area. \nRiver Traffic: Once barges are in place and bridge construction begins, the waterway will remain open. Boaters are advised to use caution, especially during working hours.","location_description":"MT-82 from MP 4.5 to 6.9","dir":"B","category":"cnstr"},"type":"Feature","id":"885957"},{"geometry":{"type":"Point","coordinates":["-112.703557323067","45.5258384721225"]},"properties":{"route":"N HIGHWAY 91","last_update":1754947373,"enhanced_report":"<b>N HIGHWAY 91</b><br>ROAD CLOSED<br>Start Date: 10/22/2024 2:40 PM<br><p><b>Additional Information:</b><br>MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.</p>","event_id":"886173","mrm":22.45,"headline":"Road Work","label":"N HIGHWAY 91","report":"The following road construction project is in progress: road closed until further notice.<br />MT Hwy 91 is CLOSED to through traffic due to bridge out at the Big Hole River structure. There is no estimated time of reopening. Through traffic must use an alternate route.","location_description":"N HIGHWAY 91","category":"cnstr"},"id":"886173","type":"Feature"},{"properties":{"location_description":"S-292 from MP 0.0 to 2.6","report":"The following road construction project is in progress: road construction with travel delay 15 mins, detour, flaggers, signal lights, speed limit 35 mph, and width limit 12 ft until further notice.<br /> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time.","dir":"B","category":"cnstr","label":"S-292<br />from MP 0.0 to 2.6","url":"https://mdt.mt.gov/pubinvolve/reservedrive/","headline":"Road Work","mrm":1.28,"event_id":"887347","enhanced_report":"<b>S-292  from MP 0.0 to 2.6</b><br>Travel Delay 15 mins<br>Detour<br>Flaggers<br>Signal lights<br>Speed Limit 35 mph<br>Width Limit  12 feet<br>Start Date: 3/23/2025 7:00 AM<br><p><b>Additional Information:</b><br> Watch for Trucks and Workers entering/leaving the work zone. Lane Configurations are to be expected. Please watch for workers and equipment throughout the project area.\nIntersection is still controlled by Temporary Signals that allow traffic to travel in 1 direction at a time. \n</p><p><a href=\"https://mdt.mt.gov/pubinvolve/reservedrive/\" target=\"_blank\"><i>Website</i></a></p>","last_update":1775737054,"route":"S-292"},"type":"Feature","id":"887347","geometry":{"type":"Point","coordinates":["-114.308729957856","48.2591177007456"]}},{"type":"Feature","id":"912666","properties":{"last_update":1777392225,"route":"MT-200","event_id":"912666","enhanced_report":"<b>MT-200  from MP 51.0 to 52.0</b><br>Travel Delay 10 mins<br>Speed Limit 35-55 mph<br>Start Date: 11/21/2025 3:13 PM<br><p><b>Additional Information:</b><br>Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations resume in Spring 2026.</p>","headline":"Road Work","label":"MT-200<br />from MP 51.0 to 52.0","mrm":51.5,"category":"cnstr","report":"The following road construction project is in progress: road construction with speed limit 35 to 55 mph and travel delay 10 mins until further notice.<br />Culvert removal and replacement. Approximately 300-500 feet of gravel road until Paving Operations resume in Spring 2026.","location_description":"MT-200 from MP 51.0 to 52.0","dir":"B"},"geometry":{"type":"Point","coordinates":["-104.592468238838","47.7030562308994"]}},{"geometry":{"coordinates":["-106.138792009437","47.3255728190287"],"type":"Point"},"properties":{"event_id":"954771","enhanced_report":"<b>MT-200  from MP 246.8 to 253.5</b><br>Speed Limit 35 mph<br>Width Limit  14 feet<br>Start Date: 12/17/2025 8:46 PM<br><p><b>Additional Information:</b><br>CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH </p>","last_update":1766029889,"route":"MT-200","category":"cnstr","report":"The following road construction project is in progress: road construction with width limit 14 ft and speed limit 35 mph until further notice.<br />CAUTION: MUDDY ROAD CONDITIONS / 14' WIDTH RESTRICTION / 35 MPH","location_description":"MT-200 from MP 246.8 to 253.5","dir":"B","label":"MT-200<br />from MP 246.8 to 253.5","headline":"Road Work","mrm":250.15},"id":"954771","type":"Feature"}],"type":"FeatureCollection"}